HomeMy WebLinkAbout20072235 Ver 1_Stormwater Info_20080115WITHERS ~~y RAVENEL
STORMWATER MANAGEMENT
REPORT
5401 North
Raleigh, North Carolina
Prepared For:
5401 NORTH, LLC.
563o Bankers Avenue
Baton Rouge, LA 70808
Attn : Carolyne E. Martin, V.P.
Prepared By:
WITHERS &RAVENEL, INC
i1i MacKenan Drive
Cary, North Carolina 275ii
February 2008
W&R Project No. 2070102
C. Heath Wadsworth, PE
5401 NORTH
STORMWATER MANAGEMENT REPORT
RALEIGH, NORTH CAROLINA
INTRODUCTION
5401 North is a planned development located in north Raleigh near the interchange of Louisburg
Road and Interstate 540. The 39o-acre development proposes a mix of retail, office, and residential
uses. The site is bounded to the east by the Neuse River and is subject to the North Carolina
Division of Water Quality Neuse River Basin rules for stormwater management. The development
will also be subject to the stormwater management ordinances of the City of Raleigh. The purpose
of this report is to establish the minimum criteria for stormwater compliance that will apply to 54oi
North and the overall proposed stormwater management approach to meet the requirements.
STORMWATER MANAGEMENT REQUIREMENTS
Because the proposed development is within the Neuse River Basin, the site must meet the site
requirements relating to the Neuse River Basin rules. To meet these requirements, the nitrogen
export from the site must be calculated and brought under 3.60 lbs/ac/yr using Best Management
Practices (BMP) and/or a buy down payment. stormwater quantity leaving the proposed site must
also be controlled. NC DWQ requires the attenuation of the 1-year, 24-hour storm. In addition to this
requirement, the stormwater control regulations found in the City of Raleigh's Code of Ordinances
state that the z-year, z4-hour storm and the io-year, z4-hour storm must be attenuated. Attenuation
of the storm means that the post-development peak flow for the design storm cannot exceed the
peak flow of the pre-development conditions. Exceptions to this requirement include cases where
the post-developed peak flow for the z and io-year storms is less than 10% greater than the pre-
5401 North W&R Project zo7oioz
stormwater Management Report February zoo8
Figure 1. Proposed 54oi North Development Boundary
5401 NORTH
STORMWATER MANAGEMENT REPORT
RALEIGH, NORTH CAROLINA
developed peak flow for the 2 and 1o-year storms. The attenuation requirement is also exempt for
sites or portions of sites that drain directly to FEMA mapped Special Flood Hazard Areas (SERA). The
portion of the site that drains to another property before the stormwater reaches the SFHA will
require attenuation ofthe 2-year, 2!}-hour storm and the 1o-year, 2!}-hour storm.
Other stormwater management requirements include the establishment of a buffer around all
streams that appear on the latest edition ofthe USGS Quadrangle map orthe NRCS Soil Survey map.
Development within this buffer is limited by the table of uses found in the NC DWQ or City of Raleigh
regulations.
STORMWATER MANAGEMENT APPROACH
To meet the requirements of the stormwater management regulations, Withers & Ravenel proposes
an overall stormwater management plan. Under this plan approximately 23o acres of the 39o acre
development would drain to Best Management Practices (BMP) devices. Each BMP design would
conform to the NC DWQ stormwater Best Management Practices manual (BMP Manual). The primary
function of the structural BMP's would be to treat stormwater to remove nitrogen and to attenuate
the stormwater peak flow. To achieve nitrogen removal, z4 of the proposed BMP's will be either
constructed stormwater wetlands or detention ponds with wetland fringes. A detention
pond/wetland fringe combination has a nitrogen removal rate of 30% according to NC DWQ.
stormwater wetlands have a removal rate of 40% of the nitrogen export according to the BMP
Manual. Two of the BMP's are proposed to be bioretention cells, providing 35% nitrogen removal.
The cumulative treatment of the i8 structural BMP devices would remove approximately 34% of the
nitrogen export from the proposed site. We anticipate a decrease in the nitrogen export of the
proposed site to 6.65 lbs/ac/yr. To receive credit to decrease the total nitrogen export to 3.60
lbs/ac/yr, an offset payment of approximately $i million will be made.
The structural BMP devices will also be designed for peak flow attenuation, where necessary. The
BMP's that discharge off-site and not to a SFHA will be designed so that the 2-year and io-year storm
are attenuated at five analysis points. Four of these points are located where stormwater flow will
leave the proposed site. One analysis point is located at an existing pond. The post-development
peak flows for the 2 and io-year peak flows will not exceed the pre-development 2 and io-year peak
flows at the analysis points. In addition to meeting the requirements in attenuating the 2 and 10-
yearpeak flows, the i5-year storm will also be attenuated at the analysis points.
