Loading...
HomeMy WebLinkAbout20081473 Ver 4_Arrington buffer remediation complete_Phase I_20160622res Memo To: Katie Merritt, DWR From: Brian Hockett , RES cc: File Date: June 22, 2016 Arrington Bridge Phase I — Year 1 Monitoring Re: Remedial Actions Memo #2 Per the November 3, 2015 email response from Katie Merritt (DWR) referencing the Year 1 monitoring report for the Arrington Bridge Phase I and Phase I Expansion Bank Parcels, RES is providing a summary for remediation as requested. 1. A supplemental planting plan for the 3.07 acres that were mowed and/or disked which shall include 1) a proposed deadline to complete the replanting, 2) a commitment to flag all stems that will be planted, 3) a commitment to provide post -planting pictures of the replanted areas, 4) stem count data for Plot 8 post planting. RES staff took immediate action to remediate the easement encroachment of 3.07 acres at the Arrington Bridge Phase I and Phase I Expansion. A supplemental planting was performed in the months of February and May 2016 for all encroachment areas. As requested by DWR, all supplemental tree stems planted in the encroachment areas were flagged with marking tape. Vegetation Plot 8 corners were re-established and planted. Stem totals within VP8 yielded 39 stems (1,575 trees/acre). As part of RES's active preventative action, in mid-October 2015 RES planted 3 -gallon container trees along the easement edge and posted additional easement marking signs. Our intentions are that planting larger trees along the boundary will help to provide a visual boundary between the agriculture fields and the conservation easement. RES has also discussed with the landowner and persons responsible for the easement encroachment to ensure it doesn't happen again. Photos of the tree plantings, Vegetation Plot 8, and additional easement signage are provided below. RES has performed all requested remedial action items and is requesting the remaining 5% credit release for MY1 from the Arrington Bridge Phase I and Phase I Expansion site. Please let me know if you have additional concerns or questions. Thanks, Brian Hockett, PLS NC Operations Manager Icy 10055 Red Run Blvd. Suite 130 Owings Mills, MD 21117 412 N. 4th St. Suite 300 Baton Rouge, LA 70802 1307 Broad Street Camden, SC 29020 1514 South Church Street Suite 103 Charlotte, NC 28203 5020 Montrose Blvd. Suite 650 Houston, TX 77006 1200 Camellia Blvd. Suite 220 Lafayette, LA 70508 137 1/2 East Main Street Suite 210 Oak Hill, WV 25901 380 Southpointe Blvd. Plaza II, Suite 405 Canonsburg, PA 15317 909 Capability Drive Suite 3100 Raleigh, NC 27606 Installed additional easement boundary markers along encroachment areas. Installed additional easement boundary markers along encroachment areas. Planted 3 -gallon container trees on Easement Boundary. Planted 3 -gallon container trees along Easement Boundary. Vegetation Plot 8 Re-established corners and planted. (39 trees — 1,575 trees/acre) Replanting within the encroachment areas.