Loading...
HomeMy WebLinkAbout20040954 Ver 3_Site Plan_20080218m0-I-- C° TEMPORARY BENCHMARK: TOP OF E I P ALONG BOUNDARY LOCATED �- 630' + /-- FROM R. 0• W• OF EX. SHERRON ROAD AND 123 +/- FROM • INTERSECTION OF PROPOSED POPLAR STREET AND GILMAN STREET. V N - 806200.2105 - °? c E - 2058048.4864 -�� ' � _ �� •� �' i C EL. 369.821 i = JI CI 16 \ -•• �. -mil. .+ -• -' -,♦ t, �- / >< NCDOT CLASS B RIP RAP 1 •� _ ,~ `' - -�, ' \; 18" DEEP * WI GEOTEXTILE ; \ BASE.\ i E 1 r ST r i BMPI ASEMENT J �-• 0 " 24 DIA. CMP OF THE FES. M 1. EMBANKMENT FILL SHALL BE PLACED IN 8 INCH LOOSE LIFTS 0 G.7 NO TREES OF ANY TYPE MAY BE LOCATED ON THE DETENTION BASIN DAM. � U a Z Z TEMPORARY ` EROSION CONTROL CMP RISER ( SEE DETAIL THIS SHEET) CONCRETE HEADWALL WITH 7" ORIFICE PLATE. ( SEE DETAIL THIS SHEET) ES 167 4 TREE PROTECTION 'o C I 163 •�'':.•• \ 1��` I �` FENCING .c --- ••-t / \ I 3 •' ..._ - \ 0 LF - 18" RCP 3.00% INV. IN = 313.00 INV. OUT = 311.50 CL L jt 0 NI l .` (1) 5.5' X 5e5" ° `\ � / �?�� � •\ �' \ `•`\ �', 1 ANT I -SEEP COLLAR ° 0 \ NIII 2 0 \ NCDOT CLASS B RIP RAP m / '�► ohm\, '� �, - C r , \ , 't�3. , DEEP W/ GEOTEXTILE �.. ♦, E X TOP `'\ ���\ FABRIC BASE. L \ •�. -.% 310,83 ` � ' �'� � ` -� / TOE C ` � �� •��• �` / 309.69 GO EX T '. E X\TOP `. `! \ 309 97 \ c \ 1046 Z? •' ` \ O`` `,• `` ,,'� ,,` ` `• , :• ,` `, ,~ , � r ` ♦ `\ ` ` ♦ ` CONCRETE LEVEL SPREADER STORMWATER 6MP EASEMENT 0(1.0 I N /HR) = 0.9 CFS LENGTH 40' y= LEVEL . S PRE A DE R . • • . `� \_ i - m TOP OF LEVEL SPREADER = 311.70 1 o DETENTION BASIN NOTES: -1131 � c . 1 THE RCP OUTLET PIPE SHALL BE CLASS III RCP MEETING THE REQUIREMENTS OF ASTM C760 I o � ° THE PIPE JOINTS SHALL BE CONFINED O-RING RUBBER GASKET JOINTS MEETING THE RON 8 1 83� ♦ �'�,, �` REQUIREMENTS OF ASTM C -443 AND C -361. fA 2. ALL POURED CONCRETE SHALL BE MINIMUM 39000 PSI (28 DAY) UNLESS OTHERWISE NOTED. GEOTEXTILE FABRIC BASE FOR THE OUTLET PIPE DISSIPATOR PAD SHALL BE PLACED` 0 3. THE ��. L m UNDER THE OUTLET END OF THE FES AND EXTEND TO THE EDGE OF THE RIP RAP PAD. THERE \ \ L SHALL NOT BE A GAP BETWEEN THE END OF THE FES AND GEOTEXTILE FABRIC BASE. THE m COMPACTION NOTES: jo FABRIC SHALL BE PLACED UNDER THE END OF THE FES TO- PREVENT SCOURING AT THE END +_ " 24 DIA. CMP OF THE FES. SINGLE PIPE 1. EMBANKMENT FILL SHALL BE PLACED IN 8 INCH LOOSE LIFTS 0 4. NO TREES OF ANY TYPE MAY BE LOCATED ON THE DETENTION BASIN DAM. AND COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR C 5. ADD A 2 " -3" LAYER 9F TOPSOIL TO THE ENTIRE EMBANKMENT PRIOR TO SEEDING AND MAXIMUM DRY DENSITY. o o��oO MULCHING TO STABI IZE EMBANKMENT. REFER TO SEEDING REQUIRMENTS ON SHEET 3 -7. 