Bioretention Inspection and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important inspection and maintenance procedures:
- Immediately after the bioretention cell is established, the plants will be watered
twice weekly if needed until the plants become established (commonly six
weeks).
- Snow, mulch or any other material will NEVER be piled on the surface of the
bioretention cell.
- Heavy equipment will NEVER be driven over the bioretention cell.
- Special care will be taken to prevent sediment from entering the bioretention cell.
- Once a year, a soil test of the soil media will be conducted.
After the bioretention cell is established, I will inspect it once a month and within 24
hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of inspection and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential problems: How I will remediate the problem:
The entire BMP Trash/ debris is present. Remove the trash/ debris.
The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to
bioretention cell erosive gullies have formed. remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the
stone verge or swale applicable). sediment off-site.
The pipe is cracked or Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the Regrade the swale if necessary to
swale (if applicable). smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Stone verge is clogged or Remove sediment and clogged
covered in sediment (if stone and replace with clean stone.
applicable).
Form SW401-Bioretention I&M-Rev.2 Page 1 of 4
BMP element: Potential problems: How I will remediate the problem:
The pretreatment area Flow is bypassing Regrade if necessary to route all
pretreatment area and/or flow to the pretreatment area.
gullies have formed. Restabilize the area after grading.
Sediment has accumulated to Search for the source of the
a depth greater than three sediment and remedy the problem if
inches. possible. Remove the sediment and
restabilize the pretreatment area.
Erosion has occurred. Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present. Remove the weeds, preferably by
hand.
The bioretention cell:
vegetation
Sod is dead, diseased or Determine the source of the
dying. problem: soils, hydrology, disease,
etc. Remedy the problem and
replace sod. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
The bioretention cell:
soils and mulch
Soils and/or mulch are Determine the extent of the clogging
clogged with sediment. - remove and replace either just the
top layers or the entire media as
needed. Dispose of the spoil in an
appropriate off-site location. Use
triple shredded hard wood mulch at
a maximum depth of three inches.
Search for the source of the
sediment and remedy the problem if
possible.
An annual soil test shows that Dolomitic lime shall be applied as
pH has dropped or heavy recommended per the soil test and
metals have accumulated in toxic soils shall be removed,
the soil media. disposed of properly and replaced
with new planting media.
Form SW401-Bioretention I&M-Rev.2 Page 2 of 4
BMP element: Potential problems: How I will remediate the problem:
The underdrain system Clogging has occurred. Wash out the underdrain system.
(if applicable)
The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of
the sediment off-site.
The drop inlet is damaged Repair or replace the drop inlet.
The receiving water Erosion or other signs of Contact the NC Division of Water
damage have occurred at the Quality 401 Oversight Unit at 919-
outlet. 733-1786.
Form SW401-Bioretention I&M-Rev.2 Page 3 of 4
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:r
BMP drainage area number:
Print name: - - K : Out"l iss
Title: &Ssnsns,, • 5, I tat FA.C,11. 1 in Ms. - W C?SS
Address: I S SI R4?,CbG ?.???z,2-? Ri Qw LaI.%, 9C -LT ce t D
Phone: CUR_ U.ell- S'130
Signature: Date: rte 2a • 2oa7
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, fh?n L a Notary Public for the State of
Alp County of 16),4e u , do hereby certify that
i-A' k c Bar, ?'s_ personally appeared before me this .:?D
day of Lo.,-,tb?,- , )c -7 , and acknowledge. the due execution of the
forgoing bioretention maintenance requirements. Witness my hand and official seal,
0
y ,VE „/y Na "...'
SEAL
My commission expires
Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
Stormwater Wetland Inspection and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
- Immediately after the stormwater wetland is established, the wetland plants will
be watered twice weekly if needed until the plants become established
(commonly six weeks).
- No portion of the stormwater wetland will be fertilized after the first initial
fertilization that is required to establish the wetland plants.
- Stable groundcover will be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
- Once a year, a dam safety expert will inspect the embankment.
After the wet detention pond is established, I will inspect it once a month and within 24
hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of inspection and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential problem: How I will remediate the problem:
The entire BMP Trash/ debris is present. Remove the trash/ debris.
The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to
wetland erosive gullies have formed. remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too Maintain vegetation at a height of
long. approximate) six inches.
The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the
swale applicable). sediment off-site.
The pipe is cracked or Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the Regrade the Swale if necessary to
swale (if applicable). smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Form SW401-Wetland I&M-Rev.2 Page 1 of 4
BMP element: Potential problem: How I will remediate the problem:
The forebay Sediment has accumulated in Search for the source of the
the forebay to a depth that sediment and remedy the problem if
inhibits the forebay from possible. Remove the sediment and
functioning well. dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred. Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present. Remove the weeds, preferably by
hand. If a pesticide is used, wipe it
on the plants rather than spraying.
The deep pool, shallow Algal growth covers over Consult a professional to remove
water and shallow land 50% of the deep pool and and control the algal growth.
areas shallow water areas.
Cattails, phragmites or other Remove the plants by wiping them
invasive plants cover 50% of with pesticide (do not spray) -
the deep pool and shallow consult a professional.
water areas.
Shallow land remains flooded Unclog the outlet device
more than 5 days after a immediately.
storm event.
Plants are dead, diseased or Determine the source of the
dying. problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Best professional practices Prune according to best professional
show that pruning is needed practices.
to maintain optimal plant
health.
Sediment has accumulated Search for the source of the
and reduced the depth to 75% sediment and remedy the problem if
of the original design depth possible. Remove the sediment and
of the deep pools. dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Form SW401-Wetland I&M-Rev.2 Page 2 of 4
BMP element: Potential problem: How I will remediate the problem:
The embankment A tree has started to grow on Consult a dam safety specialist to
the embankment. remove the tree.
