Loading...
HomeMy WebLinkAbout20080322 Ver 1_Acceptance Letter_20080220O~O~ W A ~~~QG ~ ~_~~-i Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality February 20, 2008 EXPRESS REVIEW ACCEPTANCE LETTER Drayton Reserve Subdivision Attn: Mr. Jeffrey L. Ward 818 South White Street Wake Forest, NC 27587 Project Name: Drayton Reserve Subdivision Wake County On February 19, 2008, the 401 Oversight/Express Permitting Unit of the Division of Water Quality received a request from Mrs. Jennifer Burdette of Burdette Land Consulting, Inc., regarding a project known as "Drayton Reserve Subdivision" for acceptance into the Express Review Program. This letter advises you that your project will be accepted into the Express Review Program once the following items are received: 1) The application fee of $3,000,00 [for 401 Water Quality Certification with minor impacts ($1,000) + Riparian Buffer Authorization ($2,000)], made payable to the North Carolina Division of Water Quality]; 2) One (1) copy of the completed PCN Addendum (http://h2o.enr.state.nc.us/ncwetlands/documents/MicrosoftWord- PCN Addendum 10 O1 06 OOO.pdf); and 3) Five (5) complete and collated copies of the PCN Application and supporting documentation -see PCN Addendum (instead of providing 5 copies of the full size plans you may provide two copies of the full size plans along with three copies of the 11 X 17); 4) Three (3) copies of all supporting stormwater information pertaining to this project including a. Entire site development layout plans delineating all drainage areas (drainage areas with greater than 24% impervious surface will need the following documentation: i. Design calculation sheets for all proposed BMP(s) sized for both on-site and off-site drainage; ii. BMP supplements for each proposed BMP and Required Items Check List (available at http://h2o.enr.state.nc.us/su/bmp forms.htm) along with all required items (this includes one (1) original and two (2) copies of notarized Inspection & Maintenance Agreement for the stormwater management facilities.); and iii. Detailed construction drawing sheets shall include Erosion and sediment control plans (to be approved by the Division of Land Resources) and Installation and Planting schedules for the proposed BMPs. 5) One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale or color). If the plans are too large to store in TIFF format, they can be stored in PDF. Additionally, apre-application meeting (to include the property owner) is required prior to the submittal of your completed application package. Your pre-application meeting has been scheduled for February 22, 2008 at 9:OOam. Due to lack of staff availability, your project cannot be accepted until February 27, 2008. The clock for this project will not start until receipt of the completed application package and required fee are received. If the impacts are greater than indicated on the Initial Interest Form and/or the services are different, you may be required to remit an additional fee. If you have any questions or wish to discuss these matters further please do not hesitate to call Lia Myott at 919-733-9502. 401 Oversight I Express Review Permitting Unit 1650 Mail Service Center, Ralegh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-6893 (Internet: http:l/h2o.enr.state.nc.us/ncwetlands An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper NorthCarolina ,Naturally Sincerely, (+ Cyndi Karoly, Su rvisor 401/Express Review Oversite Unit CBK/lem cc: File copy Jennifer Burdette, Burdette Land Consulting, Inc., 10212 Creedmoor Rd., Raleigh, NC 27615