HomeMy WebLinkAbout20081473 Ver 4_Arrington buffer remediation complete_Phase I_20160622res
Memo
To: Katie Merritt, DWR
From: Brian Hockett , RES
cc: File
Date: June 22, 2016
Arrington Bridge Phase I — Year 1 Monitoring
Re: Remedial Actions Memo #2
Per the November 3, 2015 email response from Katie Merritt (DWR) referencing the Year 1
monitoring report for the Arrington Bridge Phase I and Phase I Expansion Bank Parcels, RES
is providing a summary for remediation as requested.
1. A supplemental planting plan for the 3.07 acres that were mowed and/or disked
which shall include 1) a proposed deadline to complete the replanting, 2) a
commitment to flag all stems that will be planted, 3) a commitment to provide
post -planting pictures of the replanted areas, 4) stem count data for Plot 8 post
planting.
RES staff took immediate action to remediate the easement encroachment of 3.07
acres at the Arrington Bridge Phase I and Phase I Expansion. A supplemental
planting was performed in the months of February and May 2016 for all
encroachment areas. As requested by DWR, all supplemental tree stems planted in
the encroachment areas were flagged with marking tape. Vegetation Plot 8 corners
were re-established and planted. Stem totals within VP8 yielded 39 stems (1,575
trees/acre). As part of RES's active preventative action, in mid-October 2015 RES
planted 3 -gallon container trees along the easement edge and posted additional
easement marking signs. Our intentions are that planting larger trees along the
boundary will help to provide a visual boundary between the agriculture fields and the
conservation easement. RES has also discussed with the landowner and persons
responsible for the easement encroachment to ensure it doesn't happen again. Photos
of the tree plantings, Vegetation Plot 8, and additional easement signage are provided
below.
RES has performed all requested remedial action items and is requesting the remaining 5%
credit release for MY1 from the Arrington Bridge Phase I and Phase I Expansion site. Please
let me know if you have additional concerns or questions.
Thanks,
Brian Hockett, PLS
NC Operations Manager
Icy
10055 Red Run Blvd.
Suite 130
Owings Mills, MD
21117
412 N. 4th St. Suite 300
Baton Rouge, LA
70802
1307 Broad Street
Camden, SC
29020
1514 South Church Street
Suite 103
Charlotte, NC
28203
5020 Montrose Blvd.
Suite 650
Houston, TX
77006
1200 Camellia Blvd.
Suite 220
Lafayette, LA
70508
137 1/2 East Main Street
Suite 210
Oak Hill, WV
25901
380 Southpointe Blvd.
Plaza II, Suite 405
Canonsburg, PA
15317
909 Capability Drive
Suite 3100
Raleigh, NC
27606
Installed additional easement boundary markers along encroachment areas.
Installed additional easement boundary markers along encroachment areas.
Planted 3 -gallon container trees on Easement Boundary.
Planted 3 -gallon container trees along Easement Boundary.
Vegetation Plot 8 Re-established corners and planted. (39 trees — 1,575 trees/acre)
Replanting within the encroachment areas.