HomeMy WebLinkAboutNCG080148 DMR SW (2)Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG080000
Date submitted 6/30/15
CERTIFICATE OF COVERAGE NO. NC `I 8080 !8'
FACILITY NAME Superior Carriers Wilmington
COUNTY New Hanover
PERSON COLLECTING SAMPLES Jay Baker
LABORATORY EnviroChem Lab Cert. # 94 Comments on sample
collection or analysis:
SAMPLE COLLECTION YEAR
SAMPLE PERIOD x Jan -June July -Dec
or ❑ Monthly' (month)
DISCHARGING TO CLASS ❑ORW ❑HClw ❑Trout ❑PNA
RECEIVE® ❑Zero -flow ❑Water Supply [:]SA
x Other Class SC Sw
JUL 0 6 2015
CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE r
Did this facility perform Vehicle Maintenance Activities using more than 55 gallons �fnew motor 10il per month? x yes no
(if yes, report your analytical results in the table immediately below)
Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable)
❑ No discharge this period'
Outfall Date
No. Sample Collected,
mo/dd/yr .
00530
00400
00556_
00400-
Total Suspended
Solids; mg/L
pH,,
Standard units
Non -Polar Oil and Grease/TPH EPA
Method 1664 (SGT -HEM), mg/L
New Motor Oil Usage,
Annual°average,gal/mo
Benchmark - °
50 or 100 see permit
Within 6.01— 9.0
15
-
Jan -June
No Discharge/Inability To Collect Sample
No Discharge/Inability To Collect
Sample
No Discharge/Inability To
Collect Sample
Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable)
Outfall
No.
Date
Sample Collected,
mo/dd/yr
00556
00530
00400-
Non -Polar Oil and Grease/TPH EPA Method
1664 (SGT -HEM), mg/L
Total Suspended Solids,
mg/L
.pH,
Standard units
Permit Limit
- °
15
100 see permit
6.0 —9.0
SDO #1
Jan -June
No Discharge/Inability To Collect Sample
No Discharge/Inability To Collect
Sample
No Discharge/Inability To
Collect Sample
' For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
SWU-250 last revised April 11, 2013
Page 1 of 2
STORM EVENT CHARACTERISTICS:
Date: January—June 2015 (first event sampled)
Total Event Precipitation (inches): 0
Date (list each additional event sampled this reporting period, and rainfall amount)
Total Event Precipitation (inches):
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES INA ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO x
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in
the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Lynne Hays for Su Cariers 6/30/15
(Signature of Permittee) (Date)
Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4
SWU-250 last revised April 11, 2013
Page 2 of 2