HomeMy WebLinkAbout20160601 Ver 1_401 Application_20160616� pplD
�■1� Odom
20160601
Engineering 152 East Main Street • Forest City, NC 28043
PLLC Phone (828) 247-4495 • Fax (828) 247-4498
June 14, 2016�/J
Ms. Karen Higgins tJ v O
NC DWR, 401 & Buffer Permitting Branch ��N 1 5 2016
512 North Salisbury Street Inc
Raleigh, NC 27604 MAT ER RESOURCES
Re: Swiftwater Farm project — Culvert replacement - Polk County, North Carolina
401 Water Quality Certification
Dear Ms. Higgins;
Please find enclosed pre construction notification (PCN) and supporting documents for the replacement of an existing
entrance road culvert for Swiftwater Farm in Polk County. The project submittal includes the following information:
• Project narrative and history.
• Site vicinity maps.
• Pre -Construction Notification (PCN) form.
• Engineering construction plans, project details and vicinity map.
• Watercourse impact reduction plan.
o Impact description and locations.
o Watercourse impact reduction plan.
o Turbidity standards.
o Restoration of surfaces and erosion control.
• Photo documentation of the stream impacts before authorization to construct.
• North Carolina Mountain Riparian Seeding mixture.
• Required fee $240.00 via check 5878 from Odom Engineering, PLLC.
I have discussed the proposed impacts with Mr. Andrew Moore, PG (NC DWR) and have been given guidance that
written approval - via 401 certification #3890 is required for this project from your office. The submittal has been sent
directly to Mr. David Brown, USACE for 404 certification via NWP 18. Additionally, Ms. Andrea Leslie, NC Wildlife
Resources Commission will be copied with the submittal package.
Thank you in advance for your consideration and written approval to construct this project.
If you have any questions, please feel free to call our office directly.
Cc:
David Brown,, USACE,
Andrea Leslie, NC Wildlife Resources Commission
Odom
Engineering
PLLC
June 13, 2016
Mr. David Brown
Asheville Regulatory Field Office
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, North Carolina 28801-5006
152 East Main Street • Forest City, NC 28043
Phone (828) 247-4495 • Fax (828) 247-4498
Re: Swiftwater Farm project — Culvert replacement - Polk County, North Carolina
USACE approval via NWP 18.
Dear Mr. Brown;
Please find enclosed pre construction notification (PCN) and supporting documents for the replacement of an existing
entrance road culvert for Swiftwater Farm in Polk County. The project submittal includes the following information:
• Project narrative and history.
• Pre -Construction Notification (PCN) form.
• Engineering construction plans, project details and vicinity map.
• Watercourse impact reduction plan.
o Impact description and locations.
o Watercourse impact reduction plan.
o Turbidity standards.
o Restoration of surfaces and erosion control.
• Photo documentation of the stream impacts before authorization to construct.
• North Carolina Mountain Riparian Seeding mixture.
I have discussed the proposed impacts with Mr. Andrew Moore, PG (NC DWR) and have been given guidance that
written approval for 401 certification will be required for this project. The application for 401 approval via certification #
3890 is being made simultaneously with the Division of Water Resources. Additionally, Ms. Andrea Leslie, NC Wildlife
Resources Commission will be copied with the submittal package.
Thank you in advance for your consideration and authorization to construct this project under NWP 18.
If you have any questions, please feel free to call our office directly.
Sihcer y,
�ayne W ins, CPESC #3389
Odom Engineering PLLC
Project Narrative
Swiftwater Farm, Polk County, North Carolina
Project description:
This project is for the replacement of an existing (48") metal culvert pipe at the entrance of Swiftwater
Farm property off Hwy 9 in Polk County, North Carolina. The existing culvert pipe is in poor operating
condition and is hydraulically undersized. A new concrete box culvert (8' x 8'x 65' length) is proposed to
be constructed beside the existing pipe. The existing pipe will carry the normal stream flow during the
construction process. Following completion of the new culvert and stabilization of the disturbed areas
the old culvert pipe will be removed and the flow diverted into the new box culvert.
1 PROJECT HISTORY
The Owner is currently utilizing an entrance driveway located off Hwy 9 in Polk County, North Carolina.