2. FILL AND BACKFILL PLACED AGAINST ALL STRUCTURES. CULVERTS, 60 6. EMERGENCY SPILLWAY CONSTRUCTED IN A FILL SECTION SHALL BE REINFORCED WITH CONDUITS. DRAINS. ETC. SHALL BE PLACED IN 4 TO 6 INCH LIFTS C o ' X' CABLE REINFORCED ONCRETE CELLULAR MAT OR BY USING THE ARMORLOC SYSTEM AS AND COMPACTED USING HAND -HELD OF MANUALLY `OPERATED EQUIPMENT a ' X' MANUFACTURED BY MORTEC. AND COMPACTED TO 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. ' X' 6. THE CONCRETE ANTI- EEP COLLARS SHALL BE RECTANGULAR CONCRETE COLLARS 3. THE BASIN INVERT AND EMBANKMENT SHALL BE SEEDED IN ACCORDANCE WITH .0 2 CONSTRUCTED TO THE DIMENSIONS INDICATED ON THE DRAWINGS. THE COLLARS SHALL BE THE EROSION CONTROL PLAN WITHIN 15 DAYS OF COMPLETION OF GRADING • O O SHALL BE REMOVED AFTER SITE HAS BEEN A MINIMUM OF 6" TF ICK WITH A 28 DAY STRENGTH OF 39000 PSI (MIN.). THE COLLARS SHALL WORK ON THE BASIN. C 0 2 BE CONNECTED TO RCP OUTLET PIPE WITH A WATER TIGHT JOINT AND SHALL BE PLACED 4. THE BASIN WILL BE USED FOR EROSION CONTROL DURING THE CONSTRUCTION ca ORIFICE PLATE AND SCREEN SHALL BE INSTALLED A MINIMUM OF 2 FEET FROM PIPE JOINTS. THE COLLAR SHALL BE LOCATED NEAR THE CENTER PHASE OF THE PROJECT. THE BASIN SHALL BE CLEANED OUT AND VEGETATION N - OF THE DAM WHERE NE COLLAR IS REQUIRED AND SHALL BE LOCATED /SPACED AS SHOWN COVER SHALL BE ESTABLISHED PRIOR TO USE AS A DETENTION BASIN. .0 - ON THE DRAWINGS W ERE MORE THAN ONE COLLAR IS REQUIRED.. 1 2 2 2 2 3 C OTY, 2 2 3 3 4 4 EMBANKMENT 2 •- 3 3 ( SEE COMPACTION NOTES) 4 L TOTAL LBS. 9 9 F14T14 L �, 0 1 19 55 MAX. 3:1 SLOPE 10' TOP OF DAM = 320.00 1 19 1 19-123 EXTERIOR FACE 1 77 92 Z L Uj C2 Z D tii L 0 ' � EMERGENCY SPILLWAY = 318.20 IC ARMOR DO'W STREAM SIDE ° OF EMERGE CY SPILLWAY v ° WITH NCDO CLASS B RIP RAP WATER LEVEL 100 -YR STORM - 318.81 WITH GEOT XT I LE FABRIC BASE WATER LEVEL 25 - YR STORM 318.69 L 0, �, _•_, WATER LEVEL 10 -YR STORM s 318.61 •.- WATER LEVEL 1 -YR STORM a 317.67 ,, o TIE TO EXISTIN GRADE - .�--- - - I NTS MAX. 3:1 SLOPE BASIN INV = 313.00 INTERIOR FACE ._ L U) w L ' n 30' L x . MAX. 3:1 SLOPE TOP OF DAM = 320.00 C PI ;1 111 111 •a __.__ ..... _._ .�... x z NTS N EMERGENCY SPILLWAY = 318.20 m M O �0 C� O Om z D O O O I-�71 X0 "z�=1> T-n3>m z m z� F_0 7 . r ^�OH e 2 z 3D H O z n j> ° �zzm C31 0 (� z � G7 -� O m = � ° I CC [C) (n -p r-- IT1 -� 00 m Z D p z O D D -0 ~ 71 O m M 0 C7 T1 D 1-0 C O ::E F_ ::0 z < 0 co mW C1) 0 DO m SHEET 1 OF 3 838 0 PJ 1 LEVEL SPREADER LIP EL. = 311.70' CLASS "B" RIP -RAP (D50 = 8") w/ GEOTEXTILE FLOW PATH FABRIC BASE i SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE BELOW ■). 5. CONTINUE TILLAGE UNTIL AWELL - PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME AND SEEDING RATES. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. ■ APPLY AGRICULTURAL LIMESTONE - 3 TONS /ACRE SUPERPHOSPHATE - 500 LBS. /ACRE OF 20% ANALYSIS SUPERPHOSPHATE MULCH - 2 TONS (APPROX.80 BALES) SMALL GRAIN STRAW /ACRE ANCHOR -TACK WITH LIQUID ASPHALT AT 400 GALLONS /ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS /ACRE. SEEDING SCHEDULE PANICUM VIRGATUM* 10 L85. /ACRE =VARIETIES BIACKWELL, HEAVY METAL, ALAMO, KANLOW AND SHELTER ARE ACCEPTABLE WHERE pH IS 5.0 CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. STREAM BUFFER REVEGETATION SCHEDULE (for use where STREAM BUFFERS have been cleared or disturbed) LEVEL SPREADER CONSTRUCTION SPECIFICATIONS: 1. THE LEVEL SPREADER SHALL BE LOCATED OUTSIDE OF THE NEUSE RIPAftlAN BUFFER. 