Loading...
HomeMy WebLinkAboutData Gap Wells_HF Lee (Active)_20160418-�t<$ :Vey d' Z 7 T� � N W W N I Z 1= N Elm DRILLER EQUIPMENT LAYDOWN AREA � S I`1 oo \ HEavERonNI CREEK-.. 1 . -'-�1 SETBACK ALONG EACH SIDE OF CREEK ' l00 i 'lIII CSI 1 11=111 -U W SIMPLE CYCLE W COMBUSTION TURBINES fn °mod W LU N IZ 4 11i��r t 1m 410011 f,461* ,p z m v µle ��o oar 00 0 DER � MW-101S .AMW-17S AMW-17BC .. 1 EXISTING DIRT ROAD"" - \DRILLER EQUIPMENT LAYDOWN AREA /USE EXISTING POWER LINE ROW 0000MW-102S JW-124S MW- / MW-122S % • MW 121S ACCESS ROAD 15' WIDE ±58,018 FT' OF IMPACTS MW-120S 000" MW-119S ACTIVE ASH BASIN I�USE EXISTING GRAVEL ROAD MW-118S I A� MW-117S MW-116S 3 C04 j-115S � --- --` 114S 1 •I '�-- - _J _ \\ \. - - 1 FT OF IMPACTS � , _ - �� MW 113S +A69 ACCESS ROAD 15' WIDE _ — MW 200S" MW 201S - "[---_'� �_ /W 112S .n� ■ �_ LAYOFLANE" W-202J ?� vl L-----'o TFALLOG - ---'MW 203SEE - - - \ \\ ♦111S 329, 63 FT�OCCESS AF IMPACITTS MW DE \ `50SETBACK ALONG EACH SIDE OF NEUSE \ RIVER E J \ Y11 , lyi+. IE, I t EMERGENCY ASSEMBLY LOCATION (TRAVEL BUILDING ON THE DEMO SITE) e 90 COMBINED ' CYCLE PLANT ± 5.16 ACRES (ACCESS ROAD IMPACTS) ± 1.95 ACRES (30 - 60-0 WELL AREAS) ± 7.11 ACRES TOTAL LAND DISTURBANCE ay VIM*J. TYP.; MW 105S w� �F� A- MW-106S �4 • t� MW 107S \AMW-18S AMW-18BC I � �/� z MW 108S ' MW-110S A / OUArPTUFALL 001� AMW 109S�� I Y w i Of Z H O J lL Ol z W 0 1--(.7 J W F_ Q rn 0 Z Z W LU X 00 a w 3: x W a w W _ ' 0 W 1— z X z U) 0 LLO c K H O W W W O O w 0 ILL a In DE `1 W O ::)wW U w U } CO Q U F Z O 2Z QED Q 2 Q W z Q wof } Q Q w U) 0 Z 00 2 p Oo 0 W m r Z Wf^ 0 c) ZI U OQ Jz W W V 0 ED 0 0 W +rJ F� W J ' W ED w �� �W QO W J Q 0 J a rn zv �z co 0 l' o RQ Q� 0 to O 0 W X � O co oW WZ g a to ED w X a ow OIY H W W H - Q Z UZ) W � a d +n 20 QU w Z < I 0 r co cn J I CD 0� a� SOURCES: 1. 2012 AERIAL PHOTOGRAPH OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT httpJ/datagateway.nres. usda.gov/ 2. 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014. 3. PARCEL BOUNDARY WAS OBTAINED FROM WAYNE COUNTY GIS DATA AT http://www.waynegov.com/page/214 4. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83). 5. 2ft CONTOUR INTERVALS FROM NCDOT LIDAR DATED 2007 https://connect.ncdot.gov/resources/gis/pages/cont-elev_v2.aspx 6. LAY OF THE LAND AREA (LOLA) WAS BASED ON THE AUGUST 26, 2014 LETTER REPORT -STAGE I WORK BY GEOSYNTEC CONSULTANTS. 7. WETLANDS AND STREAMS WERE DELINEATED BY AMEC FOSTER WHEELER OF CHARLOTTE, N.C. ON JUNE 1, 2014. NOTE: 1. CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN OR CONSTRUCTION PURPOSES. GRAPHIC SCALE 400 0 200 400 800 (IN FEET) ,s 141P synTeri a _ 148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 ' - www.synterracorp.com ' DRAWN BY: N. DAVIS DATE: 2015-11-02 "CHECKED BY: M. HUTCHINSON DATE: 2015-11-02 ' PROJECT MANAGER: J. MAHAN LAYOUT NAME: CO3-ACTIVE ASH BASIN 'DUKE ENERGY PROGRESS t H.F. LEE ENERGY COMPLEX , 1199 BLACK JACK CHURCH ROAD GOLDSBORO, NORTH CAROLINA +v EROSION AND SEDIMENT CONTROL PLAN FOR SUBSURFACE EXPLORATION R" EROSION CONTROL PLAN ACTIVE ASH BASIN AREA 1026.104.30 SHEET REVISION DRAWING r " C-03 3 OF 5 A