HomeMy WebLinkAboutDE CAPE FEAR-FIGURE 11-25_20160418I Cf_CAIr%
CV
LU
0
Q
W
LL
u.1
n
Q
U
L11
r�
aD
ta,0
O
Q
O
Q
U
ri
E
O
Q
0
c�
m
Q
c�
a�
U—
a�
c�
U
(yi
0
/
co
CV
0
v�
O
w
O
>,
�aA
a�
w
a)
0
/
Q
�-i
LO
O
1H
LO
ri
0
CV
r\-I
CV
r-I
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
CAPE FEAR RIVER
CMW-01
CTMW-01
ABMW-03
ABMW-03S
ABMW-03BR
1970 ASH BASIN
I'r_ + 6360
I
J
u
i
0
SECTION A -A' - BORON
FACING NORTHEAST
�7GV 1 IVIV �-� - �VRVIV
FACING NORTHEAST
S
CORINTH ROAD 250
IABMW-01 240
ABMW-01S 230
ABMW-01BRI
220
210
1985 ASH BASIN CMW-05
z im—
W200
zMW-16BR
MW-16S 190
�700180
7
2270
2930
170
160
7010=110- VMS 150
.1
1
1
--110
11
•1
:1
1
•1
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
COAL ASH
MIX OF COAL ASH AND SOIL
—
FILL MATERIAL
CLAY WITH SILT AND FINE SAND
SAND WITH FINES
COARSE SAND WITH GRAVEL
SAPROLITE
WEATHERED ROCK
C --
c i
MUDSTONE BEDROCK
SANDSTONE BEDROCK
w �-
WATER LEVEL (JUNE 2015)
HASH MARKS POINT TO
DECREASING CONCENTRATIONS
GRAPHIC SCALE
300 0 300 600
IN FEET
HORIZONTAL: 1"=300'
30 0 30 60
IN FEET
VERTICAL: 1"=30'
CONCENTRATION CONTOUR
DASHED WHERE INFERRED
250 CONCENTRATION
NA NOT ANALYZED
NS NOT SAMPLED
ABMW-03BR: WATER ANALYTICAL RESULTS
IN MICROGRAMS PER LITER
0-2': SOIL TOTAL ANALYTICAL RESULTS IN mg/kg
BORING SYMBOLS
SOIL
SAMPLE
WELL SCREEN WITH
CONCENTRATION OF COI
(micrograms per liter)
SOURCES:
1. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD 83).
2. SELECT TOPOGRAPHIC ADJUSTMENTS BASED ON SITE
SURVEY AND COMPARISON TO AERIAL PHOTOGRAPH.
NOTE:
1. CONTOUR LINES ARE USED FOR REPRESENTATIVE
PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN
OR CONSTRUCTION PURPOSES.
2. CROSS SECTION LOCATIONS ARE SHOWN ON FIGURE 2-1.
3. 2L / IMAC VALUES EQUALS:
700 micrograms per liter FOR BORON
1 micrograms per liter FOR COBALT
erra
148 River Street, Suite 220
Greenville, South Carolina 29601
864-421-9999
www.synterracorp.com
DRAWN BY: K. ST.CYR I DATE: 8/25/2015
CHECKED BY: C. SUTTELL DATE: 8/25/2015
PROJECT MANAGER: KATHY WEBB
LAYOUT NAME: FIGURE 11-25
DUKE
ENERGY
PROGRESS
CAPE FEAR STEAM ELECTRIC PLANT
500 CP & L ROAD
MONCURE, NORTH CAROLINA
FIGURE 11-25
GEOLOGIC CROSS SECTION
A -A' AND B-B'
WITH BORON