2. THE LIP OF THE LEVEL SPREADER SHALL BE CONSTRUCTED OF CONCRETE AS-SHOWN ON THE LEVEL SPREADER DETAIL (THIS SHEET) AND SHALL BE 3 " -6" HIGHER THAN THE EXISTING GROUND ON THE DOWNSLOPE SIDE OF THE SPREADER. 3. THE LEVEL SPREADER LIP SHALL BE INSTALLED AT A 0 -0.05% GRADE (LEVEL) ACROSS THE ENTIRE LENGTH OF THE LEVEL SPREADER. 4. THE LEVEL SPREADER SHALL BE CONSTRUCTED PARALLEL TO CONTOUR LINES ON THE DOWNSTREAM SIDE OF THE LEVEL SPREADER TO PROVIDE DIFFUSE FLOW THROUGH THE FILTER STRIP /RIPARIAN BUFFER. 5. GEOTEXTILE FABRIC WITH 3 " -4" OF X57 STONE SHALL BE INSTALLED IN THE FIRST 3 FEET FROM THE LEVEL SPREADER LIP ON THE DOWNSLOPE SIDE OF THE LEVEL SPREADER. 6. THE AREA ON THE DOWNSLOPE SIDE OF THE LEVEL SPREADER SHALL PROVIDE A FILTER STRIP FOR STORMWATER DISCHARGE BEFORE ENTERING THE STREAM CHANNEL. ZONE 1 (INNER 30 FEET OF THE NEUSE RIPARIAN BUFFER) SHALL REMAIN FORESTED. ZONE 2 (OUTER 20 FEET OF THE NEUSE RIPARIAN BUFFER) SHALL BE SEEDED AND MAINTAINED AS GRASS. GRASS SHALL BE PLANTED AND ESTABLISHED IN THE OUTER 20 FEET OF THE BUFFER PRIOR TO INSTALLATION OF THE LEVEL SPREADER. 7. THE LEVEL SPREADER SHALL NOT BE CONSTRUCTED UNTIL THE ENTIRE AREA DRAINING TO THE LEVEL SPREADER HAS BEEN STABILIZED DURING CONSTRUCTION OF THE LEVEL SPREADER. THE BASIN DISCHARGE SHALL BYPASS THE LEVEL SPREADER UNTIL CONSTRUCTION OF THE SPREADER HAS BEEN COMPLETED 8. THE INSTALLED STORM DRAINAGE SYSTEM (INCLUDING DETENTION BASIN NO. 4 AND LEVEL SPREADER) SHALL MEET THE DESIGN SPECIFICATIONS UPON INITIAL_ _OPERATION ONCE THE PROJECT IS COMPLETE AND THE ENTIRE STORM DRAINAGE AREA IS STABILIZED. G M G PLACE R 1 R .� BELL END OF PIP TO FACE OF WALL 98 1S CONC. PIPE M ' B WH ( IF CONST. JOINT IS USED) END ELEVATION GENERAL NOTES= 1. ALL CORNERS SHALL BE CHAMFERED 1" OR HAVE A RADIUS OF 1'. 2. THE CONTRACTOR WILL BE REQUIRED TO PLACE 2 96 'Y' BARS IN THE TOP OF ALL ENDWALL FOR PIPE CULVERTS 42' AND OVER WITH A MINIMUM OF 3' COVER AND A LENGTH OF 6' LESS THAN ENDWALL LENGTH. 3. FORMS ARE TO BE USED FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 4. WALL THICKNESS (T) SHOWN IS NOT TO BE INTERPRETED TO MEAN THE THICKNESS ACCEPTABLE. BUT IS USED IN COMPUTING ENDWALL QUANTITIES. 5. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE. BAR 'X' DOWELS SHALL BE PLACED IN THE BASE AS SHOWN ON PLANS. SPACING OF BARS IS TO BE APPROXIMATELY 12' CENTERS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 6. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE AND POUR THE BASE SEPARATELY THE POUR SHALL BE LEFT ROUGH. 70 CLASS 'B' CONCRETE SHALL BE USED. 3" LAYER OF #57 STONE - RIPARIAN BUFFER \- 311.20' - 311.45' 3 T. WIDE STRIP OF CHANNEL FILTER FABRIC INV. = 310.50` APPROPRIATELY SIZED CONCRETE FOOTER LEVEL SPREADER DETAIL N. T. S. 317.80 ' � " 24 DIA. CMP 317.50'RISER SINGLE PIPE DOUBLE PIPE 15' O 24' 0 0000�� 32" 0 DIA C HE RI HOLE AND dp ST ONE AFILTER 0000 4" O.C. VERTICALLY 0 18' 24' O O O O (yc) O ?0 0Q) o��oO 0000.10 3 0 CX�J� )Q 0 60 000 BASIN BOTTOM O 006 ELEVATION = 313.00' �O �Q 9!? 