The locations of the proposed BMP's and peak flow attenuation analysis points are shown on the
attached map.
Delineation of the drainage area to each BMP was based on existing terrain and a preliminary
estimate of storm drainage design. The impervious area for each drainage area was estimated
based on the proposed land use within the drainage area. To determine the surface area required
for each BMP, the volume of run-off created by an inch of rainfall (the "first flush") was calculated for
the drainage area. To calculate this water quality volume the Simple Method was used, as
described in the DWQ BMP Manual. This method uses arun-off coefficient to calculate the volume
of run-off given a depth of rainfall. The run-off coefficient is determined based on the percent
imperviousness of the drainage area. stormwater wetlands are required to have less than a foot of
depth for the water quality pool according to the DWQ BMP Manual. To determine the minimum
surface area required for the stormwater wetlands, the water quality volume was divided by i foot.
Bioretention cells are preferred by DWQ to be designed so that the water quality pool is 9 inches in
depth. The water quality volume going to the bioretention cells was divided by 9 inches to calculate
the minimum surface area required for the two bioretention cells. The minimum surface area
5401 North W&R Project zo7oioz
stormwater Management Report February zoo8
5401 NORTH
STORMWATER MANAGEMENT REPORT
RALEIGH, NORTH CAROLINA
necessary forthe two wet ponds with wetland fringes was determined as directed in the NC DWQ
BMP manual.
After completion of full grading plan the BMP outlet structures will be designed to meet the
attenuation requirements set forth in the previous section.
5401 North W&R Project zo7oioz
Stormwater Management Report February zoo8
5401 NORTH
STORMWATER MANAGEMENT REPORT
RALEIGH, NORTH CAROLINA
BMP SIZING
CALCULATIONS
5401 North W&R Project 2o7oio2
Stormwater Management Report February zoo8
BMP Sizing Requirements (All BMP's Are Wetlands Unless Otherwise Noted)
BMP Name Drainage Area
(acres) Estimated %
Impervious for DA Surface Area Req'd
(acres) Water Quality
Volume Req'd (cu. ft)
BMP 1 28.12 70 1.60 69,702
BMP 2 7.72 85 0.52 22,839
BMP 3 (Wet Pond) 9.89 70 0.28 24,412
BMP 4 (Wet Pond) 18.19 85 0.65 53,814
BMP 5 42.88 78 2.70 117,443
BMP 6 7.98 75 0.48 21,001
BMP 7 17.6 45 0.67 29,069
BMP 8 (BioRet) 6.69 45 0.34 11,050
BMP 9 (BioRet) 11.96 45 0.60 19,754
BMP 10 14.72 45 0.56 24,312
BMP 11 21.26 45 0.40 35,114
BMP 12 14.55 55 0.66 28,785
BMP 13 10.82 65 0.57 24,941
BMP 14 20.9 65 1.11 48,176
BMP 15 9.53 55 0.43 18,854
BMP 16 6.97 55 0.32 13,789
Yellow denotes that 2, 10, & 15-year storm attenuation is needed at these BMPs. Additional
storage above the WQ Volume will be required.
Project Name: 5401 North Project #: 2070102
i /State: Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Qmm~var FfFirinn~v in fi/~a Piat/mnnt
Impervious
Cover Permanent Pool Dep
3.0 4.0 5.0 6.0 th (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENK/DW(1 Stormwater best Management rracnces, pg. 5, Apra iyyy
STORMWATER BMP #1 -WETLANDS (85% TSS Removal 8~ 40% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Commercial 22.14 65 14.39
Town Center 5.98 90 5.38
Totals 28.12 19.77
Total % Impervious Surface Area = 70.3
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 2.90 2.25 2.06 1.80 1.47 1.37 1.35
Minimum Surface Area R wired
Acres 0.81 0.63 0.58 0.51 0.41 0.38 0.38
Sq. Ft 35463.42 27550.35 25215.27 22018.88 17957.31 16728.52 16483.54
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 2.90 % From Table 1.1
Minimum pond surface area (SA) _ ( DA * SA/DA ratio)/100
SA = 0.814 acres
35463 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(q where, Rv =Runoff coefficient, in./in.
