Loading...
HomeMy WebLinkAbout20080329 Ver 1_401 Application_20080208~' Pro ress Ener ~•- 9 9Y FEB 1 4 2008 SERIAL: BSEP 08-0022 Ms. Kimberly Garvey Wilmington Regulatory Field Office U.S. Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 08--0329 ~~~~ D~ F EB 1 9 2008 DENR-WRTORMW ~R~GN ~~p,NDS AND S Subject: Request for Permit to Support Dredging of the Discharge Canal Settling Basin at the Brunswick Steam Electric Plant Dear Ms. Garvey: Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., is planning to conduct maintenance dredging within the settling basin of the discharge canal for the Brunswick Steam Electric Plant, which is located in Southport, North Carolina. Periodic maintenance dredging of the settling basin is needed to ensure adequate flow of water through the discharge canal pumps. Similar maintenance dredging for the discharge canal settling basin has been previously requested and permitted. The maintenance dredging project will remove approximately 60,000 cubic yards of silt material that has accumulated in the settling basin of the discharge. canal pump station. The deposited material will be removed and retained in two spoil. ponds located on high ground adjacent to the discharge canal. Maintenance dredging in this area will restore the settling basin to its original depth. The Pre-Construction Notification Application Form,. two vicinity maps, plan views of the discharge canal and spoil ponds, and across-section diagram of the discharge canal settling basin, are enclosed. The expected date to start the maintenance dredging project is Apri17, 2008. Based on this expected start date, issuance of the permit approvals is requested by March 31, 2008.. Since the maintenance dredging project will not meet any of the thresholds found in the Division of Water Quality's Water Quality Certification #3687 for requiring written approval, no permit approval is being requested by the North Carolina Division of Water Quality. However, a courtesy copy of this letter and the Pre-Construction Notification Application Form are being provided to the North Carolina Division of Water Quality for their records. The maintenance dredging project will comply with all of the conditions of certification found in Water Quality Certification #3687. Progress Energy Carolinas, Inc. Brunswick Nuclear Plant PO Box 10429 Southport, NC 28461 Ms. Kimberly Garvey, U.S. Army Corps of Engineers BSEP 08-0022 /Page 2 If you have any questions or need any further information, please contact Mr. Steve Cahoon of our Environmental Services Section at (919) 546-7457. Sincerely, ~Pw~~ Edward L. Wills, Jr. Plant General Manager Brunswick Steam Electric Plant Enclosures: 1. Pre-Construction Notification Application Form 2. Vicinity Map 3. Plan View of Canal and Spoil Ponds 4. Cross Section of the Discharge Canal Settling Basin cc (with enclosures): Ms. Cyndi Karoly North Carolina Division of Water Quality 401/Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Progress Energy Carolinas, Inc. Brunswick Steam Electric Plant Discharge Canal Settling Basin Dredging Permit Application Enclosure 1 Pre-Construction Notification Application Form Office Use Only: Form Version Mazch OS 08-0328 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) s '~~A I. Processing ~'~~.~~~~ ~ ~ ~;~~ 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ^ Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 3 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ^ 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ II. Applicant Information ~ ~ ~ ~ a V 1. Owner/Applicant Information FEB 1 9 2(?~'? Name: Mr. Edward L. Wills Jr. oENR - wn7ES ~4,- . Mailing Address: Brunswick Nuclear Plant t 8470 River Road SE Southport NC 28461 Telephone Number: (910) 457- 3691 Fax Number: (910) 457-3369 E-mail Address: ed.wills@pgnmail.com 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Steve Cahoon Company Affiliation: Progress Energy Carolinas, Inc. Mailing Address: PO Box 1551 Raleigh NC 27602 *Cahoon is the contact for any questions that may be associated with the permit application* Telephone Number: (919) 546-7457 Fax Number: (919) 546-4409 E-mail Address: steve.cahoon@p~nmail.com Updated 11/1/2005 Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps maybe included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however,., DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the .full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: BNP Discharge Canal Settling Basin Maintenance Dredging 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 208511656144 4. Location County: Brunswick Nearest Town: Southport Subdivision name (include phase/lot number): NA Directions to site. (include road numbers/names, landmarks, etc.): From Wilmington take US 17S toward Myrtle Beach, Exit onto River Road SE (NC 133) towards Southport. Follow NC 133 through Belville, Clarendon Orton continue on NC133 past Sunny Point Military Ocean Terminal until you see Brunswick Nuclear Plant entrance road on left. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 33° 53' S2" °N 78° 03' 18" °W 6. Property size (acres): 1200 acres (entire BNP sitel 7. Name of nearest receiving body of water: Atlantic Ocean 8. River Basin: Cape Fear (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at htth://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Dredging is proposed in the settling basin near the dischar~ structure in the Brunswick plant discharge canal. The basin will be dredged to its on ig nal Updated 11/1/2005 Page 6 of 12 contours, approximately 19 feet below the water line. The canal is used to dischar e once through cooling water from the plant to the Atlantic Ocean Spoil will be placed in an adjacent 6 acre u lp and spoil pond (see attachedZ 10. Describe the overall project in detail, including the type of equipment to be used: ' Maintenance dred ing in the settling basin around the discharge structure of the BNP cooling water discharge canal, it will be dredged to the original contours. Spoil from. the dred e will be placed in the adjacent 6 acre spoil pond. A dredge will be used to complete the work Approximately 60,000 cubic yards of material is estimated to be removed (see attached) 11. Explain the purpose of the proposed work: Remove built-up sediment in the settlin basin around the discharge structure and in the canal. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USAGE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Project was completed in 1993, Corps Action ID 199000481 V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated'work, and provide justification for the exclusion of this work from the current application. Maintenance dred~in~ will need to occur on an infrequent basis• as stated above maintenance dred~in~ was last performed in 1993. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map alI impacts to .wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermitterit and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs maybe included at the applicant's discretion. Ifthis proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. u~t~a iiiii2oos Page 7 of 12 1. Provide a written description of the proposed impacts: No impacts to waters of the state;_maintenance Bredging will remove sediment around the discharge structure of the canal. The dred~ing`project will remove sediment build-un and restore the settling basin to its original contours. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain (yes/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) NA Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: NA 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact ) (acres NA Total Stream Impact (by length and acreage) 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Name of Waterbody Type of Waterbody Area of Site Number (if applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact (indicate on ma) ocean, etc.) (acres) NA BNP Discharge Canal Updated 11/1/2005 Page 8 of 12 Total Open Water Impact (acres) 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): NA Wetland Impact (acres): NA Open Water Impact (acres): NA Total Impact to Waters of the U.S. (acres) NA Total Stream Impact (linear feet): NA 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ®No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note .that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): No pond construction. Proposed use or purpose of pond (e.g., livestock watering, irngation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken. to avoid the proposed impacts. It maybe useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. No impacts to wetlands or waters of the US, the BNP cooling water discharge canal settling basin will be dredged to its original contours (approximately 19 feet) as indicated on the attiached drawings. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Updated 11/1/2005 Page 9 of 12 freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in .order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina (see DWQ website for most current version.). 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. None proposed, project is for maintenance dredging of BNP cooling water discharge canal settling basin. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://www.nceep.net/pages/inlieureplace.