The entrance driveway crosses a tributary of the Green River that is currently flowing through a
hydraulically undersized (48") metal culvert pipe. The culvert pipe is past the useful service life of the
pipe material and poses a hazard to traffic crossing over the culvert pipe at a depth of 20' below. The
proposed construction will install a new concrete box culvert properly sized to carry the design storm
and provide and ensure safety at the property entrance.
2 OWNERSHIP INFORMATION
The Owner of the property is Green River Acres, LLC. The authorized representative is Mr.David Nelms.
The Owners contact information is:
3 US ARMY CORPS OF ENGINEERS —CORP 404 PERMIT APPROVAL
The US Army Corp of Engineers (USACE) and the NC Division of Water Resources (DWR) coordinate the
regulatory requirements for work in (or affecting) wetlands, streams, riparian buffers, and waters within
North Carolina. The enclosed (PCN) Pre -Construction Notification has been completed to assist with
your review and approval under Nation Wide Permit 18 for the proposed impacts to a tributary of the
Green River, Classification "C", Broad River Basin.
Guidance has been given by (DWR) to apply simultaneously for written 401 certification approval in
keeping with Water Quality Certification No. 3890.
.r
Office Use Only-
Corps
nlyCorps action ID no
DWQ project no
Form Version 1 3 Dec 10 2008
Page 1 of 11
PCN Form — Version 1 3 December 10, 2008 Version
Pre -Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1a
Type(s) of approval sought from the
Corps
®Section 404 Permit El Section 10 Permit
1b.
Specify Nationwide Permit (NWP) number 18 or General Permit (GP) number: n/a
1c
Has the NWP or GP number been verified by the Corps?
® Yes
❑ No
1 d
Type(s) of approval sought from the DWQ (check all that apply)
® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
le
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification.
❑ Yes ® No
For the record only for Corps Permit
❑ Yes ® No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program
❑ Yes
® No
1 g
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below
❑ Yes
® No
1h Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2.
Project Information
2a
Name of project-
Swiftwater Farm culvert replacement
2b
County
Polk
2c
Nearest municipality / town
Mill Spring
2d
Subdivision name:
n/a
2e
NCDOT only, T I P. or state
project no.
3.
Owner Information
3a
Name(s) on Recorded Deed
Green River Acres, LLC - (per Polk Co. GIS)
3b. Deed Book and Page No.
381/1845
3c
Responsible Party (for LLC if
applicable),
3d
Street address*
520 Katydid Lane Mailing 151 Gamer Drive
Lake Lure, North Carolina 28746
3e
City, state, zip
Mill Spring, North Carolina
3f.
Telephone no.:
3g
Fax no :
3h
Email address
Page 1 of 11
PCN Form — Version 1 3 December 10, 2008 Version
4.
Applicant Information (if different from owner)
4a
Applicant is:
Agent ❑ Other, specify:
4b
Name. ' ,
4c
Business name
(if applicable).
4d
Street address*
4e
City, state, zip.
4f.
Telephone no.:
4g
Fax no.
4h
Email address -
5.
Agent/Consultant Information (if applicable)
5a
Name:
David W. Odom, P E.
5b
Business name
(if applicable)-
Odom Engineering,PLLC
5c.
Street address:
152 E. Main Street
5d.
City, state, zip:
Forest City, North Carolina 28043
5e. Telephone no.:
828-247-4495
5f.
Fax no.:
828-247-4498
5g. Email address-
Davidodom@odomengineedng.com
Page 2 of 11
B. Project Information and Prior Project History
1. Property Identification
1a Property identification no. (tax PIN or parcel ID).
P68-60 Id 39408
1 b Site coordinates (in decimal degrees) - if you can't get
Latitude 35 332214 Longitude -82 183844
these, just include a very good vicinity map
1 c Property size
278 Ac
2. Surface Waters
2a Name of nearest body of water (stream, river, etc) to
Tributary to the Green River
proposed project.
2b. Water Quality Classification of nearest receiving water
Class "C"
2c River basin: map is available at
Broad
http //h2o enr state nc us/admin/maps/
3. Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application.
Residential entrance driveway for Swiftwater Farm off Hwy 9 in Polk County, North Carolina.