=Percent impervious
Rv = 0.68 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 1.600 acre-ft
69702 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
Project Name: 5401 North Project #: 2070102
Citk/State: #REF! Date: 2/8/2007
STORMWATER BMP #1 -WETLANDS (85% TSS Removal & 40% TN Removal)
Orifice Calculator
Variables
WQ Volume:
Head:
Draw down time:
0 Acre-ft
0.00 ft
51 h rs
0 cf
Oft
183600 s
Constants
g=
Cd =
32.2 ft/s2
0.6
Orifice Area =
#DIV/0! sq. ft
Orifice Diameter = #DIV/0! in
#DIV/0! sq. in
Max Q= #DIV/0! cfs
BMP2
Project Name: 5401 North Pr ' c #: 2070102
it / at :Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area fo Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
% Impervious
Cover Permanent Pool Depth (feet)
3.0 4.0 5.0 6.0 7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 7999
STORMWATER BMP #2 -WETLANDS (85% TSS Removal & 40% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Commercial 7.72 85 6.56
Totals 7.72 6.56
Total % Impervious Surface Area = 85.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 3.55 2.94 2.52 2.22 1.99 1.72 1.55
Minimum Surface Area Re wired
Acres 0.27 0.23 0.19 0.17 0.15 0.13 0.12
Sq. Ft 11938.05 9886.73 8474.34 7465.49 6675.22 5767.26 5195.58
Surface Area of Permanent Pool:
Assumed depth = 3
SA/DA ratio = 3.55
Minimum pond surface area (SA) _ (I
SA = 0.274
11938
feet
From Table 1.1
JA * SA/DA ratio)/100
acres
sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
I =Percent impervious
Rv = 0.82 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.524 acre-ft
22839 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP3
Project Name: 5401 North Project #: 2070102
Ci tate: Raleigh, NC Date: 1-Fek~08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Fffirienrv in the Piedmont
°k Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater best Management Practices, pg. 5, April 1 yyy
STORMWATER BMP #3 -WET POND WITH WETLAND FRINGE (85% TSS Removal 8~ 30% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Commercial 9.89 70 6.92
Totals 9.89 6.92
Total % Impervious Surface Area = 70.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 2.88 2.40 2.07 1.79 1.54 1.35 1.26
Minimum Surface Area Re wired
Acres 0.28 0.24 0.20 0.18 0.15 0.13 0.12
Sq. Ft 12407.28 10339.40 8917.73 7711.47 6634.45 5815.91 5428.19
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 2.88 % From Table 1.1
Minimum pond surface area (SA) _ ( DA * SA/DA ratio)/100
SA = 0.285 acres
12407 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
I =Percent impervious
Rv = 0.68 i n./i n.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.560 acre-ft
24412 cu. ft.
Water quality pool elevations 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP4
Project Name: 5401 North Project #: 2070102
it /State: Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
% Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #4 -WET POND WITH WETLAND FRINGE (85% TSS Removal & 30% TN Removal)
Land Use Area
(ac) ~° IA Imp. Area
(ac)
Commercial 18.19 85 15.46
Totals 18.19 15.46
Total % Impervious Surface Area = 85.0
Normal Pool Depth 3 4 5 6 7 8 9
SA/DA Ratio 3.55 2.94 2.52 2.22 1.99 1.72 1.55
Minimum Surface Area Re wired
Acres 0.65 0.53 0.46 0.40 0.36 0.31 0.28
Sq. Ft 28128.65 23295.28 19967.38 17590.31 15728.27 13588.91 12241.91
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 3.55 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.646 acres
28129 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
=Percent impervious
Rv = 0.82 i n./i n.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 1.235 acre-ft
53814 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP5
Project Name: 5401 North Project #: 2070102
it /State: Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal EffiriPnrv in thr PiPdmnnt
Impervious
Cover Permanent Pool Depth (feet)
3.0 4.0 5.0 6.0 7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
source: rv~utrvrouwtl arormwater tsest Management PracLCes, pg. S, Apnl 7999
STORMWATER BMP #5 -WETLANDS (85% TSS Removal 8~ 40% TN Removal)
Land Use Area
(ac) °~ IA Imp. Area
(ac)
Commercial 25.13 70 17.59
Town Center 17.75 90 15.98
Totals 42.88 33.57
Total % Impervious Surface Area = 78.3
Normal Pool Depth 3 4 5 6 7 8 9
SA/DA Ratio 3.28 2.71 2.33 2.05 1.80 1.56 1.39
Minimum Surface Area R wired
Acres 1.41 1.16 1.00 0.88 0.77 0.67 0.60
Sq. Ft 61216.78 50704.71 43458.33 38228.34 33713.35 29081.96 26009.15
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 3.28 % From Table 1.1
Minimum pond surface area (SA) _ ( DA * SA/DA ratio)/100
SA = 1.405 acres
61217 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
I =Percent impervious
Rv = 0.75 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 2.696 acre-ft
117443 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP6
Project Name: 5401 North Project #: 2070102
i /State: Raleigh, NC Date: 1-Fek~08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #6 -WETLANDS (85% TSS Removal & 40% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Commercial 7.98 75 5.99
Totals 7.98 5.99
Total % Impervious Surface Area = 75.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 3.12 2.59 2.23 1.95 1.70 1.48 1.34