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount ofNon-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Updated 11/1/2005 Page 10 of 12 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ^ No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If .you are not sure whether a NEPA/SEPA document is required, call the 'SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No ^ 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility. to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 1 SA NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules .and Water Supply Buffer Requirements), or other (please identify )? Yes ^ No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (s uare feet) Mitigation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an , additiona120 feet from the edge of Zone 1, 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. NA XI. Stormwater (required by DWQ) updated i iiii2oos Page 11 of 12 Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. No impervious surface acreage will be added durin~proiect. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No sewa e disposal associated with the protect. However the dredge spoil form the project will be disposed of in an upland spoil pond maintained by the plant for this purpose. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this an after-the-fact permit application? Yes ^ No XIV. Cumulative Impacts (required by DWQ) Will this project (based. on past and reasonably anticipated future impacts). result in additional development, which could impact nearby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: No anticipated development;~roject is for maintenance to dredging of the settling basin around the BNP discharge structure in the BNP cooling water discharge canal. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). C~~~,~ . ~ . 1 y. 0 8 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from. the applicant is provided.) u~cea unr~oos Page 12 of 12 Progress Energy Carolinas, Inc. Brunswick Steam Electric Plant Discharge Canal Settling Basin Dredging Permit Application Enclosure 2 Vicinity Map Progress Energy Carolinas, Inc. Brunswick Steam Electric Plant Discharge Canal Settling Basin Dredging Permit Application ~.; it,R;.~ ;.~ ~ Vicinity Map 1 ~ F~ 1 9 2008 i)EiVR - WNi Ek CiUAUTY ..,,..., ®.~~~ wn cTnRAAWATEk Bi2ANCH Brunswick NORTH ~ I Walden l CAROLINA Creek Fish return flume Q Plant Site ~~~ Discharge weir~~ ' Dutchman Diversion h structure ~~ Intake (~ Q Visitors Canal Center ~~ Atlantic Ocean Ocean Discharge Area 2 4 r`-~~ Q Kilometers Miles 2 Progress Energy Carolinas, Inc. Brunswick Steam Electric Plant Discharge Canal Settling Basin Dredging Permit Application Vicinity Map 2 ~ r ~, ti Y w i ,ff~~,.__ ~a 1 a~ ~iy~ ~ _ ~ - ¢- ~~ 5} ~~~ ~1 ~ i~ y 4 f~~]~t iwwdl ;, - j __.. _ _ __ . 1~12~9~20C~5 ~~ ~~~-~~; h'r~~.:. ,~7hts Raser~ved Not ForNa~vi~ation -~- w _ _ ~~ - ~-~ D ~ ~. FEB 1 9 2~Dd DENR - WATER QUAi-. 1R'ETLANDS AND STORE` - 1 Progress Energy Carolinas, Inc. Brunswick Steam Electric Plant Discharge Canal Settling Basin Dredging Permit Application Enclosure 3 Plan View of Canal and Spoil ponds ~ ~ ;°o~ 1 N 33°5;% _ '~~ 1~lSCf•~ARGE ' ...--' D~ntiKae~o Cana -°' ~;! / •' ,; ~ l1.~ -' ~..~~ ~jt~: ~ ~1 Z {~ ~~~{ 2e:vca,.o': Frn~i ~ C~` ~~rr ~A ~ V a c ;.,~ ~ ~. ,~ .--~~-- J r ~~~~ ~ ~J' ~~"'gRGa `~`'"'~ ` C F~,~ ~'~~w ~~~ :Xl~ri ~G ~l ~r SPo1L AREAS ~E~E ~ 5Ec1 CSEcT 4 - 4) (' PL,aNj Si?•F r .~ ~~ $=0y ~xIST 7'srosAL FbNO for of 41-0 r~ ~ SEGTIOt~ "4-4.N so ~A~E I~ v,re~°~ G ~, H~+rel tp-~T~. /JO ve¢TI cep r ED 14 10 5 O 20 ~. ~ r'~r~ .... : ~ ba ~~ ~15cHA.~E 3Astr1 .~ `~~. ~~\ J ~ 5 . J \ `` Ford G~~~! ~1 jQ ~ ~i, C,zca~~......... ' ,,... "' Scoff or }'ord5 ~ooo o ~- - .._.... u~oo ~l/ elcyo,•'icrs rc.~~.~ ; v /1tL.1st do.~,.:n sIG~J Yo/ oF' ci~._ ~,~~~ c~ ~`~ G v ' f~,Ay~ GA' ~~' Tracts ~ ~m C.~ Cr. S. Ciro,-,` N°• ., 2G ~~Und!/fOS 4~'C in ~ g~f ~? / G~er ~o rt7ton /o.:v tooter. 1? /SGI~ARG,E C.~N~ G .County ar ~,-ctnsu~.~c~rc, .:Qr-ir Ccro..ra. ;4~;t~ic~1 are fw Com/irra •~cuc.•_ -~' Liuh~ G~m,~Gr;y - . SNEET r, ©F (© ' ~ .raw-. wti ~.:n.:.._._ .~,M..Iw i • r ~ ~_ a`x 1 -` / -w Oa ~+ r~ 2y r Q ~. • ` r w. i ~ I I ~~ _ I 1 i s . _ •-- ~ ' ~ r-_ i r v ~ .. +l ~ f _ ~' // ~ '~ f ~~ __„ ~ ! ~ // g ~, f , I ~, . r ~ .J ,.~ :/ ~ ,~ ~ ., / / /~• ~ ~ ~ % •~. = j~/ ~ r { ~~ Iii/ iz `" ~, i ~ ._l~ r ~~ ~ '' rJ ~. I ~.~.r ...r I ~ ~ ~ ~•( r .. ~ ~ F f E ~. i]c ~x ( j, l / I . ~ ( ~. ~ is •-; _ ~~ . ' ~ • ~~~t ~: I ~~ ~ ''.~ ., t 1. ~" igyn; 'A7 ~ j ~, r ~ r ~ ~ ~~+~~ J ~ E ~ ~ ~ - 1~ !~, / , . ~~ i' ~ 1f I ~• - a j v 1 ~ ~ 3a ~f~ ~Fe:4p j •.a - ~ s*,. ~. ~ :1, f f . :.~R ¢ 1 M R i R:TA FKt! 1 ~ na~k.~.a-. r z~ i °.a ~^ *~_ w ' C., i ~~ '. \ 1~ ~` .s,: •~' ~~ r~,~ y ,: ~ ~~ . s r1 • ~ ~. ~: ~ ~~ r .. -,~. ~r~; '.~ 1 I Progress Energy Carolinas, Inc. Brunswick Steam Electric Plant Discharge Canal Settling Basin Dredging Permit Application Enclosure 4 Cross Section of the Discharge Canal Settling Basin ~~ +7.' ~.. _ S!R'VtcE R~o~c i ~T 3D` I) ~~ S! ~ -aE'~A1 ~ Z i~61 .V i/`~ ' io ~w~D~ ~~" ~~.:' ~~.o~ ~~.~ '"' . . I El~+ 4~0