Loading...
HomeMy WebLinkAbout20051171 Ver 3_Application_20080218~ ~ r AO~ Nj A r~ Michael F. Easfey, Governor ,~-~~, ~Q William G. Ross Jr., Secretary ~ ' ~O North Carolina Department of Environment and Natural. Resources ~0 ~`' G p ~ ~ Coleen H. Sullins, Director. >_ (~[.J~ --1 Division of WaterQuality ~ Y -North Carolina Division of Water Quality Transportation Permitting Unit In-Field Minor 401 Water Quality Certification, Buffer Certification and.Isolated Waters Permit Modification Project Name/T1P Project No.: t,..,~`r,~'~"~~ ~ Date: ° ~~w DUT Division: ~ County: ~ r.~~v~~~~ DWQ Project No./Permit Type: ~~~ ~a`1 ~ `~~ ~. { -~ ~~~~ UO"I' Statt: ~,~'~ ,~~.; ~ ~ DWQ Staff: -~^G~'c~.i tir"~''~ t"~~ ACE Staff DWQ Regional Office: ~` Modification Description; N~,o,,, ~`t Carolina Transportation Permitting Unit ,NQtllCll~~if i650 Maif Service Center, Ralegh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250,Raleigh, North Carolina 27604 Phone: 919-733-17861FAX 919-733-689311ntemet http:i!h2o.enr.state.nc.uslncwetlands ... `P In-Field Modification Page 2 of 3 ,; This in-field modification is required for the following reason(s): The information contained in the application or presented in support thereof is incorrect in the ~ following manner: ©' Conditions under which the original certification was issued have changed in the following manner: yy 1 1 • ~pl~t}?.t~d/4 2.C~ ~w.D"' 3"'y can ~~ri w~t~Gt InJO>r~ 1~'bfp•Tr~Cit~i~ tS f"-a[" or• +'h ~ This in-field modification is valid only if issued by an authorized agent of the NC Division of Water Quality, Transportation Permitting Unit'. This in-.field modification authorizes the NCDOT to .a.t~ ('~twWi°. ~"c a~l-~lCt i .a.~~ ~ ,. I,~,Aw•~^C.~ (,+ubf~ 1Yabf+-.~ot~uWy in ~" ~~ ae v~ CountY• The project shall be constructed as described in the Modification Description and Sketch on Page 1 of this document dated ,'~~ t~- °~ to improve/construct the section of to :The approved +~~ v ~, ;o that-extends-from ,a ~ NG 4' design is that described in the Modification Description and Modification Sketch on Page 1 of this document dated ~_~ ~ -,~~ .Any further changes to the owl Water Quality Certification-dated /~~ ~Gl ~:~ ~ may require a formal written modification request. The description of the proposed action provides adequate assurance. that the proposed action. in the _ /~ ~~ 5 ~.. River Basin in conjunction with-the proposed. development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95 2'17 if conducted in accordance with the application and conditions hereinafter set forth. Should your project change, you are required to notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with ali the conditions. For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with your project including (but not limited to) .Sediment and Erosion control,. Coastal Stormwater, Non-discharge and Water .Supply watershed. regulations.. This Modification Approval shall expire on the same day as the expiration date of the corresponding Corps of Engineers Pemit. Condition(s) of Modification Approval: 1. As-built drawings of the proposed action shall be submitted to the NC DWQ Transportation Permitting Unit within 30-days of the completion of the action. 2. All the authorized activities and conditions of the certification associated with the original Water Quality Certification dated trA~-? ~=~ ~" and all other corresponding modifications still apply except where superceded by this certification. Failure to construct the proposed action as described in the Modification Description and Sketch on Page 1 of this document and/or violations of any condition herein set forth may result in revocation of this modification approval and may result in criminal and/or civil penalties. This modification approval shall become null and void unless the above conditions are made conditions of the Federa1404 and/or Coastal Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404 permit for the proposed action, then NC DWQ .must require a formal written modification to the 401 WQC, and therefore, this in-field modification is invalid. If additional (wetland, stream, buffer) impacts. for this project (now or in the future) exceed (one acre, 1501inear feet, or one-third of an acre/150 linear feet, respectively), or if mitigation is required above and beyond the current mitigation requirements for this project, this in-field modification is invalid and a formal written modification is required. This in-field modification is effective upon the date the last party signs this document.. This in-field modification is made upon mutual agreement between DOT and DWQ as indicated by the signatures below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made within sixty (60) days of notification pursuant to the contested case provisions of the Administrative Procedure Act, N.C. Gen. Stat. § 150B-23 et seg• DWQ Staff Signature: %' ~;%; l ~'/ ~ ; ~' ~? Date: ..`.~ / ,' - ~ ~,ti DOT Staff Signature: i ~~/f ,' ~ ~:' ~- - ~ ~~ Date. , ``~: ,f t~, ~ ~~ ~ - ~_~ F Staff Signature: Date: ~ - An authorized agent of the Transportation Permitting Unit is defined as DWQ staff that are DOT-funded and review and issue 401 Water Quality Certifications for DOT projects. These staff include Central Office and Regional Office personnel. RE: Craven 35 Bridge Replacement Subject: RE: Craven 35 Bridge Replacement From: "Travis Wilson" <travis.wilson@ncwildlife.org> Date: Fri, 15 Feb 2008 10:26:04 -0500 To: "'Gazcy.Wazd"' <gazcy.wazd@ncmail.net> CC: <msutton@dotstate.nc.us> Garcy with the detection of downstream weirs impeding fish passage on Both Craven 50 and Craven 35 bridge replacement projects WRC does not request an in-water work moratorium for these two projects. Travis W. Wilson Eastern Region Highway Project Coordinator Habitat Conservation Program NC Wildlife Resources Commission 1142 I-85 Service Rd. Creedmoor, NC 27522 Phone: 919-528-9886 Fax: 919-528-9839 Travis.Wilson@ncwildlife.orq -----Original Message----- From: Mike Sutton [mailto:msutton@dot.state.nc.us] Sent: Friday, February 15, 2008 10:15 AM To: Travis Wilson Subject: Re: Craven 35 Bridge Replacement Travis....Craven 35 is a former NC Moving Ahead Project and is being handled by Division 2.....both Craven 35 and Craven 50 have concrete and sheet piling weirs downstream from the bridges and both are planned on being removed. Both weirs are almost identical in shape and building construction. Thank You.....mike Travis Wilson wrote: I have a couple of comments and a couple of questions. Although the DMF map is an excellent tool to help identify if a stream does I have anadromous usage, it is not inclusive of all applicable streams. When I DOT contacts WRC for a bridge replacement project I coordinate directly with I the fisheries biologist for that area to determine what the resources are in the system, and I request the appropriate minimization measures Currently I have not located WRC. comments for this project Also, DWQ asked me about the moratorium on Bridge # 50 a couple of months ago and I the only information I had was the old permit from 2005 with the moratorium listed as condition 19, therefore I suggested retaining the moratorium. However in the last few weeks I was made aware of a concrete barrier that would block fish passage during low flow periods, something that may 1 of 2 2/18/2008 10:23 AM