Minimum Surface Area Re wired
Acres 0.25 0.21 0.18 0.16 0.14 0.12 0.11
Sq. Ft 10845.39 9003.07 7734.30 6760.99 5909.35 5127.23 4657.96
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 3.12 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.249 acres
10845 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
I =Percent impervious
Rv = 0.73 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.482 acre-ft
21001 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP7
Proiect Name: 5401 North Project #: 2070102
Cit State: Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
°~ Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #7 -WETLANDS (85% TSS Removal & 40% TN Removal)
Land Use Area
(ac) ~° IA Imp. Area
(ac)
Residentia 17.60 45 7.92
Totals 17.60 7.92
Total °'° Impervious Surface Area = 45.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 1.90 1.58 1.38 1.18 1.00 0.91 0.85
Minimum Surface Area Required
Acres 0.33 0.28 0.24 0.21 0.18 0.16 0.15
Sq. Ft 14528.13 12113.16 10541.52 9008.21 7628.23 6976.57 6478.24
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 1.90 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.334 acres
14528 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
=Percent impervious
Rv = 0.46 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.667 acre-ft
29069 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP 8 (BioRet)
Project Name: 5401 North Project #: 2070102
City/State: Raleigh, NC Da e: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
% Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #8 - BIORETENTION (85% TSS Removal & 35% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Residential 6.69 45 3.01
Totals 6.69 3.01
Total % Impervious Surface Area = 45.0
Normal Pool Depth 3 4 5 6 7 8 9
SA/DA Ratio 1.90 1.58 1.38 1.18 1.00 0.91 0.85
Minimum Surface Area R wired
Acres 0.13 0.11 0.09 0.08 0.07 0.06 0.06
Sq. Ft 5522.34 4604.38 4006.98 3424.14 2899.59 2651.89 2462.47
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 1.90 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.127 acres
5522 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
I =Percent impervious
Rv = 0.46 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.254 acre-ft
11050 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
Project Name: 5401 North Project #:
i /State: Raleigh, NC Date:
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
RPmnval FffiriPnrv in the PiPr/mnnt
BMP 9 (BioRet)
2070102
1-Feb-08
Impervious
Cover Permanent Pool Depth (feet)
3.0 4.0 5.0 6.0 7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #9 - BIORETENTION (85% TSS Removal 8 35% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Residential 11.96 45 5.38
Totals 11.96 5.38
Total ~° Impervious Surface Area = 45.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 1.90 1.58 1.38 1.18 1.00 0.91 0.85
Minimum Surface Area R uired
Acres 0.23 0.19 0.16 0.14 0.12 0.11 0.10
Sq. Ft 9872.53 8231.45 7163.44 6121.49 5183.73 4740.90 4402.26
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 1.90 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.227 acres
9873 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
=Percent impervious
Rv = 0.46 i n./i n.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.453 acre-ft
19754 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP 10
Project Name: 5401 North Project #: 2070102
it /S ate: Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
Impervious
Cover Permanent Pool Dep
3.0 4.0 5.0 6.0 th (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #10 -WETLANDS (85% TSS Removal & 40% TN Removal)
Land Use Area
(ac) ~° IA Imp. Area
(ac)
Residential 14.72 45 6.62
Totals 14.72 6.62
Total % Impervious Surface Area = 45.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 1.90 1.58 1.38 1.18 1.00 0.91 0.85
Minimum Surface Area R uired
Acres 0.28 0.23 0.20 0.17 0.15 0.13 0.12
Sq. Ft 12150.80 10131.01 8816.54 7534.14 6379.97 5834.95 5418.17
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 1.90 % From Table 1.1
Minimum pond surface area (SA) _ ( DA * SA/DA ratio)/100
SA = 0.279 acres
12151 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
=Percent impervious
Rv = 0.46 i n./i n.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.558 acre-ft
24312 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP 11
Project Name: 5401 North Project #: 2070102
Cit~State: Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
Impervious
Cover Permanent Pool Depth (feet)
3.0 4.0 5.0 6.0 7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #11 -WETLANDS (85% TSS Removal & 40% TN Removal)
Land Use Area
(ac) °~ IA Imp. Area
(ac)
Residential 21.26 45 9.57
Totals 21.26 9.57
Total % Impervious Surface Area = 45.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 1.90 1.58 1.38 1.18 1.00 0.91 0.85
Minimum Surface Area Re uired
Acres 0.40 0.34 0.29 0.25 0.21 0.19 0.18
Sq. Ft 17549.32 14632.15 12733.68 10881.51 9214.55 8427.38 7825.42
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 1.90 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.403 acres
17549 sq. ft.