3b List the total estimated acreage of all existing wetlands on the property -
none
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
Unknown
3d Explain the purpose of the proposed project
Proposed replacement of an existing (48') culvert in poor operating condition with a new (8'x 8') concrete box culvert —
65 lineal feet length
3e Describe the overall project in detail, including the type of equipment to be used
Installation of a new (8'x 8'x 65' length) concrete box culvert with wing walls. Removal of the old (48" CMP) Restoration
and stabilization of the disturbed areas Heavy equipment including but not limited to, track excavators, track dozer,
loaders and trucks, etc
4. Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
El Yes ®No El Unknown
project (including all prior phases) in the pasty
Comments
4b If the Corps made the jurisdictional determination, what type
❑ Preliminary ❑ Final
of determination was made?
4c If yes, who delineated the jurisdictional areas?
Agency/Consultant Company
Name (if known)
Other
4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
Page 3 of 11
PCN Form — Version 1 3 December 10, 2008 Version
S.
Project History
5a
Have permits or certifications been requested or obtained for
this project (including all pnor phases) in the past
❑ Yes No El Unknown
5b
If yes, explain in detail according to "help file' instructions
6.
Future Project Plans
6a
Is this a phased project?
❑ Yes ® No
6b
If yes, explain
Page 4 of 11
C. Proposed Impacts Inventory
1. Impacts Summary
la. Which sections were completed below for your project (check all that apply)-
[:] Wetlands ® Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a
2b
2c
2d
2e.
2f
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404, other)
(acres)
Temporary
W1 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
2h Comments
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted
3a.
3b.
3c.
3d
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)
other)
(feet)
feet)
S1 ®P ❑ T
Culvert
Tnb. To Green
® PER
® Corps
4
65
replacement
River
❑ INT
® DWQ
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
65
31 Comments.
Page 5 of 11
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then indiv ually list all open water impacts below.
4a
4b
4c.
4d
4e.
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
0. Total open water impacts
4g Comments -
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below
5a
5b
5c
5d
5e
Pond ID
Proposed use or purpose
' Wetland Impacts (acres)
Stream Impacts (feet)
Upland
number
of pond
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments.
5h Is a dam high hazard permit required
❑ Yes ❑ No If yes, permit ID no
5i Expected pond surface area (acres)
5) Size of pond watershed (acres)
5k. Method of construction,
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If any impacts require mitigation, then you MUST fill out Section D of this form
6a.
❑ Neuse ❑ Tar -Pamlico ❑ Other
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b
6c
6d
6e ,
6f.
6g
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary
impact
required?
B1 ❑P❑T
El Yes
❑ No
B2 ❑P❑T
El Yes
❑ No
B3 ❑P❑T
El Yes
❑ No
6h. Total buffer impacts
61 Comments.
Page 6 of 11
D. Impact Justification and Mitigation
7. Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
The extent and duration of the impact will be minimized and stabilization will immediately follow
the box culvert installation.
b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
Minimal disturbance working in the dry to the maximum extent practicable and erosion and
sedimentation control with biodegradable coconut matting for bank stabilization.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a Does the project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State?
❑ Yes ® No
2b If yes, mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes, which mitigation option will be used for this
projects
❑ Mitigation bank
El Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b. Credits Purchased (attach receipt and letter)
Type
Quantity
3c Comments.
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c. If using stream mitigation, stream temperature*
❑ warm ❑ cool ❑cold
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested:
acres
4f Non-npanan wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
Page 7 of 11
PCN Form — Version 1 3 December 10, 2008 Version
5. Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? If yes, you will have to fill out this entire form — please
[:1 Yell ❑ No
contact the State for more information
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required
6c.
6d.
6e
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
15
6f. Total buffer mitigation required:
6g If buffer mitigation is required, discuss what type of mitigation is proposed (e.g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)
6h Comments -
Page 8 of 11
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b If yes, then is a diffuse flow plan included? If no, explain why
❑ Yes ❑ No
Comments
2. Stormwater Management Plan
2a What is the overall percent imperviousness of this project?
%
2b Does this project require a Stormwater Management Plan?
❑ Yes ® No
2c If this project DOES NOT require a Stormwater Management Plan, explain why
2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan
❑ Certified Local Government
2e Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a In which local government's jurisdiction is this project?
