Loading...
HomeMy WebLinkAbout20071467 Ver 1_Approval Letter_20080220Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality February 20, 2008 North Carolina Department of Correction Mr. G.J. Freeman 4216 Mail Service Center Raleigh, NC 27699-4216 DWQ Project # 2007-1467 County: Wake Subject Property: Central Prison Regional Medical & Mental Health Center, Raleigh, NC Rocky Branch [030402, 27-34-6, C, NSW) AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B .0233) Authorization Certificate Dear Mr. Freeman: You have our authorization, in accordance with 15A NCAC 02B .0233 and any conditions listed below, to impact approximately 3,970 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the proposed parking area at the subject property as described within your application dated August 29, 2007, received by the Division of Water Quality (DWQ) on August 29, 2007, with additional information received by DWQ on September 26, 2007. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge regulations. This authorization is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount A roved Units Plan Location or Reference Zone 2 Buffers 3,970 (square ft.) Additional variance info dated Au st 28, 2007 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604. Phone: 919-733-1786 /FAX 919-733-6893 /Internet: h~://h2o.enr.state.nc.us/ncwetlands No e hCarolina ~aturally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper NC Dept of Correction Page 2 of 2 February 20, 2008 a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 2B .0233(5). 6. Buffer Mitigation Plan You are required to mitigate for impacts to the protected riparian buffers. The required area of mitigation to compensate for impacts to the protected riparian buffers must be calculated and this square footage will determine what your required buffer mitigation in square feet as required under this Authorization 15A NCAC 2B .0233(9). You shall submit a mitigation plan as required under 15A NCAC 02B .0233 and 0.242 to this office for approval. Be sure to include the proper mitigation ratios of 1.5:1 for Zone 2 impacts. The mitigation plan shall be approved by the DWQ before any of the impacts approved under this Authorization can occur. 7. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the NC Dept of Correction Page 2 of 2 February 20, 2008 buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B .0233. 8. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 9. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at: http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0233. If you have any questions or would like a copy of the buffer rules, please call Amy Chapman at: (919) 733-1786. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USAGE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. incerely,~~ C een H. Sullins CHS/asc Enclosures: Certificate of Completion cc: Lauren Witherspoon, DWQ Raleigh Regional Office Pease Architects-Engineers, Attn: Heather A. Crockford,.PO Box 18725, Charlotte, NC 28218 File Copy Central Files Filename: 071467CentralPrisonRegionalMedicalandMentalHealthCenter(Wake)Min Var ~~ ~~ Certification of Completion DWQ Project No.: County: Applicant: Project Name: Date of Issuance of Certification or Authorization: Certificate of Comt~letion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Uriit, North Carolina Division of Water Quality, 1650 Mail Service Center, lZa.leigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer.. It is not necessary to send certificates from all of these. Applicant's Certification I, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Agent's Certification Date: I, ,hereby state that, to the best of my abilities, due care and diligence was • used in the observation of the construction such that the construction was observed to be built within .substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and spec cations; and other supporting materials. Signature: Date: . If this project was designed by a Certified Professional I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized. to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my. abilities, .due care. and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. . hereby state- that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Suffer Rules, the approved plans and specifications, Signature: Registration No. Date