HomeMy WebLinkAboutHDR - CAP Part 1 TOCCorrective Action Plan Part 1 01
Allen Steam Station Ash Basin
Contents
ExecutiveSummary...................................................................................................................................... 1
ES -1 Introduction..........................................................................................................................................
1
ES -1.1 Regulatory Background...................................................................................................... 1
ES -1.2 Summary of CSA................................................................................................................
2
ES -2 Background Concentrations and COI Screening Level Summary ......................................................
2
ES -2.1 Proposed Provisional Background Concentrations............................................................
3
ES -2.2 Updated COI Screening Evaluation Summary...................................................................
4
ES -3 Site Conceptual Model........................................................................................................................ 5
ES -3.1 Geological/Hydrogeological Properties...............................................................................5
ES -3.2 Site Geochemical Conditions..............................................................................................5
ES -3.3 Correlation of Hydrogeologic and Geochemical Conditions of COI Distribution ................
6
ES -4 Modeling.............................................................................................................................................. 7
ES -4.1 Model Scenarios.................................................................................................................
7
ES -4.2 Groundwater Modeling Conclusions...................................................................................
7
ES -4.2.1 Flow Model..............................................................................................................
7
ES -4.2.2 Fate and Transport Model.......................................................................................
8
ES -4.3 Groundwater -Surface Water Interaction Modeling.......................................................9
ES -5 Recommendations.............................................................................................................................. 9
1 Introduction........................................................................................................................................
11
1.1 Site History and Overview.......................................................................................................12
1.1.1 Site Location, Acreage, and Ownership.....................................................................
12
1.1.2 Site Description..........................................................................................................
12
1.2 Permitted Activities and Permitted Waste............................................................................... 14
1.3 History of Site Groundwater Monitoring..................................................................................
14
1.4 Summary of Comprehensive Site Assessment.......................................................................
15
1.5 Receptor Survey...................................................................................................................... 15
1.5.1 Surrounding Land Use............................................................................................... 16
1.5.2 Findings of Drinking Water Supply Well Survey Conducted per the Coal Ash
Management Act of 2014, N.C. Gen. Stat. SS 1 30A-309-200 et seq......................... 16
1.6 Summary of the Screening Level Risk Assessment...............................................................
16
1.7 Geological/Hydrogeological Conditions.................................................................................. 17
1.8 Results of the CSA Investigations........................................................................................... 17
1.9 Regulatory Requirements........................................................................................................ 18
1.9.1 CAMA Requirements..................................................................................................
18
1.9.2 Standards for Site Media............................................................................................19
2 Background Concentrations and Regulatory Exceedances..............................................................
21
2.1 Introduction.............................................................................................................................. 21
2.2 Groundwater............................................................................................................................23
2.2.1 Background Wells and Concentrations......................................................................23
2.2.2 Groundwater Exceedances of 2L Standards or IMACs............................................. 26
2.2.3 Radionuclides in Groundwater...................................................................................29
Corrective Action Plan Part 1 ��
Allen Steam Station Ash Basin
2.3
Seeps...................................................................................................................................... 30
2.4
Surface Water.........................................................................................................................
33
2.5
Sediments...............................................................................................................................
35
2.6
Soils.........................................................................................................................................36
2.6.1 Background Soil and Concentrations.........................................................................
36
2.6.2 Soil Exceedances of NC PSRGs for POGs...............................................................
38
2.7
Ash..........................................................................................................................................
40
2.8
Porewater................................................................................................................................
41
2.9
PWR and Bedrock...................................................................................................................43
2.10
COI Screening Evaluation Summary......................................................................................
44
2.11
Interim Response Actions.......................................................................................................
45
2.11.1 Source Control...........................................................................................................45
3 Site Conceptual Model......................................................................................................................46
3.1
Site Hydrogeologic Conditions................................................................................................
46
3.1.1 Hydrostratigraphic Units.............................................................................................46
3.1.2 Hydrostratigraphic Unit Properties.............................................................................
47
3.1.3 Potentiometric Surface — Shallow Flow Layers..........................................................
47
3.1.4 Potentiometric Surface — Deep Flow Layer...............................................................
48
3.1.5 Potentiometric Surface — Bedrock Flow Layer...........................................................48
3.1.6 Horizontal and Vertical Hydraulic Gradients..............................................................48
3.2
Site Geochemical Conditions..................................................................................................