N/A
❑ Phase II
3b Which of the following locally -implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c. Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4. DWQ Stormwater Program Review
❑ Coastal counties
❑ HQW
4a. Which of the following state -implemented stormwater management programs apply
❑ ORW
(check all that apply)
❑ Session Law 2006-246
❑ Other -
4b Has the approved Stormwater Management Plan with proof of approval been
attached9
❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 1 3 December 10, 2008 Version
F. Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
la
Does the project involve an expenditure of public (federal/state/local) funds or the
El Yes
No
use of public (federal/state) land?
lb
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
❑ Yes
❑ No
Comments.
2.
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b
Is this an after -the -fact permit application?
❑ Yes
® No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)-
3.
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
El Yes
No
additional development, which could impact nearby downstream water quality?
3b
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description
4.
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 10 of 11
PCN Form —Version 1.3 December 10, 2008 Version
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ® No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain?
® Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: Minimal disturbance and immediate re -stabilization of disturbed
areas.
8c. What source(s) did you use to make the floodplain determination? Polk Co. GIS.
Daryl Nelms
/ate
Applicant/Agent's Printed Name
z"
Appli ant/Agent's Signature
(Agent's signature is vali only d an authorization letter from the applicant
isprovided.)
Page 11 of 11
�4�0,r yw 4 {� .
Nat Carallna
s�
#.� 1 3�s
T
Elaine F Marshall D E F'AR� 1VI E1�1?' OF � 1 I E
Annual Report Status:
Current
Citizenship:
Secretary SECRETARY of TATE
Date Formed:
FO 09A 29C42 Rale;jl. NC 1705-%22 019j&)7.2(06 Account
Fiscal Month:
Login
Click Here To:
Register
View Document Filings File an Annual Report Amend a Previous Annual Report
Print a Pre -Populated Annual Report form
Corporate Names
Legal: Green River Acres, LLC
Limited Liability Company Information
Sosld:
1152110
Status:
Current -Active
Annual Report Status:
Current
Citizenship:
Domestic
Date Formed:
6/2/2010
Fiscal Month:
December
State of Incorporation:
NC
Registered Agent:
Feagan, Phillip R
Corporate Addresses
Mailing
151 Gamer Drive
Lake Lure, NC 28746-5512
Principal Office
151 Gamer Drive
Lake Lure, NC 28746-5512
Reg Office
60 Walker St Ste F
Columbus, NC 28722
Reg Mailing
PO Box 309
Columbus, NC 28722-0309
Company Officials
All LLCs are managed by their managers pursuant to N C G S 57D-3-20
Manager: Daryl B Nelms
151 Garner Drive
Lake Lure NC 28746
Odom
Engineerin
PLLC
152 EM Mak Street, Forest City, N.C. 28043
ph: 9211.247.44" fa.: 828.247.44"
NC FIRM# P -OW
SWIFTWATER FARM
SITE
POLK COUNTY
JUNE 2016
SCALE- N.T.S.
-5
NJ
r
r
-- fes•.-�
_� j � �•� , , p . •' r -�
`-�3 ; �"'i '� \�, ',
: _; f -�� �.. .._ t`\
J//(j}{f (/�
_ , ..�
Q
N
>]Wt U
t
r
V%j
tv
if
joe
t
r
%
ills",
=-A
6
-`0 1
75
:
Jill
' ; ; ',
7c
f'��-�! j j �_ r=��"� -tea L �; err"' 4�_�� � --- -�.` =�-:� '
�j n �' - ; ..,
Odom
Engineerin
PLLC
152 EM Mak Street, Forest City, N.C. 28043
ph: 9211.247.44" fa.: 828.247.44"
NC FIRM# P -OW
SWIFTWATER FARM
SITE
POLK COUNTY
JUNE 2016
SCALE- N.T.S.
1 Odom
Eng ineerin
PLLC
152 East Mala Stray Fora[ City, N.C. 28047
ph: 82&247.4495 (os: 82&247.4498
NC F21N,N P-0880
SWIFTWATER FARM
SITE
POLK COUNTY
JUNE 2016
SCALE: N.T.S.
x
N
0
I
OL
m
E
I
m
x
Z
FT
x
(0
N
O
6
5
cfl
Q)
c
F7
/�, r,
�, .. 70
r -A
47.
z
URI
01
L flif
Pig
a 7
poq
.17
DZO
pit'!
A
--N K -S 1.