0(,�o O� 0 0 0 U CONC_ „ ' X' RCP 0000 O o�0 18" CMP HEAOWALL18 " X' Y x axe ' X' O O o D ' X' ' X' 300 psi, ' X' CONCRETE G NOTE 2 EXTEND 18" CMP FROM TEMPORARY CMP RISER TO � /�� � •� /, 18" RCP. TEMPORARY CMP RISER AND 18" CMP ° �'-- • --4 -- O O SHALL BE REMOVED AFTER SITE HAS BEEN 6 D STABILIZED AND APPROVAL OBTAINED FROM 2 DURHAM COUNTY EROSION CONTROL OFFICE. 2 THE CONCRETE HEADWALL AND 18" RCP SHALL 3 -6 REMAIN FOR STORMWATER CONTROL. THE 4 ORIFICE PLATE AND SCREEN SHALL BE INSTALLED TEMPORARY EROSION AFTER THE CMP RISER AND 18" CMP BARREL HAVE CONTROL CMP RISER BEEN REMOVED. REFER TO ORIFICE PLATE AND - SCREEN DETAIL THIS SHEET. No T. S. %" STAINLESS STEEL BOLT (TYP) • r1 � 't SLOPE AS INDICATED ON PLANS •4 -BARS THICK ORIFICE PLATE (24" X 24 ") BOLT TO HEADWALL WITH DIA. STAINLESS STEEL y' BOLTS, NUTS W /WASHERS. (4 TOTAL) - 6" DIA. ORIFICE (INV. = 313.01 3' X3' X4" CONCRETE PAD AT BASE OF HEADWALL (CENTERED ON ORIFICE PLATE).-,.., DOWELS IN ENDWALL WITH REINFORCED CONCRETE PIPE LOC. PIPE DIA. SINGLE PIPE DOUBLE PIPE 15' 18' 24' 30" 36' 42' 48' 15' 18' 24' 30" 36' 42' 48' 1' -8 BARS' X ` " X" axe axe " X' ' X' YIN " X' Y x axe ' X' axe ' X' ' X' ' X' Y x ' X' Y x G QTY. 2 1 2 3 3 4 4 2 5 2 2 2 3 3 4 4 2 5 2 M OTY . - - - - - - - 1 1 2 2 2 2 3 G OTY, 2 2 3 3 4 4 5 2 2 3 3 4 4 5 TOTAL LBS. 9 9 F14T14 1 19 55 65 1 12 1 19 1 19-123 1 77 92 DIMENSIONS.AND CONCRETE QUANTITIES USING CONCRETE PIPE COMMON DIMENSIONS SINGLE PIP DOUBLE PIPE D H B G T S L YD= M L YD= 15' 31-30 1' -8 2'-9" 2x' 9x' 5'-61 0.7 2' -2' 7' -8' 1.0 18" 3' - 7' 1 ' - 10 3' - 2' 2 x ' 10' 6"-40 1.0 2' -7-m 8' -11 1.3 24" 4' -2' 2' - i 4'-0" 3" 10' 8' -0' 1.5 3' -5" 11' -5 2.0 30" 5'-0" 21-60 41-76 4x a 11x' 9,1-28 2.3 4' -3' 13' -5 3.1 36' 5'-8" 2' -8" 5' -6v 4 x ' 12 x " 11,f-0' 3.4 5' -01 16' -0 4.5 42' 6' - 2' 3' -1 6' -42 5 x " 11X@ 12'-8' 4.5 5' -10 18' -6' 6.0 48' 6' -99 1 31-5217` -2m 5x• 11 =' i4' -4 6.01 6'-8021' -0 8.0 xSEE SHEET 3 ORIFICE PLATE DETAIL NTS CONCRETE SLOPE AS INDICATED ON PLANS 7" DIA. ORIFICE (INV. - 313.09 18" RCP OUTLET PIPE NEEHAH R-7512-81 CAST IRON PIPE SCREEN FOR 12" PIPE. ANCHOR TO CONCRETE PAD USING STAINLESS STEEL BOLTS, NUTS W /WASHERS. ( 4 TOTAL) npf o Fie 1 8200 QsTruAV�y 8 Ohl A �o •. .o. SEAL 15395 •' • •• F IRI •' z jr)06 SCALE IN FEET o•4 -oqSL} v3 0 10 20 40 60 80 CITY DURHAM PUBLIC WORKS DEPARTMENT -- APPROVED --- ENGINEERING STORM WATER TRANSPORTATION DATE DATE DATE DATE DATE [i I 0 V � N J Q� �� N WWV� =� g LU 2� g! Luz � z.o a 0Z 3 Z Z96o�� �Qr zom,,� O Z O? a� X cc I r co 2 Biwa mi OW.G7Z0�0 Z 0 co) us ru Mal 40 vIIIIIIi, rm W6 mV.. > »m Z O C4 LU Z > 11IM111 cc 3 cc Q W 00 V V �C y � Z so cc O � F N J v oo Z j2 cc O � m W Q W CL 00 O � � Z N > Uj N � D � cc o m ��a m �m m N a J z. � go z � � Z N 0 Uj II Z Uj C2 Z D tii C% ' � Z O C4 Z > 11IM111 cc 3 cc Q W co 0 �C = Z W cc J ca Z 0 O � m Q W CL � y O � � Z > Uj 0 D � cc o LL W m N a J r Lt% � = /M+ y V O q* � r Im 0 Z C TEMPORARY BENCHMARK: TOP OF E I P ALONG BOUNDARY LOCATED 630 +/- FROM R.O• W• OF EX. SHERRON ROAD AND 123 +/- FROM i, INTERSECTION OF PROPOSED POPLAR STREET AND GILMAN STREET. - �` a N - 806200.2105 1 E - 2058048.4864 1 / C EL. 369,821 °d 1 i TREE PROTECTION / X :f •� I FENC/NG dop loop aj / 4- / o I I / c \ i u i U) ` � � ' I Ln t i Y'1' '1•:i: ' OI• firME MX� / MIN STORMWATE "0 �'< <� BMP EASE NT Of 09.6 CL Id • / / o � ♦ , �/ 1 // 1 4- f , OL L � f C c I wo / ar ! / / ,0 L e % R IABL �'\ 0 1000' P / o � .