Normal pool elevation = feet To be determined
Surface area provided = acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
I =Percent impervious
Rv = 0.46 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.806 acre-ft
35114 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP 12
Project Name: 5401 North Proeec #: 2070102
i / to :Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
°~ Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ stormwater Best Management Practices, pg. S, April 1999
STORMWATER BMP #12 -WETLANDS (85% TSS Removal & 40% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Residential 14.55 55 8.00
Totals 14.55 8.00
Total ~° Impervious Surface Area = 55.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 2.23 1.88 1.61 1.41 1.19 1.09 1.01
Minimum Surface Area Re wired
Acres 0.32 0.27 0.23 0.20 0.17 0.16 0.15
Sq. Ft 14133.70 11915.40 10172.46 8904.86 7542.20 6908.40 6401.36
Surface Area of Permanent P
Assumed depth = 3 feet
SA/DA ratio = 2.23 % From Table 1.1
Minimum pond surface area (SA) _ ( DA * SA/DA ratio)/100
SA = 0.324 acres
14134 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
I =Percent impervious
Rv = 0.55 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.661 acre-ft
28785 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP 13
Project Name: 5401 North Project #: 2070102
i /State: Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 7999
STORMWATER BMP #13 -WETLANDS (85% TSS Removal 8~ 40% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Residential/Commercial 10.82 65 7.03
Totals 10.82 7.03
Total % Impervious Surface Area = 65.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 2.64 2.22 1.89 1.65 1.42 1.27 1.18
Minimum Surface Area Re wired
Acres 0.29 0.24 0.20 0.18 0.15 0.14 0.13
Sq. Ft 12442.83 10439.72 8907.93 7776.77 6669.17 5962.19 5561.57
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 2.64 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.286 acres
12443 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
1 =Percent impervious
Rv = 0.64 i n./i n.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.573 acre-ft
24941 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP 14
Project Name: 5401 North Project #: 2070102
City/State: Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
% Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #14 -WETLANDS (85% TSS Removal & 40% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Residential/Commercial 20.90 65 13.59
Totals 20.90 13.59
Total % Impervious Surface Area = 65.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 2.64 2.22 1.89 1.65 1.42 1.27 1.18
Minimum Surface Area Re wired
Acres 0.55 0.46 0.40 0.34 0.30 0.26 0.25
Sq. Ft 24034.67 20165.45 17206.64 15021.67 12882.22 11516.61 10742.77
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 2.64 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.552 acres
24035 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
I =Percent impervious
Rv = 0.64 i n./i n.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 1.106 acre-ft
48176 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP 15
Proiect Name: 5401 North Project #: 2070102
it /State: Raleigh, NC Date: 1-Fek1-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal Efficiency in the Piedmont
~° Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #15 -WETLANDS (85% TSS Removal ~ 40% TN Removal)
Land Use Area
(ac) % IA Imp. Area
(ac)
Residential 9.53 55 5.24
Totals 9.53 5.24
Total ~° Impervious Surface Area = 55.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 2.23 1.88 1.61 1.41 1.19 1.09 1.01
Minimum Surface Area Required
Acres 0.21 0.18 0.15 0.13 0.11 0.10 0.10
Sq. Ft 9257.33 7804.38 6662.79 5832.53 4940.01 4524.88 4192.78
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 2.23 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.213 acres
9257 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
=Percent impervious
Rv = 0.55 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.433 acre-ft
18854 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
BMP 16
Project Name: 5401 North Project #: 2070102
i /State: Raleigh, NC Date: 1-Feb-08
Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant
Removal E-fficiencv in the Piedmont
Impervious
Cover Permanent Pool Dept
3.0 4.0 5.0 6.0 h (feet)
7.0 8.0 9.0
10 0.59 0.49 0.43 0.35 0.31 0.29 0.26
20 0.97 0.79 0.70 0.59 0.51 0.46 0.44
30 1.34 1.08 0.97 0.83 0.70 0.64 0.62
40 1.73 1.43 1.25 1.05 0.90 0.82 0.77
50 2.06 1.73 1.50 1.30 1.09 1.00 0.92
60 2.40 2.03 1.71 1.51 1.29 1.18 1.10
70 2.88 2.40 2.07 1.79 1.54 1.35 1.26
80 3.36 2.78 2.38 2.10 1.86 1.60 1.42
90 3.74 3.10 2.66 2.34 2.11 1.83 1.67
Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999
STORMWATER BMP #16 -WETLANDS (85% TSS Removal & 40% TN Removal)
Land Use Area
(ac) °~ IA Imp. Area
(ac)
Residential 6.97 55 3.83
Totals 6.97 3.83
Total % Impervious Surface Area = 55.0
Normal Pool De th 3 4 5 6 7 8 9
SA/DA Ratio 2.23 1.98 1.68 1.50 1.24 1.03 0.80
Minimum Surface Area Re uired
Acres 0.16 0.14 0.12 0.10 0.09 0.07 0.06
Sq. Ft 6770.57 6011.54 5100.70 4554.20 3749.62 3112.04 2413.72
Surface Area of Permanent Pool:
Assumed depth = 3 feet
SA/DA ratio = 2.23 % From Table 1.1
Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100
SA = 0.155 acres
6771 sq. ft.
