Loading...
HomeMy WebLinkAbout20160501 Ver 1_Bridge 207 SR 1522 Alamance Co - NWP 14 - SAW-2016-01091_20160615 (2)Carpenter,Kristi From: Sent: To: Cc: Subject: Attachments: Harmon, Beth Wednesday, June 15, 2016 2:38 PM Bailey, David E SAW; Parker, Jerry A; Thomson, Nicole J Wrenn, Brian L; Tugwell, Todd SAW; Mills, James M; Corbett, Cindy M SAW; Carpenter,Kristi; Fitzpatrick, Linda F RE: Bridge 207 SR 1522 Alamance Co - NWP 14 - SAW-2016-01091 SR 1522 - Bridge 207 - Division 7- STR - CF 02 - Alamance.pdf Dave -- Please see attached the signed mitigation responsibility transfer form for the bridge replacement project on SR 1522 in Alamance County (USACE Action ID 2016-01091). Please let me know if you need anything else for this project. Beth Beth Harmon NCDOT Coordinator Division of Mitigation Services Department of Environmental Quality 919-707-8420 office beth.harmon@ncdenr.gov 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Bailey, David E SAW [mailto:David.E.Bailey2@usace.army.mil] Sent: Wednesday, June 15, 2016 12:21 PM To: Parker, Jerry A<jparker@ncdot.gov>; Thomson, Nicole J<njthomson2@ncdot.gov> Cc: Wrenn, Brian L<brian.wrenn@ncdenr.gov>; Tugwell, Todd SAW <Todd.Tugwell@usace.army.mil>; Harmon, Beth <beth.harmon@ncdenr.gov>; Mills, James M<mmills@ncdot.gov>; Corbett, Cindy M SAW <Cindy.M.Corbett@usace.army.mil>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Subject: Bridge 207 SR 1522 Alamance Co - NWP 14 - SAW-2016-01091 Nikki and Jerry, I have attached the Nationwide Permit 14 verification including Special Conditions and terms and conditions for the above referenced project to this email. Please note the Compensatory Mitigation requirement. Please let me know if you have any questions. Sincerely, -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax:(919)562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatorv Miti�ation Responsibilitv Transfer Form Permittee: North Carolina Department of Transportation Action ID: SAW-2016-01091 Project Name: NCDOT / 5R 1522 / Bridge 207 / Division 7/ Alamance County County: Alamance Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the 5ponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The 5ponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the 5ponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office {see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03030002, Cape Fear River Basin Stream Impacts (linear Warm � Cool � Cold 77 � Wetland Impacts (acres) Riverine Riparian Non-Riverine Non-Riparian Coastal *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. �pensatory M Stream I Warm 154 uirements: 8-digit HUC and Basin: 03030002, Cape Fear River Basin �tion (credits) Wetland Mitigation (credits) Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal Mitigation Site Debited: NCDMS {List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the 5ponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the 5ponsor to ensure compliance associated with the mitigation requirements. Page 1 of 2 F�rm Updated 23 November, 2015 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. � Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. . If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: This form is not valid unless signed below by the USACE Project Manager and by the Mitigation 5ponsor on Page 1. Once signed, the Sponsorshould provide copies of this form along with an updated bank ledger to: IJ the Permittee, Z) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigotion O�ce, Attn: Todd Tugwe11,11405 Fal/s of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army.mi/J. Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: David Bailey USACE Field Office: Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: David.E.Baile�2[n[�usace.armv.mil � Digitallysigned by BAILEY.DAVID.E.1 3 79283 73 6 DN: c=US, o=U.S. Government, ou=DoD, ou=PKl, ou=USA, cn=BAILEY.DAVID.E.137928373fi Date: 201 b.06.15 12:17:45 -04'00' USACE Project Manager Signature June 15. 2016 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.armv.mil. Page 2 of 2 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://reeulatorv.usacesurvev.com/ to complete the survey online.