Loading...
HomeMy WebLinkAboutNCG080716 DMR SW (3)Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted 03/23/15 CERTIFICATE OF COVERAGE NO. NC -69011-117-B" FACILITY NAME WilcoHess Travel Plaza #205 Candor COUNTY Montgomery PERSON COLLECTING SAMPLES Lynne Hays LABORATORY R&A Lab Cert #34 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR _2014 SAMPLE PERIOD xJan-June July -Dec or Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA []zero -flow ❑Water Supply [:]SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period' {Outfall ` 'Date` Sample Collected; imo/dd/yr -00530° _ 00400 00556 " '00400 _Total;Su'sp6nded'`" Solids;'mg/L�,- � pH','u - `Standard units „_r _ Non-Polar,Oil'and`Grease/TPH EPA Method 1664. (SGT-HEM),-mg/L New Motor- Usage; Annual average gal/mo Benchmark = - 50 or 100'§66 permit, Within 6q.0 - 9.0 6.0 – 9�.0 SDO #1 PQZWO/ <5 34 8.5 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? yes no x (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfall _ - Date Sample Collected; mo/dd/yr.- u - `' �, 00556 00530 " '00400 Non -Polar Oil and Grease/TPH ,EPA Method 1664 (SGT -HEM), fng/L Total Suspended Solids, � � mg/Ln' ' = . pH, g , w . Standard'uriits= Permit Limit° " - - a 15 T ° ° 50 or -100 see permit 6.0 – 9�.0 SDO #1 PQZWO/ <5 34 8.5 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 02/09/15 (first event sampled) Total Event Precipitation (inches): .22 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES INA ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO x IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Lynne Hays For AT Williams Oil Company 03/23/15 (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2