Loading...
HomeMy WebLinkAbout20160602 Ver 1_Shoreline Stabilization_20160616State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: 5SGP 10-2013 Shoreline Stabilization Application F PAI Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Applicant Information [15A NCAC 02H .0502(ag 1. Owner Info Name: IV I I' o Mailing Address: X80 ;-7 28160602 1(L Oe �r Telephone Number: 7042111 5140 Fax Number: E-mail Address: 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: htto://www.saw.usace.armv.mil/Portals/59/docs/resulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.Ddf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: 11. Project Information 1`15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the,diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: -r- e--ta eA Nearest Town: T oA ria n Subdivision name or site address (include phase/lot number): 130 S{ e �` •rid �r rt(O SNA I/C C.S 16 6 Directions to site - please include ro'a'd names and numbers, landmarks, etc.: 0Cl S �a�R ��' e �' on mprr.svn 'VW) Latitude (in decimal degrees) W. 0- Longitude (decimal degrees)_- g0.9a �M' 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): L) n,} Vd 6, t 6. Property size (acres): 1,01-) 7. Lake/ river/ ocean adjacent to property: a �,t Vor-r^,vn 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): a4�+1_na no lq agf%L ievtL 9. Will work be coo--nducted from land? 00' From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 760 s a 4 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (numberv of trees, for instance):: . ,-eLs 165 4 "N 5 '%C, 4 ,a 44617 Owner/Agent's Signature P.WL".J oa,/),, ► x/7116 Printed Name [15A NCAC 02H .0502(f)l "Agent's signature is valid only if an authorization letter from the owner is provided. Date FORM: SSGP 10-2013 Page 2 of 3 Ft Normz S La ke Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 6/7/2016 Google Maps Go gle Maps Q 3 lin D Q tP i]2f MPtlfa�d Ln c� Ice�v`ei'd 144' k pun q n O� �aµ�k iuz .d` Nh 3 G le a Stdltya 1, h96 Map data ©2016 Google 200 ft a z l ScWm lm - bv— hdps://Www.gooe.com/maps/@35.6531198,-80-9254236,17Z 6J7rM6 AWCONNEUGIS WEB 1405TING '1 I -A, 138 1 138 1 100 w CmwdGlS Feahre Report 154 "C'I AO QO 1 .52 Feet Printed June 07, See Now for Disd Addresses Infrastructure ® NonResidential Use Residential Use Streets ® Interstate Ramp ® US Ht-ry State Hwy —' Main Road — Local Road Residential Private Inactive Parcels Hooks Parcels City Limits L._ Lake Norman El Iredell Countylire LJ. IAC Counties h JAreMl.c=*W. gis =nA)owr>foadFile_astoM= aW mapeddM27 473FJbtV htm t=prin1lid 1!2 K Q�� F - ey! • N i QQ . Q� y�OgFd Mob Cf Uy�R n1m��0 'tee A g y —al z — S Q- V ou � S +•O; KO§ °��Azza o£a �CrAi � ANO `pV� " 4 P? Ga Ps'y� ru* �"'caom ^1w1 7l�%ror3 a E3 o.■..I ala 4 � I �a e� Y a Ila v g�d SRI SRIs lla�a9 Cv� %\ \ \11 r\\ .\ , \ 4 � • Flog � f l / 1 / .44 0 / / o / i I IR SC / • � I I / fi0 i I �t lip v a" i e .eEo a as e ey! • N i a E3 o.■..I ala 4 � I �a e� Y a Ila v g�d SRI SRIs lla�a9 Cv� %\ \ \11 r\\ .\ , \ 4 � • Flog � f l / 1 / .44 0 / / o / i I IR SC / • � I I / fi0 i I �t lip v a" i e .eEo a as e 10 .4. 4 r 40 1 t *r {may .�, y• 'y`��@'�'. Ati'f 1`- s.) �~ , ' ... �i `. it 4��i Y :•... j1 �\\�� ,�T. Y� _ I 1 r i - ll Jig •, J a.�» "ti^a•+r•'. .` ,�� �nIvei� }} � • , •Y R^aarT,l� +� �`r, , R "'�. -� a, : :r 4'• i �; r x r ^" r, ?1 { for, k. '► �. fill "; ar ` •i', i� � 1. � •� � +max • 4 N%�. ~� �' ' - R.. eA AA 114 V,..1 .0.0- M4 'Y i°if !!• �t� r , � �. ' C ;;;, #.r, ' «y ;,••' "moi"� ; f�. `z 1C'yiit ��,• �, • .'�Cl�� �,.-{,�- - `.. � Av Ai'�.< •�1Y'. ; ''�►,; _ �'r♦��_ a �" .. �v, r^ .�... r. ' �' yf ` � Y . ��, t►`- �! , , , " �t `f ��� 1_ .�'f►d .t �,t� � . � y �t . h^� , .r !: , � , •„{FIs' 'yt ,,, . ; J!� 1. r •Y♦ t •_ `r. •�4p ' � '�-.TV�kiS t1ti�+"'1.:r. +'.�', Oft-