� �� BMPREAStMENT � 3 / mop i 7 C-1-9 C �, r�� / / �r -� / / 10. ♦ 50, L � j C1 ° �� - �� j DURNAIII E . -''' / / 3064 10 BLDG. / 0 - r. /� � / - SETBACK I c ; �/ r PREFORMED SCOUR HOLE / / ( SEE DETAIL THIS SHEET )l / 0(1.0 I N /HR) = 1.1 CFS t / if , N110000' ��� r `rte f I r mam son 4000P m 3 �\ ..• f 0 N10001 L do ftmin z .,. / O 00, - - ... i 1 10I 400 W / W F.�A NIIIIII/ as / 1 Arl,64, IV 50' NEUSE R1 R BUFF R 11 rl tl r ►` 1� � EMBANKMENT � TEMPORARY EROSION CONTROL CMP RISER (SEE COMPACTION NOTES) � ( SEE DETAIL MAX. 3:1 SLOPE 10' THIS SHEET) M EXTERIOR FACE TOP OF DAM = 315.00 00 0 o NIX r TREE PROTECTION v Z :EMERGENCY SPILLWAY 313.50 � FENCING z ARMOR UPSTREAM SIDE. DOWNSTREAM SIDE i AND TOP OF DAM WITH CABLE REINFORCED CONCRETE WATER LEVEL 100 -YR STORM a 314.04 CELLULAR MAT OR THE ARMORTEC ARMORLOC SYSTEM. _. .,._. WATER LEVEL 25 -YR STORM 313.93 WATER LEVEL 10 -YR STORM >= 313,84 ARMOR UPSTREAM SIDE, DOWNSTREAM SIDE w WATER LEVEL 1 -YR STORM 313.37 AND TOP OF DAM WITH CABLE REINFORCED CONCRETE TIE TO EXISTING GRADE _ __Q/ CELLULAR MAT OR THE ARMORTEC ARMORLOC SYSTEM. ---- --- --- �. _.. CONCRETE HEADWALL NTS 7" DIA. ORIFICE PLATE. MAX. 3:1 SLOPE BASIN INV = 309.50 (SEE DETAIL THIS SHEET) INTERIOR FACE ■ W -(1 )4,5" X 4.5' MAX. 3:1 SLOPE TOP OF DAM = 315.00 ANTI-SEEP COLLAR -- 30 _._._ ._ _.. o i _ 0 45 LF 18 � .e RCP � 1.11 % •--- --- -- --- .---�- -- ii CC I Nv. I N = 309.50 --- - ---- --- - - -.-- -- - LU s- a o INV. OUT = 309.00 -- ---- ---- -- W o �. g! z � a NCDOT CLASS B RIP RAP COMPACTION NOTES: NTS (,Z 3: 18 DEEP W/ GEOTEXTILE EMERGENCY SPILLWAY = 313.50 � FABRIC BASE. 1. EMBANKMENT FILL SHALL BE PLACED IN 8 INCH LOOSE LIFTS u� �°- W =4.0 FT 313.50 24 A. DI CMP cc AND COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR z cIs L = 7.5 FT RISER o g 411 � In MAXIMUM DRY DENSITY. 313.00 UJ 2. FILL AND BACKFILL PLACED AGAINST ALL STRUCTURES. CULVERTS. a CD CHANNEL DESIGN. let o� CONDUITS, DRAINS, ETC. SHALL BE PLACED IN 4 TO 6 INCH LIFTS 01 DISCHARGE = 2.2 CFS AND COMPACTED USING HAND--HELD OF MANUALLY OPERATED EQUIPMENT F z ca fl10 DISCHARGE 2.4 CFS AND COMPACTED TO 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. O 0000--) :d � -� ♦ CHANNEL SLOPE = 20 3. THE BASIN INVERT AND EMBANKMENT SHALL BE SEEDED IN AC U AC o dr I � CHANNEL WIDTH = 4.0 FT. ACCORDANCE WITH po o � 0 � _ THE EROSION CONTROL PLAN WITHIN 15 DAYS OF COMPLETION OF GRADING O O O 0 Q CHANNEL DEPTH = 1 ■ 0 FT. CC i �, p # 5 WASHED � --� o `'' SIDE SLOPES = 3:1 WORK ON THE BASIN. ���� DIA DEWA I T I NG HOLE o J = 4 . THE 3 O.C. HORIZONTALLY AND 100000 STONE FILTER ■■i Mel VELOCITY 3.78 FPS E BASIN WILL BE USED FOR EROSION CONTROL DURING THE CONSTRUCTION 00 -- o PHASE OF THE PROJECT. THE BASIN SHALL BE CLEANED OUT AND VEGETATION 4 O.C. VERTICALLY p p 0 � FLOW DEPTH = 0.58 FT. 0000 O p id - W u- CALCULATED SHEAR = 0.67 LB /SF COVER SHALL BE ESTABLISHED PRIOR TO USE AS A DETENTION BASIN. oQp o (')o � d„ PERM I SS I BLE SHEAR = 1.00 LB /SF O C� �,. 