Normal pool elevation = 0.00 feet To be determined
Surface area provided = 0.000 acres
0 sq. ft.
1-Inch Runoff Volume Calculation
Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987)
Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in.
I =Percent impervious
Rv = 0.55 in./in.
Total runoff volume from 1-inch precipitation:
Runoff volume, S = (Design rainfall) (Rv) (Drainage Area)
S = 0.317 acre-ft
13789 cu. ft.
Water quality pool elevation= 0.00 feet To be determined
Storage volume provided = 0.000 acre-ft
0 cu. ft.
5401 NORTH
STORMWATER MANAGEMENT REPORT
RALEIGH, NORTH CAROLINA
NITROGEN LOADING
CALCULATION S
5401 North W&R Project zo7o1o2
Stormwater Management Report February 2008
Nitrogen Control Plan
Commercial /Industrial /Residential Sites with Known Impervious Area
Project Title: 5401 North (Preliminary Overall Stormwater Management)
Part I. Riparian Buffers
Area includes riparian buffers? [ ] No [ X ]Yes [ ]Exempt
If yes, [ X ] 50 foot [ ] 100 foot
River Basin? [ X ] Neuse [ ]Cape Fear
Basis for Exemption
Show buffers on site plan.
Part II. Nitrogen Calculations (Method 2, Appendix C):
a. Site Information
Total Area of Property incl. RNV
Denuded Area
Impervious Area incl. RNV
Managed open space
Protected open space
b. Pre-development loading:
389.63 acres
327.33 acres
181.05 acres
146.28 acres
60.17 acres
Type of Land Cover
Permanently protected undisturbed open
space (forest, unmown meadow)
Permanently protected managed open space
(grass, landscaping, etc.)
Impervious Area
TOTAL
Nitrogen Loading Rate (Ibs/ac/yr) _
c. Post-development loading:
TN Export
Area TN export coeff from use
acres (Ibs/ac/ r Ibs/ r
235.55 0.6 141.33
154.08 1.2 184.896
0 21.2 0
389.63 326.23
0.84
Type of Land Cover
Permanently protected undisturbed open
space (forest, unmown meadow)
Permanently protected managed open space
(grass, landscaping, etc.)
Impervious Area
TOTAL
Nitrogen Loading Rate (Ibs/ac/yr) = 9.44
TN Export
Area TN export coeff from use
(acres) (Ibs/ac/yr) (Ibs/yr)
60.17 0.6 36.10
167.06 1.2 200.47
162.4 21.2 3442.88
389.63 3679.45
Proposed BMP(s) 13 Wetlands, 2 Wet Ponds w/ Wetland Fringes, & 2 Bioretention Cells
Nitrogen Load after BMPs = 6.81 Ibs/ac/yr
Nitrogen Load offset by Payments = 3.21 Ibs/aGyr Estimated Buy Down = $1,065,052
Net change in on-site NLoad = 5.84 Ibs/ac/yr
Part III. Control of Peak Stormwater Flow (for 1 year, design storm)
Calculated Pre-development Peak Flow
Calculated Post-development Peak Flow
Proposed BMP(s)
Post BMP Peak Flow
I, the undersigned, certify to the best of my knowledge that the above information is correct (affix seal).
0 cfs To be determined
0 cfs
Supply notes & details showing control of Nitrogen and peak Stormwater runoff.
Nitrogen Control Plan
Commercial /Industrial /Residential Sites with Known Impervious Area
Project Name: 5401 North
Project #: 2070102
TOTAL TRACT (Excluding Townhomes)
Total Area: 16,372,283 sgft. = 389.63 ac.
Impervious Area .7;562,018 sgft. = 173.60 ac.
Natural Open Space Area: 2,521,005 sgft. = 60.17 ac.
Managed Open Space Area: 8,789,262 sgft. = 155.86 ac.
Estimated Pre-Development TN Loading
Date: 1 /3 012 0 0 8
Computed by: PC
Type of Land Cover Acres TN Export Cceff.
(Ibs/aGyr) TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area 2 7.68 0.6 142.61
Permanently Protected Managed Area 151.95 1.2 182.34
Impervious Surface O.OD 21.2 0.00
ota 5 32 .
Estimated Post-Development TN Loading
Drainage Area I: WETLANDS
Type of Land Cover Acres TN Export Cceff.
(Ibs/aGyr) TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area D DO 0.6 0.00
Permanently Protected Managed Area 8.35 1.2 10.02
Impervious Area 19.77 21.2 419.12
otals 2 .1 4 9.14
Estimated BMP Reduction for Wetlands: 40
Estimated Drainage Area I Nitrogen Loading Reduction: 171.66 Ibstyr
Drainage Area II: WETLANDS
Type of Land Cover Acres TN Export oeff.
