HomeMy WebLinkAbout20080293 Ver 1_Acceptance Letter_20080213O~O~ W ~ ~F~pG
r
~ ~
n "'~"
February 13, 2008
EXPRESS REVIEW ACCEPTANCE LETTER
Rollingview Marina & Rec. Facilities Partnership
Attn: Mr. Andy Gooch
3490 Falls Lake Road
Durham, NC 27703
Project Name: Rollingview Marina - 2008 Expansion
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
Durham County
On February 5, 2008, the 401 Oversight/Express Permitting Unit of the Division of Water Quality received a
request from Mr. Macon Gooch III, regarding a project known as "Rollingview Marina - 2008 Expansion" for
acceptance into the Express Review Program. A site visit was conducted by Lia Myott and Joseph Gyamfi on
February 11, 2008. This letter advises you that your project will be accepted into the Express Review Program
once the following items are received:
1) The application fee of $3,000.00 [for 401 Water Quality Certification with minor impacts ($1,000) +
Riparian Buffer Authorization ($2,000)], made payable to the North Carolina Division of Water Quality];
2) One (1) copy of the completed PCN Addendum
(http://h2o.enrstate.nc.us/ncwetlands/documents/MicrosoftWord-
PCN Addendum 10 Ol 06 OOO.pdf); and
3) Five (5) complete and collated copies of the PCN Application and supporting documentation -see PCN
Addendum (instead of providing 5 copies of the full size plans you may provide two copies of the full size
plans along with three copies of the 11 X 17);
4) Three (3) copies of all supporting stormwater information pertaining to this project including
a. Entire site development/layout plans delineating all drainage areas;
b. Design calculation sheets for all proposed BMP(s) sized for both on-site and off-site drainage;
c. BMP supplements for each proposed BMP and Required Items Check List (available at
http://h2o.enr.state.nc.us/su/bmp forms.htm) along with all required items (this includes one (1)
original and two (2) copies of notarized Inspection & Maintenance Agreement for the stormwater
management facilities.); and
d. Detailed construction drawing sheets shall include the following:
i. Erosion and sediment control plans (to be approved by the Division of Land Resources),
ii. Installation and Planting schedules for the proposed BMPs.
5) One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale or color). If the
plans are too large to store in TIFF format, they can be stored in PDF.
Additionally, apre-application meeting; (to include the property owner) is required prior to the submittal of your
completed application package. The clock for this project will not start until receipt of the completed application
package and required fee are received. If the impacts are greater than indicated on the Initial Interest Form and/or
the services are different, you may be required to remit an additional fee. If you have any questions or wish to
discuss these matters further please do not hesitate to call Lia Myott at 919-733-9502.
401 Oversight I Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-17861 FAX 919-733-68931 Internet: httn://h2o.enr.state.nc.us/ncwetlands
Noe Carolina
~tura!!y
An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper
Sincerely,
Cyndi Karoly, Supervisor
401/Express Review Oversite Unit
CBK/lem
cc: File copy
Macon Gooch III, Building Consultants Inc., 629 Airport Rd, Ste. A, Lawrenceville, GA 30045