Wang SWIFTWATER FARM Elm- -I-
-fig" "
- -1 . 1" 05
PLLC — -- 3 1; . M� 4 -11
COVER
f,
I
I
_tea
e�--
'VC Highway At, g
Paved, Publlc _
/O
By oc¢
Odom SWIFTWAT �`°
s F_ngtnccr�n9 ��. ER TMFARM=`s�3211-N• ; Cl
EXISTING CONDITIONS '. •�`` �- f"� o�
t'
N coasnucna+ rcu�s ral gc��4e� acv ocsaawna
\•\
\ ', II 'I \ 1, I 'I rV
\
I I (1
II i
l � I
-
I
I
------------------------
- \ I
\
_
\ \ I
\\ Q \
1
\
\ U
O
I
O
c
1 �
1
I
1
1
'VC Highway At, g
Paved, Publlc _
/O
By oc¢
Odom SWIFTWAT �`°
s F_ngtnccr�n9 ��. ER TMFARM=`s�3211-N• ; Cl
EXISTING CONDITIONS '. •�`` �- f"� o�
t'
N coasnucna+ rcu�s ral gc��4e� acv ocsaawna
I I !! ?;I I
0114A
:- "I'll
1 Jr. ., I 1
H -, � I
111.1 - ,
14 1
Ri
V N
ill
14 1
_79111111111111K
Odom -s-c'. ' -1
Engineering SWIFTWATER FARM
SITE PLAN AND DETAILS
AIC
Ab 9
--- ------
I
J
Watercourse impact reduction plan:
Swiftwater Farm entrance driveway (48") metal culvert replacement project. Proposed
construction of a (8' x 8'x 65') concrete box culvert with winged headwalls. .
Stream Impact #1 description and location:
Tributary of the Green River, Class "C", Broad River Basin. Approximate stream width - 4 If. and
proposed construction length = 65 If.
Located at the entrance driveway to Swiftwater Farm off Hwy 9 in Polk Co.
Latitude 35.332214, Longitude -82.184844
Method of installation and minimization of impact to the watercourse:
Establish a point of control at the upper and lower limit of the stream crossing impact area. It is
recommended to install an environmentally safe coir wattle in the streambed upstream and
downstream of the proposed construction area. The stream is a tributary of Green River,
adjacent to Highway 9 road right-of-way at the Swiftwater Farm driveway entrance.
Install coir wattles,across the stream bed to prevent sediment from migrating downstream of
the project work zone and to prevent the discharge of heavy sediment laden water while the
utility line is being installed. Securely stake the coir wattles in place and maintain the wattles in
clean working condition until the project is complete.
The general practice for the proposed box culvert installation is to establish, to the extent
practicable, a work in the dry environment by maintaining stream flow through the existing
metal culvert while the new concrete box culvert is being constructed.
Additional practices may include: 1) Sand bag and by-pass pumping around of the watercourse
or 2) Sand bag coffer dam with a temporary geo-textile lined channel or corrugated flexible
pipe sized sufficiently to carry the stream flow. Other practices to convey the existing stream
flow must be approved by the Engineer prior to commencement of work.
Any construction activity in an existing watercourses must include. Removal of the existing
stream bed material; rock, cobble and sand materials and set aside for re use when the
construction activity is complete. Backfill the newly constructed facilities with native soil
materials and re -install the stream bed materials to match the line and grade of the existing
stream bed.
Any sediment accumulations discharged into the watercourse from the construction activities
shall be removed by "shovel and bucket method". Remove all sediment to the stream bed level
without removing rock, cobble or gravel streambed materials.
Turbitidv standards:
Water quality standards shall be monitored by obtaining water samples upstream of the work
zone. The water quality discharge from the work zone shall be maintained, as closely as
possible, to the same clarity of the watercourse upstream of the utility line installation area.
Final cleanup and restoration of surfaces:
All disturbed areas involved in the project shall be restored to as good or better condition as
they were prior to commencement of the project.. Following concrete box culvert and winged
headwalls installation the stream bank slopes shall be re-established and the areas shall be
prepared for seeding with the North Carolina Mountains Riparian mix (Ernst Seeds — ERNMX-
34) and covered with Coconut fiber rolled matting materials. Other methods of stream slope re -
vegetation, including seeding specifications prepared for this project, both temporary and
permanent, must be approved by the Engineer prior to use in the stream slope restoration
area.
All areas disturbed by activities of the project construction shall be restored, stabilized and
approved by the Engineer prior to project completion.