(Ibs/aGyr) TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area D.oO 0.6 0.00
Permanently Protected Managed Area 1.16 1.2 1.39
Impervious Area 8.56 21.2 139.07
Totals 7.72 .4
Estimated BMP Reduction for Wetlands 40 %
Estimated Drainage Area II Nitrogen Loading Reduction: 56.19 Ibs/yr
Drainage Area III: WET POND WITH WETLAND FRINGE
Type of Land Cover Acres Ibs/a Oe ' TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area 0 DD 0.6 0.00
Permanently Protected Managed Area 2.97 1.2 3.56
Impervious Area 6.82 21.2 146.70
ota s 1
Estimated BMP Reduction for Wet Pond with Wetland Fringe 30 %
Estimated Drainage Area 111 Nitrogen Loading Reduction: 45.08 Ibs/yr
Drainage Area IV: WET POND WITH WETLAND FRINGE
Type of Land Cover Acres Ibya ce ' TN F~(PORT (Ibs/yr)
Permanently Protected Undisturbed Area 0.00 0.6 0.00
Permanently Protected Managed Area 2.73 1.2 3.28
Impervious Area 15.46 21.2 327.75
Totals 78.19
Estimated BMP Reduction for Wet Pond with Wetland Fdnge 30 %
Estimated Drainage Area IV NlVogen Loading Reduction: 99.31 Ibs/yr
Drainage Area V: WETLANDS
Type of Land Cover Acres ~~ ° TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area 0.00 0.6 0.00
Permanently Protected Managed Area 9.31 1.2 11.17
Impervious Area 33.57 21.2 711.68
otals 4
Estimated BMP Reduction for Wetlands 40 %
Estimated Drainage Area V Nitrogen Loading Reduction: 289.14 Ibs/yr
Nitrogen Control Plan
Commercial /Industrial /Residential Sites with Known Impervious Area
Drelnage Area VI: WETLANDS
Type of Land Cover Acres ~ ~ rJ °e ' TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area 0.00 0.6 0.00
Permanently Protected Managed Area 1.99 1.2 2.39
Impervious Area 6.99 21.2 126.99
Totals .98 1
Estimated BMP Reduction for Wetlands 40
Estimated Drainage Area VI Nitrogen Loading Reduction: 51.75 Ibstyr
Drainage Area VII: WETLANDS
Type of Land Cover Acres I xPO d Oe ' TN EXPORT (Ibstyr)
Permanently Protected Undisturbed Area o 00 0.6 0.00
Permanently Protected Managed Area 9.68 1.2 11.62
Impervious Area 7.92 21.2 167.90
Totals 71.60 1
Estimated BMP Reduction for Wetlands 40 %
Estimated Drainage Area VII Nitrogen Loading Reduction: 71.81 Ibstyr
Drainage Area VIII: BIORETENTION
Type of land Cover Acres Ibs/aG Oe TN EXPORT (Ibstyr)
Permanently Protected Undisturbed Area 0.00 0.6 0.00
Permanently Protected Managed Area 3.6e 1.2 4.42
Impervious Area 3.01 21.2 63.01
ola s o. a
Estimated BMP Reduction for Bioretention 35 %
Estimated Drainage Area VIII Nitrogen Loading Reduction: 23.88 Ibstyr
Drainage Area IX: BIORETENTION
Type of Land Cover Acres Ibyad Oe ' TN EXPORT (Ibstyr)
Permanently Protected Undisturbed Area 0.00 0.6 0.00
Permanently Protected Managed Area 6.58 1.2 7.90
Impervious Area 5.38 21.2 114.06
ota s 1 1
Estimated BMP Reduction for Bioretention 35 %
Estimated Drainage Area IX Nitrogen Loading Reduction: 42.68 Ibstyr
Drainage Area X: WETLANDS
Type of Land Cover Aces ~O °e '
Ibs/arJ r TN EXPORT (Ibstyr)
Permanently Protected Undisturbed Area D.0o 0.6 0.00
Permanently Protected Managed Area 8.10 1.2 9.72
Impervious Area 6.62 21.2 140.34
Totals 14.72
Estimated BMP Reduction for Wetlands 40 %
Estimated Drainage Area X Nitrogen Loading Reduction: 60.03 Ibstyr
Drainage Area XI: WETLANDS
Type of Land Cover Aces Ibs/aG TN EXPORT (Ibstyr)
Permanently Protected Undisturbed Area 0.00 0.6 0.00
Permanently Protected Managed Area 11 89 1.2 14.03
Impervious Area 9.57 21.2 202.88
Totals z1.2ti 1
Estimated BMP Reduction for Wetlands 40 %
Estimated Drainage Area XI Nitrogen Loading Reduction: 86.76 Ibstyr
Nitrogen Control Plan
Commercial /Industrial /Residential Sites with Known Impervious Area
