Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DE ROXBORO-FIGURE 11-25
Ln N rl w O O B: O M X O ry w 0 Ln b�0 IL ta,0 C 1` 0 0- D: Q U) 0 c� a. a� a� Q 0 c� m a 0 0 x 0 ti O / co (14 O v� 0 0 o_ w Q) 0 / 7 N LO O N 0 N NORTH 550 540 530 520 510 500 490 480 470 460 450 En 440 W 430 W= 420 410 - 400 390 380 370 360 350 340 330 320 SOUTH 560 550 540 530 520 510 500 490 480 470 460 450 440 430 420 410 400 390 380 370 360 350 SCHOOL BG -01: BG -01 BR: I NPDES DISCHARGE CANAL I MW-02BR: NORTH SECTION A -A' - BORON FACING NORTHWEST REGOLITH 1 Cr_`CAII7% REGOLITH ■ TRANSITION ZONE - - - - BEDROCK FILL MATERIAL WATER LEVEL DUNNAWAY ROAD FILL MATERIAL - ASH — ASH PORE WATER LEVEL ASH BASIN WATER LEVEL BEDROCK WATER LEVEL TRANSITION ZONE WATER LEVEL ^/ FRACTURED/OXIDIZED ZONE OBSERVED IN ROCK CORE CONCENTRATION CONTOUR HASH MARKS POINT TO DECREASING CONCENTRATIONS CONCENTRATION CONTOUR DASHED WHERE INFERRED 5.08 CONCENTRATION ABMW-2: NA NOT ANALYZED ND NO DATA GRAPHIC SCALE NS NOT SAMPLED ABMW-2BR: IN FEET BORING SYMBOLS HORIZONTAL: 1"=300' REGOLITH SOIL SAMPLE IN FEET WELL SCREEN WITH VERTICAL: 1"=30' —®700�1111111�w �il6=w- (micrograms per liter) (standard units for pH) -_-_________________ 1973 ACTIVE ___- -- ----------------------- — ASH BASIN _--- <5a =___________________ . _--_--_-_-__--_ - - - - - - - - - - - - - - - - --------------------------- -_-__________--- -_-_-_______- BEDROCK- - - - - -- - - - _ _ -- - -- ---- .,.OFp�fijq REGOLITH ------------ ------------ --_-_-_-_-_-_ --__-_-_ —_-_-_ ---------------- ., 7720 _-_-_-__--=-=_BEDROCK_ -_-_-_-_-_-_- --_-_-_-_- --_-_-_-_- - - -- _ - _ - _ -___- __- � -____ - ____- - '. roc 'C ------------------------ _ __- -_� ____- _ _ - - � - _______ ___ ��� -------------------------------------------------------------------------- ---------------- ----------------------------------------------------- - — — TRANSITION ONE -------------------- — — — — — — — — — — — — — — — — — — — — — — ---------------------- — — — — — — — — — — — — — — — — — — — — — — SECTION A -A' - BORON FACING NORTHWEST REGOLITH 1 Cr_`CAII7% REGOLITH ■ TRANSITION ZONE - - - - BEDROCK FILL MATERIAL WATER LEVEL DUNNAWAY ROAD FILL MATERIAL - ASH — ASH PORE WATER LEVEL ASH BASIN WATER LEVEL BEDROCK WATER LEVEL TRANSITION ZONE WATER LEVEL ^/ FRACTURED/OXIDIZED ZONE OBSERVED IN ROCK CORE CONCENTRATION CONTOUR HASH MARKS POINT TO DECREASING CONCENTRATIONS CONCENTRATION CONTOUR DASHED WHERE INFERRED MW -15D: MW-115BR: CW -04: MW-04BR: REGOLITH 0 EMU= MW -06D: —SAVO 700 4L -- ---- — ----- ------ ---- WASTEWATER / __---_--- — —————— — — — — -- <50-- _-------- ---5---- ------------- -___- 1973 ACTIVE __- -- ASH BASIN CR 10------------- _--____________--___- -__- _—__---_-_-50 ---- _________ __-__-=____----___ _ _ _ _-__----- BEDROCK==__ __ REGOLI -4060 _ _ 111111111111111111111 k1law <______ OMMEM 40_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __- - _ _ _ _ _ ___ ___ _ - - - - - - _ _ _ _ _ _ - ----___- — �� ----------- ------ ------ ____— ___—--- - - - - -_ —____ 7-5 TRANSITION -______--_--_--_---_ --_Z-O-N_E _ -__-_---------_-_-_-=-=--_B-ED-R-O_C-K--_-_--_-_-=-_-_-_-_-_--_-_--_--_-_-_-_-_-_-_-_-_-_-_--_-_-_-_-_--_-_-_- =----�---- �L �' -----------_-------------------- _____-_ _-____-_�___-�—_�-__-��— �__�_—_�_________________- ______________________________________________________________-_____ __-------- -- -- -- --- -- ----- ---- --- --- - --- TRANSITIONZONE--__--_-_---__--_-_-_-_-_---__--_-_-_-__----__--_-_-_-_-_---_ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - ------------------ --- - -- ------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- -------------------------------------------- ------------------------------------------------------------------ ___________________________________________= 176 —_____-- ------_-- ___________________________--_______ ---- ------------------------------------------------------BEDROCK= -------------------------------- ---<50------------------------------------------------------------------------------- ----- Station (feet) SECTION B -B' - BORON FACING EAST AW -01 B: WATER ANALYTICAL RESULTS IN MICROGRAMS PER LITER 0-2': SOIL TOTAL ANALYTICAL RESULTS IN mg/kg NOTES: SOUTH 1. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 550 (NAD 83). 540 2. SELECT TOPOGRAPHIC ADJUSTMENTS BASED ON SITE SURVEY AND COMPARISON TO AERIAL PHOTOGRAPH. 530 3. CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN 520 OR CONSTRUCTION PURPOSES. 510 4. 24 HOUR WATER LEVEL COLLECTED ON JUNE 15, 2015. 500 5. CROSS SECTION LOCATIONS ARE SHOWN ON FIGURE 2-1. 6. 2L / IMAC VALUE FOR BORON EQUALS 700 pg / I. 490 480 470 460 450 440 430 2 a rra 420 LU S synT(e 148 River Street, Suite 220 410 Greenville, South Carolina 29601 864-421-9999 400 www.synterracorp.com 390 DRAWN BY: J. COLEMAN DATE: 6/15/2015 CHECKED BY: P. WALDREP DATE: 6/15/2015 380 PROJECT MANAGER: KATHY WEBB 370 LAYOUT NAME: FIGURE 11 -25 -BORON 360 DUKE 350 340 ENERGY 330 PROGRESS 320 ROXBORO STEAM ELECTRIC PLANT 1700 DUNNAWAY RD SEMORA, NORTH CAROLINA FIGURE 11-25 GEOLOGIC CROSS SECTION A -A' AND B -B' WITH BORON 5.08 CONCENTRATION NA NOT ANALYZED ND NO DATA GRAPHIC SCALE NS NOT SAMPLED 300 0 300 600 IN FEET BORING SYMBOLS HORIZONTAL: 1"=300' 30 0 30 60 SOIL SAMPLE IN FEET WELL SCREEN WITH VERTICAL: 1"=30' CONCENTRATION (micrograms per liter) (standard units for pH) MW -15D: MW-115BR: CW -04: MW-04BR: REGOLITH 0 EMU= MW -06D: —SAVO 700 4L -- ---- — ----- ------ ---- WASTEWATER / __---_--- — —————— — — — — -- <50-- _-------- ---5---- ------------- -___- 1973 ACTIVE __- -- ASH BASIN CR 10------------- _--____________--___- -__- _—__---_-_-50 ---- _________ __-__-=____----___ _ _ _ _-__----- BEDROCK==__ __ REGOLI -4060 _ _ 111111111111111111111 k1law <______ OMMEM 40_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __- - _ _ _ _ _ ___ ___ _ - - - - - - _ _ _ _ _ _ - ----___- — �� ----------- ------ ------ ____— ___—--- - - - - -_ —____ 7-5 TRANSITION -______--_--_--_---_ --_Z-O-N_E _ -__-_---------_-_-_-=-=--_B-ED-R-O_C-K--_-_--_-_-=-_-_-_-_-_--_-_--_--_-_-_-_-_-_-_-_-_-_-_--_-_-_-_-_--_-_-_- =----�---- �L �' -----------_-------------------- _____-_ _-____-_�___-�—_�-__-��— �__�_—_�_________________- ______________________________________________________________-_____ __-------- -- -- -- --- -- ----- ---- --- --- - --- TRANSITIONZONE--__--_-_---__--_-_-_-_-_---__--_-_-_-__----__--_-_-_-_-_---_ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - ------------------ --- - -- ------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- -------------------------------------------- ------------------------------------------------------------------ ___________________________________________= 176 —_____-- ------_-- ___________________________--_______ ---- ------------------------------------------------------BEDROCK= -------------------------------- ---<50------------------------------------------------------------------------------- ----- Station (feet) SECTION B -B' - BORON FACING EAST AW -01 B: WATER ANALYTICAL RESULTS IN MICROGRAMS PER LITER 0-2': SOIL TOTAL ANALYTICAL RESULTS IN mg/kg NOTES: SOUTH 1. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 550 (NAD 83). 540 2. SELECT TOPOGRAPHIC ADJUSTMENTS BASED ON SITE SURVEY AND COMPARISON TO AERIAL PHOTOGRAPH. 530 3. CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN 520 OR CONSTRUCTION PURPOSES. 510 4. 24 HOUR WATER LEVEL COLLECTED ON JUNE 15, 2015. 500 5. CROSS SECTION LOCATIONS ARE SHOWN ON FIGURE 2-1. 6. 2L / IMAC VALUE FOR BORON EQUALS 700 pg / I. 490 480 470 460 450 440 430 2 a rra 420 LU S synT(e 148 River Street, Suite 220 410 Greenville, South Carolina 29601 864-421-9999 400 www.synterracorp.com 390 DRAWN BY: J. COLEMAN DATE: 6/15/2015 CHECKED BY: P. WALDREP DATE: 6/15/2015 380 PROJECT MANAGER: KATHY WEBB 370 LAYOUT NAME: FIGURE 11 -25 -BORON 360 DUKE 350 340 ENERGY 330 PROGRESS 320 ROXBORO STEAM ELECTRIC PLANT 1700 DUNNAWAY RD SEMORA, NORTH CAROLINA FIGURE 11-25 GEOLOGIC CROSS SECTION A -A' AND B -B' WITH BORON