51
3.2.1 COI Sources and Mobility in Groundwater.................................................................
51
3.2.2 Geochemical Characteristics.....................................................................................
58
3.2.3 Source Area Geochemical Conditions.......................................................................
64
3.2.4 Mineralogical Characteristics.....................................................................................
65
3.3
Correlation of Hydrogeologic and Geochemical Conditions to COI Distribution .....................65
4 Modeling............................................................................................................................................
68
4.1
Groundwater Modeling............................................................................................................
68
4.1.1 Model Scenarios.........................................................................................................68
4.1.2 Calibration of Models..................................................................................................
69
4.1.3 Kd Terms.....................................................................................................................
70
4.1.4 Flow Model.................................................................................................................
70
4.1.5 Fate and Transport Model..........................................................................................
71
4.2
Groundwater - Surface Water Interaction Modeling................................................................
80
4.2.1 Mixing Model Approach..............................................................................................80
4.2.2 Surface Water Model Results....................................................................................
81
4.3
Refinement of SCM.................................................................................................................
82
5 Summary and Recommendations.....................................................................................................
83
6 References........................................................................................................................................
87
Corrective Action Plan Par''
��
Allen Steam Station Ash Basin
Tables
2-1 Initial COI Screening Evaluation
2-2 Background Groundwater Concentrations for the Allen Site: Ranges of Analytical
Results with Sample Turbidity <10 NTU
2-3 Groundwater Exceedance Results for COls Compared to PPBCs, 2L Standards, IMACs,
or DHHS HSLs, and Frequency of Exceedances
2-4 Radionuclide Concentrations
2-5.1 Seep Exceedance Results for COls Compared to 2L Standards, IMACs or DHHS HSLs
and Frequency of Exceedances
2-5.2 Seep Exceedance Results for COls Compared to 2B Standards or USEPA Criteria and
Frequency of Exceedances
2-6.1 Surface Water Exceedance Results for COls Compared 2B or USEPA Standards, and
Frequency of Exceedances
2-6.2 Surface Water Exceedance Results for Cols Compared 2L or IMAC, and Frequency of
Exceedances
2-7 Sediment COls Exceedances Compared to Upstream Sediment Concentrations, NC
PSRGs for POG and Frequency of Exceedances
2-8 Proposed Provisional Background Soil Concentrations
2-9 Soil Exceedance Results for COls Compared to NC PSRGs for POG, PPBCs, and
Frequency of Exceedances
2-10 Ash Exceedance Results for COls Compared to NC PSRGs for POG, PPBCs, and
Frequency of Exceedances
2-11 Porewater Exceedance Results for COls Compared to 2L Standards, IMACs, or DHHS
HSLs, and Frequency of Exceedances
2-12 Updated COI Screening Evaluation Summary
3-1 Vertical Gradient Calculations for Shallow/Deep Well Pairs
3-2 Vertical Gradient Calculations for Deep/Bedrock Well Pairs
3-3 Categories and Threshold Concentrations to Identify Redox Processes in Groundwater
3-4 Field Parameters from CSA
4-1 Mixing Zone Sizes and Percentages of Upstream River Flows
4-2 Catawba River (Lake Wylie) Calculated Surface Water Concentrations
Corrective Action Plan Part 1 ��
Allen Steam Station Ash Basin
Figures
1-1 Site Location Map
1-2 Site Layout Map
1-3 Compliance and Voluntary Monitoring Wells
1-4 Monitoring Well and Sample Locations
1-5 Seep and Surface Water Sample Locations
1-6 Receptor Map
1-7 Site Vicinity Map
2-1 Groundwater Analytical Results Map
2-2 Surface Water and Seep Analytical Results
2-3 Soil Analytical Results
3-1 Site Conceptual Model — 3-D View
3-2.1 Site Conceptual Model — Cross Sectional
3-2.2 Site Conceptual Model — Cross Sectional
3-3 Water Table Surface Map — Shallow Wells
3-4 Potentiometric Surface Map — Deep Wells
3-5 Potentiometric Surface Map — Bedrock Wells
3-6 Vertical Gradient — Shallow to Deep Wells
3-7 Vertical Gradient — Deep to Bedrock
Appendices
A Regulatory Correspondence
B Background Well Analysis
C UNCC Groundwater Flow and Transport Model
D UNCC Soil Sorption Evaluation
E Surface Water Modeling Methods
iv