Drainage Area XII: WETLANDS
Type of Land Cover Acres Ib~ac/ Oe ' TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area o 00 0.6 0.00
Permanently Proteced Managed Area 5.55 1.2 7.66
Impervious Area 8.00 21.2 169.60
Totals 14.55
Estimated BMP Reduction for Wetlands 40
Estimated Drainage Area XII Nitrogen Loading Reduction: 70.98 Ibstyr
Drainage Area XIII: WETLANDS
Type of Land Cover Acres Ib~a Oe ' TN EXPORT (Ibs/yr)
Permanently Proleded Undisturbed Area o 00 0.6 0.00
Permanently Protected Managed Area 3.79 1.2 4.55
Impervious Area 7 D3 21.2 149.04
otas tu.dz 1
Estimated BMP Reduction for Wetlands 40
Estimated Drainage Area XIII Nitrogen Loading Reduction: 61.43 Ibstyr
Drainage Area XIV: WETLANDS
Type of Land Cover Acres Ib~ac/ o TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area 0.!)0 0.6 0.00
Pemmanently Protected Managed Area 7 31 1.2 6.77
Impervious Area 13.59 21.2 288.11
otals 2u.9u 2
Estimated BMP Reduction for Wetlands 40
Estimated Drainage Area XIV Nitrogen Loading Reduction: 118.75 Ibstyr
Drainage Area XV: WETLANDS
Type of Land Cover Acres ~O Oe '
Ibs/aG r TN EXPORT (Ibstyr)
Permanently Protected Undisturbed Area D o0 0.6 0.00
Permanently Protected Managed Area 4.29 1.2 5.15
Impervious Area 5.24 21.2 111.09
ola s a.o3 11 .
Estimated BMP Reduction for Wetlands 40
Estimated Drainage Area XV Nitrogen Loading Reduction: 46.49 Ibstyr
Drainage Area XVI: WETLANDS
Type of Land Cover Acres Ib~a Oe ' TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area D o0 0.6 0.00
Permanently Protected Managed Area 3.14 1.2 3.77
Impervious Area 3 e3 21.2 81.20
otals ti.9
Estimated BMP Reduction for Wetlands 40 %
Estimated Drainage Area XVI Nitrogen Loading Reduction: 33.99 Ibstyr
Drainage Area XVII: LEVEL SPREADER
Type of Land Cover Acres (Ibs/a ce TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area o 00 0.6 0.00
Permanently Protected Managed Area o_00 1.2 0.00
Impervious Area 6.93 21.2 146.92
Totals 6.93 146.92
Estimated BMP Reduction for Level Spreader to Stream Buffer: 20
Estimated Drainage Area XVII Nitrogen Loading Reduction: 29.38 Ibstyr
Nitrogen Control Plan
Commercial /Industrial /Residential Sites with Known Impervious Area
Drainage Area XVIII: LEVEL SPREADER
Type of Land Cover Acres TN Export Coeff.
(ibsladyr) TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area 0:00 0.6 0.00
Permanently Protected Managed Area 0:56 1.2 0.67
Impervious Area 4,94 21.2 104.73
Totals 5.50 105.40
Estimated BMP Reduction for Level Spreader to Stream Buffer: 20 %
Estimated Drainage Area XVIII Nitrogen Loading Reduction: 21.08 Ibstyr
Drainage Area XIX: LEVEL SPREADER
Type of Land Cover Acres TN Export Coeff.
(IbslaGyr) TN EXPORT (Ibs/yr)
Permanently Protected Undisturbed Area o oo 0.6 0.00
Permanently Protected Managed Area 0.20 1.2 0.24
Impervious Area 7.47 21.2 158.36
Totals 7.67 158.60
Estimated BMP Reduction for Level Spreader to Stream Buffer: 20 %
Estimated Drainage Area XIX Nitrogen Loading Reduction: 31.72 Ibstyr
Drainage Area XX: UNTREATED
Type of Land Cover Acres TN Export Coeff. TN EXPORT (Ibs/yr)
(Ibs/aGyr)
Permanently Protected Undisturbed Area 60.17 0.6 36.10
Permanently Protected Managed Area 55.60 1.2 66.72
Impervious Area 398 21.2 84.38
Tolais 119.75 187.20
Estimated BMP Reduction: 0 %
Estimated Drainage Area XX Nitrogen Loading Reduction: 0.00 Ibstyr
Total Area: 389.63 Acres
Estimated Protect Pre-BMP TN Export: 4067.05 Ibstyr
Estimated Project BMP TN Removal: 1412.12 Ibstyr
Estimated Project TN Load Rate After BMPs: 6.81 Ibs/aGyr
Estimated Project Composite Nitrogen Loading Rate Reduction: 34.72
Estimated Project Buy Down: 51,065,052.40