Loading...
HomeMy WebLinkAboutNCG080845 DMR SW (2) ADDRESS TEL MB SMITH': GA R D N E R 14 N Boylan Avenue,Raleigh NC 27803 319 828.0577 WWW smithgardnennc corn ENGINEERS-- RECEIVED January 28,2015 NCDENR ,�1t�j „, 015 1Th�'.;y j=11. i Stormwater Permitting Program DWR SECTION Attention: Central Files 1628 Mail Service Center Raleigh, NC 27699-1617 RE• Year Two Tier 2, Discharge Monitoring Report— March-June, 2014 Waste Industries, USA— Durham Facility Certificate of Coverage#NCG080845 General Permit#NCG080000 Dear Sir/Madam. Smith+Gardner(S+G) is submitting this Year two, Periods 7 through 12 Tier 2, Discharge Monitoring Report (DMR)for stormwater monitoring at the Waste Industries, USA—Durham Facility. The site is located in Durham, North Carolina. The facility is permitted to discharge stormwater related to activities that have Vehicle Maintenance Areas under the NPDES program by the General Permit No. 080000 (permit), issued by the North Carolina Department of Environment and Natural Resources, Division of Water Quality(DWQ). For this submittal we are providing you with one (1) copy of the DMR report A full report will be kept onsite which includes the following items• 1. Stormwater Discharge Outfall(SDO) Report, 2. Qualitative Monitoring forms for the December event; 3 Laboratory data. As required by the permit,analytical and qualitative monitoring of the discharge will continue The site has notified the regional supervisor of Tier 3 status. Currently, .S+G has responded to three(3) rounds of comments received from the City of Durham for the new Basin design to be installed. . It is S+G's understanding is that if all Durham City/County departments are in agreement with our responses final approval will move forward The Stormwater Permitting Program will be informed as soon as this approval is granted (expected early 2015). If you have any questions, or require further Information, please contact me at(919)828-0577 ext. 224 or by email at don(dsmithgardnerinc.com. Sincerely, SMIT GAR.. E•,, C. X Don Mis- hei er Projec ' cientist CC. File Attachment K\Projects\Durham LCID Landfill\DURHAM 12-1(NPDES Monitoring)\Monitoring Reports Reports\2014\DWQnpdes_Tier2_2014_012815 docx Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted 2014 CERTIFICATE OF COVERAGE NO. NCGO8 0 8 4 5 SAMPLE COLLECTION YEAR 2014 FACILITY NAME Waste Industries USA - Durham Facility SAMPLE PERIOD ❑Jan-June ❑July-Dec COUNTY Durham or Q Monthly, July---Dec 2014 (month) PERSON COLLECTING SAMPLES Don Misenheimer (S+G) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Pace Laboratories Lab Cert.# 37.706 ❑Zero-flow ['Water Supply DSA OOther WS-v; NSW Comments on sample collection or analysis: PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? x yes _no (if yes, report your analytical results in the table immediately below) Part A:Vehicle Maintenance Areas Monitoring Requirements(If applicable) ❑ No discharge this period1 Outfall Date 00530 00400 00556 - No. Sample Collected, Total Suspended pH, Non-Polar Oil and Grease/TPH EPA New Motor Oil Usage, mo/dd/yr Solids, mg/L Standard units Method 1664(SGT-HEM),mg/L Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0—9.0 15 - 001 July----Nov 2014 No Sampleable Discharge 001 12.22.14 980 6.8 9.8 145 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals(If applicable) Outfall Date 00556 00530 - 00400 No. Sample Collected, Non-Polar Oil and Grease/TPH EPA Method Total Suspended Solids, pH, mo/dd/yr 1664(SGT-HEM), mg/L mg/L Standard units Permit Limit - 15 50 or 100 see permit 6.0—9.0 1 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11,2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: , Date 12.22.a.s(first event sampled) Total Event Precipitation (inches): 0.41 Date (list each additional event sampled this reporting period,and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES x❑NO❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑x NO E REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including ail"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information, the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." �.�`�� //zcf/75 gnature o Pe mittf ee)/ (Date) Additional copies of this form may be downloaded at: http://portal.ncclenr.org/web/wq/ws/su/npdessw#tab-4 SWU-25() last rcvised April 11,2013 Page 2 of 2