HomeMy WebLinkAboutNCG030326 DMR SW (13) Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 12/22/15
CERTIFICATE OF COVERAGE NO. C�G.03� .03,26 SAMPLE COLLECTION YEAR 2015
FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑Jan-June ❑July-Dec
COUNTY Nash or ® Monthly1 December month)
PERSON COLLECTING SAMPLES Roger Breeden DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout EPNA
LABORATORY Microbac Lab Cert.#11 ®Zero-flow ❑Water Supply ESA
Comments on sample collection or analysis: RECEIVED ®Other
JAN 06 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 3
Part A: Stormwater Benchmarks and Monitoring Results CENTRAL FILES
DWR SECTION
® No discharge this period?2
Non-Polar O&G/
Date Sample 24-hour rainfall pH, Total Toxic
Outfall No. Collected) amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics
(mo/dd/yr) Inches' Hydrocarbons
Benchmarks===> _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L
01 12/2/15 0.89 0.040
02 12/2/15 0.89 0.052
1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Semi-annual Stormwater Discharge Monitoring Report I
for North Carolina Division of Water Quality General Permit No. NCG080000
Date submitted
'"'--4.",,4---1--t-N-,-'--- , SAMPLE COLLECTION YEAR 2015
CERTIFICATE OF COVERAGE NO. NCG08-0` =.=5--� Text
FACILITY NAME Yarbrough Transfer Co.- Doune St SAMPLE PERIOD ❑Jan-June ❑✓ July-Dec
COUNTY Forsyth ■�� or El Monthly1 (month)
E
PERSON COLLECTING SAMPLES Peter H. DeVries E ET ING TO CLASS ❑ORW ❑HQW ['Trout ❑PNA
LABORATORY R&A Laboratories Lab Cert.# 34 JAN 0 4 2016 ❑Zero-flow ['Water Supply OSA
Comments on sample collection or analysis: ❑Other Class C
Field pH by Geoscience &Technology, NC#5643 CENTRAL FILES
DWR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE 4
Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no
(if yes, report your analytical results in the table immediately below)
Part A:Vehicle Maintenance Areas Monitoring Requirements(If applicable) ❑ No discharge this period'
Outfall Date 00530 00400 00556
No. Sample Collected, Total Suspended pH, Non-Polar Oil and Grease/TPH EPA New Motor Oil Usage,
mo/dd/yr Solids, mg/L Standard units Method 1664(SGT-HEM), mg/L Annual average gal/mo
Benchmark - 50 or 100 see permit Within 6.0—9.0 15 -
002 10/27/15 30.0 6.67 8.78 135
Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals(If applicable)
Outfall Date 00556 00530 . 00400
No. Sample Collected, Non-Polar Oil and Grease/TPH EPA Method Total Suspended Solids, pH,
mo/dd/yr 1664(SGT-HEM),mg/L mg/L Standard units
Permit Limit - 15 50 or 100 see permit 6.0—9.0
1 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
SWU-250 last revised April 11,2013
Page 1 of 2
STORM EVENT CHARACTERISTICS:
Date 10/27/15(first event sampled)
Total Event Precipitation(inches): 1.25
Date (list each additional event sampled this reporting period,and rainfall amount)
Total Event Precipitation(inches):
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO ✓❑
IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in
the case of"No Discharge"reports)to:
Division of Water Quality
Attn:DWQ Central Files
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons
directly responsible .r gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that
there are significa penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
jOco. 4at(brok 1 1)- . . Pr _ff-ke.f P a IS
(SignaerPermittee) (Dat )
Additi0 .l copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4
SWU-250 last revised April 11,2013
Page 2 of 2