HomeMy WebLinkAbout20160502 Ver 1_Bridge 40 SR 1116 Guilford Co - NWP 14 - SAW-2014-00891_20160621Carpenter,Kristi
From:
Sent:
To:
Cc:
Subject:
Attachments:
Follow Up Flag:
Flag Status:
Harmon, Beth
Tuesday, June 21, 2016 2:44 PM
Bailey, David E SAW; Parker, Jerry A; Thomson, Nicole J
Wrenn, Brian L; Tugwell, Todd SAW; Mills, James M; Corbett, Cindy M SAW;
Carpenter,Kristi; Fitzpatrick, Linda F
RE: Bridge 40 SR 1116 Guilford Co - NWP 14 - SAW-2014-00891
SR 1116 - Bridge 40 - Division 7- STR - CF 03 - Guilford.pdf
Follow up
Completed
Dave -- Please see attached the signed mitigation responsibility transfer form for the bridge replacement project on SR
1116 in Guilford County (USACE Action ID 2014-00891). Please let me know if you need anything else for this project.
Beth
Beth Harmon
NCDOT Coordinator
Division of Mitigation Services
Department of Environmental Quality
919-707-8420 office
beth.harmon@ncdenr.gov
1652 Mail Service Center
Raleigh, North Carolina 27699-1652
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
-----Original Message-----
From: Bailey, David E SAW [mailto:David.E.Bailey2@usace.army.mil]
Sent: Wednesday, June 15, 2016 1:35 PM
To: Harmon, Beth <beth.harmon@ncdenr.gov>; Parker, Jerry A<jparker@ncdot.gov>; Thomson, Nicole J
<njthomson2@ncdot.gov>
Cc: Wrenn, Brian L<brian.wrenn@ncdenr.gov>; Tugwell, Todd SAW <Todd.Tugwell@usace.army.mil>; Harmon, Beth
<beth.harmon@ncdenr.gov>; Mills, James M<mmills@ncdot.gov>; Corbett, Cindy M SAW
<Cindy.M.Corbett@usace.army.mil>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Subject: RE: Bridge 40 SR 1116 Guilford Co - NWP 14 - SAW-2014-00891
You're right, Beth. Sorry about that. Please see the revised MrT Form attached. Note to NCDOT: the attached form
replaces the same form emailed this morning with the Nationwide Permit 14 verification for the above referenced
project. Please let me know if you have any questions.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax:(919)562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Harmon, Beth [mailto:beth.harmon@ncdenr.gov]
Sent: Wednesday, June 15, 2016 12:29 PM
To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil>
Subject: [EXTERNAL] RE: Bridge 40 SR 1116 Guilford Co - NWP 14 - SAW-2014-00891
Hi Dave -- I was processing this permit when I noticed that the project description on the NWP 14 permit and the
mitigation responsibility transfer form do not match. Can you re-send the mitigation responsibility transfer form that
goes with the Guilford County bridge replacement on SR 1116?
Thanks
Beth.
Beth Harmon
NCDOT Coordinator
Division of Mitigation Services
Department of Environmental Quality
919-707-8420 office
beth.harmon@ncdenr.gov
1652 Mail Service Center
Raleigh, North Carolina 27699-1652
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
-----Original Message-----
From: Bailey, David E SAW [mailto:David.E.Bailey2@usace.army.mil]
Sent: Wednesday, June 15, 2016 10:34 AM
To: Parker, Jerry A<jparker@ncdot.gov>; Nicole Thomson <nthomson@sepiengineering.com>; Thomson, Nicole J
<njthomson2@ncdot.gov>
Cc: Wrenn, Brian L<brian.wrenn@ncdenr.gov>; Tugwell, Todd SAW <Todd.Tugwell@usace.army.mil>; Harmon, Beth
<beth.harmon@ncdenr.gov>; Mills, James M<mmills@ncdot.gov>; Corbett, Cindy M SAW
<Cindy.M.Corbett@usace.army.mil>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Subject: Bridge 40 SR 1116 Guilford Co - NWP 14 - SAW-2014-00891
Nikki and Jerry,
I have attached the Nationwide Permit 14 verification including Special Conditions and terms and conditions for the
above referenced project to this email. Please note the Compensatory Mitigation requirement. Please let me know if
you have any questions.
Sincerely,
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatorv Miti�ation Responsibilitv Transfer Form
Permittee: North Carolina Department of Transportation Action ID: SAW-2014-00891
Project Name: NCDOT / SR 1116 / Bridge 40 / Division 7/ Guilford County County: Guilford
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8-digit Hydrologic Unit Code (HUC�, multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03030003, Cape Fear River Basin
Stream Impacts (linear feet) Wetland Impacts (acres)
Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal
91
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requii
Stream Mitigation (cred
Warm Cool
182
Cold
HUC and Basin:
Wetland Mitigation
Riparian Riverine Riparian Non-Riverine
Fear River Basin
an � Coastal
Mitigation Site Debited: NCDMS
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to atcept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also �erify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Nam
Sponsor's
Signature of Sponsor's
Represe
Representative
�
Date of�Signat�re
Page 1 of 2 Form Updated 23 November, 2�15
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions:
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsorshould provide copies of this form along with an updated bank ledger to:1) the Permittee, 2J the 11SACE
Project Manager at !he oddress below, ond 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 FaNs
of Neuse Road, Wake Forest, NC27587(email: todd.tugwell@usace.army.milJ. Questions regarding this form or any of the
permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager:
USACE Field Office:
Email:
David Bailey
Raleigh Regulatory Field Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 1�5
Wake Forest, North Carolina 27587
David.E.Bailev2@usace.armv.mil
�%�!� Digitally signed by BAILEY.DAVI�.E.1379283736
i�:� /� DN: c=US, o=U.S. Government, ou=DoD� ou=PKl,
� �i ou=USA, cn=BAILEY.DAVID.E.1379283736
Date: 201 fi.06.15 1331:44 -�4'00'
USACE Project Manager Signature
June 15. 2016
Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.armv.mil.
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our website at http://reaulatorv.usacesurvev.com/ to complete the survey online.