Loading...
HomeMy WebLinkAboutNCG030326 DMR SW (13) Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 12/22/15 CERTIFICATE OF COVERAGE NO. C�G.03� .03,26 SAMPLE COLLECTION YEAR 2015 FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑Jan-June ❑July-Dec COUNTY Nash or ® Monthly1 December month) PERSON COLLECTING SAMPLES Roger Breeden DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout EPNA LABORATORY Microbac Lab Cert.#11 ®Zero-flow ❑Water Supply ESA Comments on sample collection or analysis: RECEIVED ®Other JAN 06 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 3 Part A: Stormwater Benchmarks and Monitoring Results CENTRAL FILES DWR SECTION ® No discharge this period?2 Non-Polar O&G/ Date Sample 24-hour rainfall pH, Total Toxic Outfall No. Collected) amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics (mo/dd/yr) Inches' Hydrocarbons Benchmarks===> _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 01 12/2/15 0.89 0.040 02 12/2/15 0.89 0.052 1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Semi-annual Stormwater Discharge Monitoring Report I for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted '"'--4.",,4---1--t-N-,-'--- , SAMPLE COLLECTION YEAR 2015 CERTIFICATE OF COVERAGE NO. NCG08-0` =.=5--� Text FACILITY NAME Yarbrough Transfer Co.- Doune St SAMPLE PERIOD ❑Jan-June ❑✓ July-Dec COUNTY Forsyth ■�� or El Monthly1 (month) E PERSON COLLECTING SAMPLES Peter H. DeVries E ET ING TO CLASS ❑ORW ❑HQW ['Trout ❑PNA LABORATORY R&A Laboratories Lab Cert.# 34 JAN 0 4 2016 ❑Zero-flow ['Water Supply OSA Comments on sample collection or analysis: ❑Other Class C Field pH by Geoscience &Technology, NC#5643 CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A:Vehicle Maintenance Areas Monitoring Requirements(If applicable) ❑ No discharge this period' Outfall Date 00530 00400 00556 No. Sample Collected, Total Suspended pH, Non-Polar Oil and Grease/TPH EPA New Motor Oil Usage, mo/dd/yr Solids, mg/L Standard units Method 1664(SGT-HEM), mg/L Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0—9.0 15 - 002 10/27/15 30.0 6.67 8.78 135 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals(If applicable) Outfall Date 00556 00530 . 00400 No. Sample Collected, Non-Polar Oil and Grease/TPH EPA Method Total Suspended Solids, pH, mo/dd/yr 1664(SGT-HEM),mg/L mg/L Standard units Permit Limit - 15 50 or 100 see permit 6.0—9.0 1 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11,2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 10/27/15(first event sampled) Total Event Precipitation(inches): 1.25 Date (list each additional event sampled this reporting period,and rainfall amount) Total Event Precipitation(inches): Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO ✓❑ IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible .r gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significa penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." jOco. 4at(brok 1 1)- . . Pr _ff-ke.f P a IS (SignaerPermittee) (Dat ) Additi0 .l copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised April 11,2013 Page 2 of 2