An annual inspection by an Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
Evidence of muskrat or Use traps to remove muskrats and
beaver activity is present. consult a professional to remove
beavers.
The micropool Sediment has accumulated Search for the source of the
and reduced the depth to 75% sediment and remedy the problem if
of the original design depth. possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Plants are growing in the Remove the plants, preferably by
micropool. hand. If a pesticide is used, wipe it
on the plants rather than spraying.
The outlet device Clogging has occurred. Clean out the outlet device. Dispose
of the sediment off-site.
The outlet device is damaged Repair or replace the outlet device.
The receiving water Erosion or other signs of Contact the NC Division of Water
damage have occurred at the Quality 401 Oversight Unit at 919-
outlet. 733-1786.
Form SW401-Wetland I&M-Rev.2 Page 3 of 4
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:
BMP drainage area number:
Print name: M %Kt. -O U Vz l2lS!P
?kci ?.? cZ?S - ? G1A5S
Title: A 3s? aT suer.
Address: i551 Rcetc Qv?t-,?e„2?c a 9,4 ?.? LqC 2I(a1.o
Phone: click- (0(8.(A-S-730
Signature:
Date: i2. 2a • 7,007
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, nr, L a Notary Public for the State of
County of icjG. ?t_f , do hereby certify that
l?G urr s s personally appeared before me this oZ 0
day of 1kuenl"er , ?2c)p-7, and acknowledge the due execution of the
forgoing stormwater wetland maintenance requirements. Witness my hand and official
seal,
..
• ms's., Cie ?1G
SEAL
My commission expires ? X1--;10 10
Form SW401-Wetland 1&M-Rev.2 Page 4 Of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number: 13
Stormw!ater Wetland Inspection and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
- Immediately after the stormwater wetland is established, the wetland plants will
be watered twice weekly if needed until the plants become established
(commonly six weeks).
- No portion of the stormwater wetland will be fertilized after the first initial
fertilization that is required to establish the wetland plants.
- Stable groundcover will be maintained in the drainage area to reduce the
sedimont load to the wet detention basin.
- Once a, year, a dam safety expert will inspect the embankment.
After the wet detention pond is established, I will inspect it once a month and within 24
hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Rec rds of inspection and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential problem: How I will remediate the problem:
The entire B MP Trash/debris is present. Remove the trash/ debris.
The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to
wetland erosive gullies have formed. remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too Maintain vegetation at a height of
long. approximately six inches.
The inlet devi e: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the
swale applicable). sediment off-site.
The pipe is cracked or Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the Regrade the Swale if necessary to
swale (if applicable). smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Form SW401-Wehtland I&M-Rev.2 Page 1 of 4
BMP element: Potential problem: How I will remediate the problem:
The forebay Sediment has accumulated in Search for the source of the
the forebay to a depth that sediment and remedy the problem if
inhibits the forebay from possible. Remove the sediment and
functioning well. dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred. Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present. Remove the weeds, preferably by
hand. If a pesticide is used, wipe it
on the plants rather than spraying.
The deep pool, shallow Algal growth covers over Consult a professional to remove
water and shallow land 50% of the deep pool and and control the algal growth.
areas shallow water areas.
Cattails, phragmites or other Remove the plants by wiping them
invasive plants cover 50% of with pesticide (do not spray) -
the deep pool and shallow consult a professional.
water areas.
Shallow land remains flooded Unclog the outlet device
more than 5 days after a immediately.
storm event.
Plants are dead, diseased or Determine the source of the
dying. problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Best professional practices Prune according to best professional
show that pruning is needed practices.
to maintain optimal plant
health.
Sediment has accumulated Search for the source of the
and reduced the depth to 75% sediment and remedy the problem if
of the original design depth possible. Remove the sediment and
of the deep pools. dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Fonn SW401-Wetland I&M-Rev.2 Page 2 of 4
BMP element: Potential problem: How I will remediate the problem:
The embankment A tree has started to grow on Consult a dam safety specialist to
the embankment. remove the tree.
An annual inspection by an Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
Evidence of muskrat or Use traps to remove muskrats and
beaver activity is present. consult a professional to remove
beavers.
The micropool Sediment has accumulated Search for the source of the
and reduced the depth to 75% sediment and remedy the problem if
of the original design depth. possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Plants are growing in the Remove the plants, preferably by
micropool. hand. If a pesticide is used, wipe it
on the plants rather than spraying.
The outlet device Clogging has occurred. Clean out the outlet device. Dispose
of the sediment off-site.
The outlet device is damaged Repair or replace the outlet device.
The receiving water Erosion or other signs of Contact the NC Division of Water
damage have occurred at the Quality 401 Oversight Unit at 919-
outlet. 733-1786.
Form SW401-Wetland I&M-Rev.2 Page 3 of 4
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:
BMP drainage area number:
Print name: !' I tKL 04i2 rL13S
Title: A SSVST 4T' 6,4OA: F/ !U%.tTt ES \9G10615
Address: (991 20c,K QY;Rtitbc-L ?Rdt_Cr't -A4 , N Q- Z? (e tQ
Phone: gig- Cec.2,^'ttl'C
Signature:
Date: 1-Z . Zo. -Zo0
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, n L . r ,-7 ¢?? , a Notary Public for the State of
(?cr i t1 ?Ln>I, nct? , County of do hereby certify that
M, j-U ?>'L"', personally appeared before me this ?Q
day of 7 , and acknowledge the due execution of the
forgoing stormwater wetland maintenance requirements. Witness my hand and official
seal,
z
•?`??F??Cr? ..
SEAL
My commission expires a / a-7 ?-Zz C) 10
Form SW401-Wetland I&M-Rev.2 Page 4 of 4