HomeMy WebLinkAboutNCS000549_Permit Modification MOD-SW018 Cover Letter_20160620Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
Mr. Brad Loveland
Duke Energy Carolinas, LLC
EHS CCP Environmental Programs
EC13K
P.O. Box 1006
Charlotte, North Carolina 28201-1006
Dear Mr. Loveland:
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
June 20, 2016 TRACY DAVIS
Director
Subject: Minor Modification of NPDES
Stormwater Permit NCS000549
Riverbend Steam Station
Gaston County
The Division of Energy, Mineral, and Land Resources' Stormwater Program received your request to add
stormwater outfall (SW018) into you permit on June 7, 2016. The Division has reviewed and approved
your request. This modification is issued pursuant to the requirements of North Carolina General Statute
143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental
Protection Agency dated October 15, 2007 (or as subsequently amended). Please insert the attached
page 13 of 19 in Part II of your permit and discard or disregard the old page (be sure not to discard the old
page if its reverse side contains another part of the permit).
This modification includes the following changes from your current permit:
• Monitoring requirements for the new stormwater outfall SW018.
• Because it is on the same page, the modified page also reflects the removal/abandonment of
outfalls SW015, SW016, and SWO17 (confirmed in the letter from Duke Energy to DEQ dated
October 29, 2015).
If any parts, measurement frequencies, or sampling requirements contained in this modification are
unacceptable to you, then you have the right to file a petition for a contested case with the Office of
Administrative Hearings within thirty (30) days following receipt of this letter. This petition must
conform to the requirements of Chapter 150B of the North Carolina General Statutes. Petitions must be
timely filed with the Office of Administrative Hearings, Post Office Drawer 11666, Raleigh, North Carolina
27604. If you do not file a petition within the required time, the agency decision shall be final and
binding.
This permit is not transferable except after notice to the Division. Part III, B.2. addresses the
requirements to be followed in case of change in ownership or control of this discharge. This permit
modification does not affect the legal requirements to obtain other permits which may be required by
this Division, or permits required by the Division of Water Resources, Coastal Area Management Act, or
any other federal or local governmental permit that may be required.
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
1612 Mail Service Center 1 512 N. Salisbury St. I Raleigh, NC 27699
919 707 9200 T
If you have any questions or comments concerning this permit modification, contact Bethany Georgoulias
at (919) 807-6372 or at bethany.georgouliasPncdenr.gov.
Sincerely,
Original signed by B. Georgoulias
for Tracy E. Davis, P.E., CPM, Director
Division of Energy, Mineral and Land Resources
cc: Mooresville Regional Office, DEMLR Stormwater Program/ Z. Kahn
Sam Sampath, Ph.D., EPA Region IV, 61 Forsyth Street, Atlanta, GA 30303
Stormwater Permitting Program
DWR Central Files
Attachments
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
1612 Mail Service Center 1 512 N. Salisbury St. I Raleigh, NC 27699
919 707 9200 T