Final approval and inspection:
Final inspection and project closeout will,be determined by the Engineer. Inspection by the
USACE representative and NC Division of Water Resources representative will depend on
jurisdiction and permitting.
Culvert replacement project Impact #1— Tributary to Green River, Class "C", Hwy 9 - Polk Co.
View of existing downstream (48") metal pipe outlet with stacked rock headwall.
+!' -::.•
Driveway entrance and view of upstream (48") metal culvert location. Pipe is approximately 20'
below driveway location.
kc
�y' .►„ �. �,+;.,N :i ..� + - ,� •jam
.Yy ♦dx^, •�� • `_� .. SRS .����• •y �` _ -
VA_ r.;�. , r r .+'+•< - �:��,;..:, ,.:sib+"—'' �•'
�? _Mrs••:1l n '
t1 �J�e�.•r}�: '
to
so
flu
wr Y
`'=� 75:x' _ ` � ,�.,•`` �- . i"
`J! _ �1�!^; Y •-�.�Lr`�'�.lYc r yam_ �`S. `lam L R_. ''!T.
Culvert replacement project Impact #1— Tributary to Green River, Class "C, Hwy 9 - Polk Co.
Proposed concrete culvert construction area. Located adjacent to the existing culvert and watercourse -
(located left in this photo).
1. Seed Mix
NC Mountains Riparian Mix
ERNMX # ERNMX-304
Cost Per $21.79
Pound
Seeding Rate 20 Ib per acre
Mix Type Riparian Sites
• 20% River Oats, WV Ecotype (Chasmanthium latifolium (Uniola latifolia) WV
Ecotype)
• 20% Virginia Wildrye, PA Ecotype (Elymus virginicus PA Ecotype)
• 17% Beaked Panicgrass, SC Ecotype (Panicum anceps SC Ecotype)
• 15% Indiangrass, NC Ecotype (Sorghastrum nutans NC Ecotype)
• 15% Redtop Panicgrass, Coastal Plain NC Ecotype (Panicum rigidulum (P
Species List stipitatum), Coastal Plain NC Ecotype)
(click for
details) S% Winter Bentgrass, NC Ecotype (Agrostis hyemalis NC Ecotype)
• 4% Partridge Pea, PA Ecotype (Chamaecrista fasciculata (Cassia f) PA Ecotype)
• 2% Purplehead Sneezeweed, VA Ecotype (Helenium flexuosum VA Ecotype)
• 1% New York Ironweed, 'Suther'-Piedmont NC Ecotype (Vernonia
noveboracensis, 'Suther'-Piedmont NC Ecotype)
• 1% Wild Bergamot, PA Ecotype (Monarda fistulosa PA Ecotype)
Total: 100%
- See more at: http://www.ernstseed.com/seed-mix/?category-id=70#sthash.4pEdMnEh.dpuf
iN
B3
f9
a
��
a
Q.
aIt
6
3
=
a
a3����
F'
E
s
_a
y=
V
a5
.
a
S
aae
Hai
rR�
_E
R
;g
a
"q�'°
p
a
€���•3��
Q.
o
6
y=
V
�
a
3
aae
tl
rR�
_E
R
;g
a
"q�'°
p
a
€���•3��
o
6
�
a
3
aae
tl
8
4
u
a`i1 gyi gig -1 '1--t
a a�fall}�a�#a fil}t��i#F
�g $
Hill d}�� �R 5 s�g "�i 1
7 0
SU sv \baso
y9
iAgg
k F
;� '• €}s
4
�1 - P e PAPP • VN � p�
•i p
wit r:1
ii^ pi �• H�3 i 3 yyy
rt��S tr: i S 3
! CS$ Cars r3��y35 S�
i y
Yi
B R
—666�-----`
-----------------
AY
z
Pill,
;.11
l 8a
9 iaa
Rt��i�
lig
lit,
ts; i60�
0
a�
D
�^
R n t
I
o I
Zoe
# a �
4
�1 - P e PAPP • VN � p�
•i p
wit r:1
ii^ pi �• H�3 i 3 yyy
rt��S tr: i S 3
! CS$ Cars r3��y35 S�
i y
Yi
B R
—666�-----`
-----------------
`d
z
o> I
=
V I
O
N
o
0
T
m
D
�^
I
o I
I — _.� _ — NCHhgwa
—�— YNog
I
r\ ,