Loading...
HomeMy WebLinkAboutNCG080023 DMR SW (3)Semiannual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted 12/2/15 CERTIFICATE OF COVERAGE NW*N'C-G0'802'3 FACILITY NAME Winston Salem Transit Authority COUNTY Forsyth PERSON COLLECTING SAMPLES Lynne Hays LABORATORY R & A Lab Cert. # #34 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2015 SAMPLE PERIOD Jan -June x July -Dec or Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA Pt�FEE��® x❑Otheo-flowC [:]watersupply [:ISA DEC 0 7 2015 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 CENTRAL. FILES Did this facility perform Vehicle Maintenance Activities using more than 55 gallonsp'6So'dON1 per month? -xyes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall " Date.- No. Sample�Colleeted, mo/dd/yr 00530- 00400 00556 -` = Total Suspended Solids, mg/L p,H,, Standard units - Non -Polar Oil and Grease/TPH EPA Method 16'64,(SGT-HEM), mg/L New Motor -Oil Usage, Annual average gal/mo Benchmark - 100 see permit: Within 6.0 - 9.0 15 - SDO #1 10/27/15 79.0 8.07 79.0 >55 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall- -.`°' Date No,. Sample Collected, •, mo/dd/yr 005'56 00586;, 00400 Nori-Polar_ Oil and Grease/TPH EPA Method 1664 (SGT -HEM), mg/L- Total Suspended, Solids,- mg/L pH,,, Stan "dard units Permit Lirhit - e 15 50 or 100 see permit -6.0-9'.Q I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 10/27/15 (first event sampled) Total Event Precipitation (inches): .55 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RES • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES NO x IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Lynne Hays for Winston Salem Transit Authority 12/2/15 (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2