00% _ o o000 o0 CHANNEL LINING - GRASS (TALL FESCUE) 0 0 0 cm Oo o � a, pp IL O O 000 4(00 mi BASIN BOTTOM 0 10011 W O 0 0 ELEVATION = 309.50 0 p p 0 0 0 o O Q o�00 0 o CONC . 000 O 0U0 18" CMP 18 RCP 0 p p p p o o HEADWALL mi 0 0 0 0 0 O o0 op v I v I N 3`d00 psi I ° ° I ° R, W NOTE CONC�ETEr I D I p 2 2 • I Q Q DETENTION BASIN NOTES: ° -' ° � EXTEND 18" CMP FROM TEMPORARY CMP RISER TO Q1 • . I ' �• 8 1. THE RCP OUTLET PIPE SHALL BE CLASS III RCP MEETING THE REQUIREMENTS OF ASTM C76. 18"" RCP. TEMPORARY CMP RISER AND 18"' CMP ° - --'- -r- -- THE PIPE JOINTS SHALL BE CONFINED 0 -RING RUBBER GASKET JOINTS MEETING THE SHALL BE REMOVED AFTER SITE HAS BEEN ° ° ° ° N � a a REQUIREMENTS OF ASTM C -443 AND C -361. STABILIZED AND APPROVAL OBTAINED FROM u,t Z p USED ! 2. ALL POURED CONCRETE SHALL BE MINIMUM 3.000 PSI (28 DAY) UNLESS OTHERWISE NOTED. DURHAM COUNTY EROSION CONTROL OFFICE. :) o 3 THE GEOTEXTILE FABRIC BASE FOR THE OUTLET PIPE DISSIP TOR P THE CONCRETE HEAD 3' -6" J. N 1 UR rNU an/1l-1- OC rLNk.GU "NLL HIVU I O Rl.r JIIHLL UNDER THE OUTLET END OF THE FES AND EXTEND TO THE EDGE OF THE RIP RAP PAD. THERE REMAIN FOR STORMWATER CONTROL. THE V O V � � SHALL. NOT BE A GAP BETWEEN THE END OF THE FES AND GEOTEXTILE FABRIC BASE. THE ORIFICE PLATE AND SCREEN SHALL BE INSTALLED TEMPORARY EROSION 3 FABRIC SHALL BE PLACED UNDER THE END OF THE FES TO PREVENT SCOURING AT THE END AFTER THE CMP RISER AND 18 CMP BARREL HAVE v 0 I � � moo � � OF THE FES. BEEN REMOVED. REFER TO ORIFICE PLATE AND CONTROL CMP RISER p ♦ ♦ 4. NO TREES OF ANY TYPE MAY BE LOCATED ON THE DETENTION BASIN DAM. SCREEN DETAIL THIS SHEET. N. T. S. 00 � 5. ADD A2"-3" LAYER OF TOPSOIL TO THE ENTIRE EMBANKMENT PRIOR TO SEEDING AND 7 q MULCHING TO STABILIZE EMBANKMENT. REFER TO SEEDING REQUIREMENTS ON SHEET C3 -7. j � p b. EMERGENCY SPILLWAYS CONSTRUCTED IN A FILL SECTION SHALL BE REINFORCED WITH N N �. CABLE REINFORCED CONCRETE CELLULAR MAT OR BY USING THE ARMORLOC SYSTEM AS 'A" THICK ORIFICE PLATE (24" X 24 ") BOLT TO HEADWALL WITH SLOPE AS N r MANUFACTURED BY ARMORTEC. 3�g" DIA. STAINLESS STEEL CONCRETE INDICATED ' � �� c ruc nn.�or-rr •►irT -crr� nn ♦or cues i or OClTA \I/111 .o nn.nnrrr nn .nc- �- I �r..r,�_...� � /ice p C L o / / C,f / 4'/ 0000, X / Figure 8-4 � , '" � ,,,,,, /� 00 6100 / F 00 YEAR �_ --- ZOO6 z, LOODWA T ical preformed scour hole layout and components (NCDOT ) / - �''� BOUNDARY--­., y� C y ,./ 4 � S ........_..__._. _.._.._.._...______._.__._. f- �, EX. 30' CITY OF UiMAM / r ' SAN. SEWER MENT +- L / , �i i �� PIPE _ . • ; ,.,,�. _....... .,.,. ._ _ T / / (d =15° OR 16") - _. ; ' _ (STANDARD. m / / t ; ROLL WIDTH) 0 d i % _ +- bi1y O. 1 I'7L 1. U1V l.RC I C HIV I 1 -JCGr UULLARJ Jf7NLL DG RCS. 1 HIVVVLHR I.UIYI.RC 1 C I.VLLHI'[J CONSTRUCTED TO THE D[MENSIONS INDICATED ON THE DRAWINGS. THE COLLARS SHALL BE A MINIMUM OF 6" THICK WITH A 28 DAY STRENGTH OF 3.000 PSI (MIN. 1. THE COLLARS SHALL BE CONNECTED TO THE RCP OUTLET PIPE WITH A WATER TIGHT JOINT AND SHALL BE PLACED � 1 A MINIMUM OF 2 FEET FROM PIPE JOINTS. THE COLLAR SHALL BE LOCATED NEAR THE CENTER / 1 OF THE DAM WHERE ONE COLLAR IS REQUIRED AND SHALL BE LOCATED /SPACED AS SHOWN ON THE DRAWINGS WHERE MORE THAN ONE COLLAR IS REQUIRED.. 0 em t" 0 <ai 1__4 :D U) r- � __q Z . -4 =D 0 O � n -I =MZ3> 2 O O O c� °x C) '-' M _­4 z D D < Cn ~ O Z (bMvNbSoJ -� , • E ,P -- PER14AI�NT SOIL v 900e SQUARE PREFORMED -- -� ...... _ ` REINrORCEi�IEN MATTING PSR1 . PSM SHALL BE r �' SCOM HOLE (PFSM t 8-�-� IN BAS( N NOT SEEDED W11 "I VEGETATION c� PREFORMED SCOUR HOLE CONSTRUCTION SPECIFICATIONS: ���'' SHOWN FOR CLARITY} AT INSTALLATION. D O o f �-' z z m U 0 1. THE PREFORMED SCOUR HOLE SHALL BE LOCATED OUTSIDE OF THE »�.. ,_.,..._.�. 01 O (--) Z a NEUSE RIPARIAN BUFFER. 2. THE PERMANENT SOIL REINFORCEMENT MATTING (PSRM) SHALL BE TUCKED A MINIMUM OF 1 FOOT UNDERNEATH THE FILTER FABRIC Z • O --1 Cn o AND NATURAL GROUND AROUND THE PERIMETER OF THE SCOUR HOLE. U C C m = N 3. THE SIDE SLOPES FOR ALL FOUR SIDES OF THE SCOUR HOLE SHALL CD 00 4- - OE 2:1 SLOPES. Figure 8-5 000 1> N 4. LL RIP RAP USED FOR THE CONSTRUCTION OF THE SCOUR HOLE _ m D D HALL B E NCDOT D 0 T CLASS B RIP RAP { d 5 0 =8 ") . THE MINIMUM DEPTH Preformed scour hole cross section (NCDOT 2006) O O m LL -T3 ::E: D L OF THE RIP RAP SHALL BE 12 ". SHALL BE CONSTRUCTED IN UNDISTURBED SOIL. H D 0 5. tHE SCOUR HOLE -D � �- O T y 6. THE PREFORMED SCOUR HOLE SHALL NOT BE CONSTRUCTED UNTIL /.. _._ PIPE . M �' 0 THE ENTIRE AREA DRAINING TO THE PREFORMED SCOUR HOLE HAS f F PSRi�A m 0 ,d 'I �R 8") lNSTAL.L LE�tEI AND I �o X E E N STABILIZED. . off s PLUSH V�FiTH I�IAT�JRJ�L (--� Tj D 0 7. THE PREFORMED SCOUR HOLE EXIT AREAS SHALL BE STAB I L I ZED �`•. ,.0 O � • `-=•�� DEPTH OF SCOUR HOLE k GROUND � C F-, WITH VEGETATION IMMEDIATELY AF TER CONSTRUCTION OF THE •�..�• �== � ; T • o F-- � z C OUR HOLE . • • -�.:.� ,�„ ('i N. 7 MA I NATURAL < � � >1 8. AFTER CONSTRUCTION OF THE SCOUR HOLE. ALL AREAS AROUND ; �,.;. fTl w..._._........_..._. - . ,._._� ......_ ._. Cn c THE SCOUR HOLE SHALL BE CLEARED OF CONSTRUCTION DEBRIS GRaUND 7C �--+ Y AND THE EXIT AREAS SHALL BE CHECKED FOR POTENTIAL OBSTRUCTIONS :•-� : r-: ~• j -� =�:' •� -i :)D 0 - a THAT COULD PROMOTE CHANNEL I ZED FLOW. LINER. CLASS B RIPRAp �- 0 9. tHE INSTALLED STORM DRAINAGE SYSTEM (INCLUDING DETENT ION WITH TYPE 2 FILTER FABRIC -�'= � � SIN, T TUCK m OASIN NO. 5 AND PREFORMED SCOUR HOLE) SHALL MEET THE DESIGN ; ? $PEC I F I CATIONS UPON INITIAL OPERATION ONCE THE PROJECT DEPTH �� RIPRAP 01 n ]IS COMPLETE AND THE ENTIRE STORM DRAINAGE AREA IS. STABILIZED. BASE co M WIDTH HEET 1 OF 3 0 8 3 81, 01 PLAN G M G PAC- R V R BELL END OF PIP TO FACE OF WALL I.............. -1 S CONC. PIPE H M B (IF CONST. JOINT IS USED) END ELEVATION GENERAL NOTES: 1. ALL CORNERS SHALL BE CHAMFERED 1' OR HAVE A RADIUS OF 1'. 2. THE CONTRACTOR WILL BE REQUIRED TO PLACE 2 *6 'Y' BARS IN THE TOP OF ALL ENDWALL FOR PIPE CULVERTS 42' AND OVER WITH A MINIMUM OF 3' COVER AND A LENGTH OF 6" LESS THAN ENDWALL LENGTH. 3. FORMS ARE TO BE USED FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 4. WALL THICKNESS (T) SHOWN IS NOT TO BE INTERPRETED TO MEAN THE THICKNESS ACCEPTABLE, BUT IS USED IN COMPUTING ENDWALL QUANTITIES. 5. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE. BAR 'X' DOWELS SHALL BE PLACED IN THE BASE AS SHOWN ON PLANS. SPACING OF BARS IS TO BE APPROXIMATELY 12" CENTERS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 6. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE AND POUR THE BASE SEPARATELY THE POUR SHALL BE LEFT ROUGH■ 7. CLASS 'B' CONCRETE SHALL BE USED. %" STAINLESS STEEL BOLT (TYP) BOLTS, NUTS W /WASHERS. (4 TOTAL) 7" DIA. ORIFICE (INV a 1 309.5 SLOPE AS INDICATED ON PLANS N m • 4 - BARS 12' DOWEL BAR -11x 3' X3' X4" CONCRETE PAD AT BASE OF HEADWALL (CENTERED ON ORIFICE PLATE) . ORIFICE PLATE DETAIL NTS DOWELS IN ENDWALL WITH REINFORCED CONCRETE PIPE LOC- PIPE DIA. SINGLE PIPE DOUBLE PIPE 15' 18' 24■ 30' 36' 42' 48' 15' 18' 24' 30' 36' 42' 48' 1 ' - 8 BARS■X" 2 " ' ■Xw sX■ vX■ aX■ 2xv YX aX■ Yx ■x■ ■Xa •X■ ■XE ■Xa ■X■ Yz X■ Y: G OTY . 2 2 3 3 4 4 2 5 2 2 2 3 3 4 4 2 5 2 M OTY - - - - - - - - 1 1 2 2 2 2 3 6' - 4 QTY. 2 2 3 3 4 4 5 2 2 3 3 4 4 5 TOTAL LBS. 9 9 14 14 19 55 65 12 12 19 19 23 77 92 DIMENSIONS AND CONCRETE QUANTITIES USING CONCRETE PIPE COMMON DIMENSIONS SINGLE PIP DOUBLE PIPE 0 H B G T S L YD= M L YD= 15' 3' - 3' 1 ' - 8 2' - 9' 2 " ' 9 = " 5' - 6 0.7 2' - 2' 7' - 8' 1.0 18' 3' - 7' 1 ' -10 3' - 2' 2 = ' 10' G' - 4 1.0 2' - 7' 8' -11 1.3 24' 4' - 2' 2' -1 4' - 0' 3' 10' 8' - 0 • 1.5 3' - 5' 11 ' - 5 2.0 30' 5' - 0' 2' - 6. 4' - 7' 4 =' 11= " 9' - 2' 2.3 4' - 3' 13' - 5 3. 1 36' 5' - 8. 2' - 8 5' - 6 4 = " 12 = ' 11 ' - 0 3.4 5' - 0' 16' - 0 4.5 42' 6' - 2' 3' -1 6' - 4 5 = ' 11= ' 12' - 8 4.5 5' -10 18' - 6 6.0 48' 6' -9' 3' -5■ 7' -2' 5=' 11=' 14' -4 6.0 6' -8'21' -0 8.0 "SEE SHEET 3 7CHUWHLL ON PLANS m 7" DIA. ORIFICE � � Z (INV. - 309.50') .01 O Q Q m m Y Z 18" RCP L0 V OUTLET PIPE z a 00 w= z co W u NEEHAH R-7512 -61 CAST IRON PIPE FM � SCREEN FOR 12" PIPE. ANCHOR TO 9 W CONCRETE PAD USING STAINLESS S Z Q'� STEEL BOLTS, NUTS W /WASHERS. (4 TOTAL m Q O y I 6ww0;Pww&Mfijj Z11 CO)GS SCALE IN FEET 0 15 30 60 90 120 CITY OF DURHAM PUBLIC WORKS DEPARTMENT -- APPROVED -- ENGINEERING DATE STORM WATER DATE TRANSPORTATION DATE DATE DATE Z O y � > ica cc LU m o � 0 y W W cc J y Z 0 O O � m V V so D D Q W C Cr. 0 d z ° O O 0 CD L LLM m W W y W Imu It J I 6ww0;Pww&Mfijj Z11 CO)GS SCALE IN FEET 0 15 30 60 90 120 CITY OF DURHAM PUBLIC WORKS DEPARTMENT -- APPROVED -- ENGINEERING DATE STORM WATER DATE TRANSPORTATION DATE DATE DATE - y V LLi O Z Z O y � > ica cc LU m o � 0 y W W cc J y Z 0 O O � m V V so D D Q W C Cr. 0 d z ° O O 0 CD L LLM m W W y W Imu It J �sowsGwu* wosuuvm Q� S 83� �Y�°'" dNMa,yi `'�4tV�.' f•+� riW +YR►`.a SHEET DA-4 9-Va 133HS - _ ,�- - 109 it :31VOS 9 'ON NISVB NOIlN3134 110=1 310H 21f10oS a3W210.4321d NOISIAIa8f1S s a00M1HJRl9 s OEM I D 1R@[gflw[g I FEB 1 8 2008 DMR -WATER -QUALITY V".AkdS AND STORMWA*R BRANCH