Loading...
HomeMy WebLinkAbout20061376 Ver 1_Worksheets_20060928Project Name: Novartis Project No. DWQ 061376 Pond 1 SUBMITTED DESIGN: elevations Bottom of Basin (ft) 308 Permanent Pool (ft) 314 Temporary Pool (ft) 316.75 areas Permanent Pool SA (sq ft) 18988 Drainage Area (ac) 26.2 Impervious Area (ac) 17 volumes Permanent Pool (cu ft) 110675 Temporary Pool (cu ft) 62803 Forebay (cu ft) 20934 other parameters SA/DA 1.65 Orifice Diameter (in) 4 Design Rainfall (in) 1 Linear Interpolation of Correct SA/DA * * * % Impervious Next Lowest 60 Project Impervious 64.9 Next Highest 70 00Dai . 0 k-- ell/ z el 6 6 REQUIRED DESIGN: 5.8 average depth status 6 ft. depth ok 2.75 ft. depth ok 18794 sq. ft. ok 6017 based on avg depth ok 64.9 % - 60294 cu. ft. ok 18.9 % ok 1.65 - 0.49 cfs drawdown - 1.5 day drawdown check (raw(, 614- 6 ft. Permanent Pool Depth SA/DA fron (Avg. Depth) 1.51 0.293667053 1.08 1.65 0,53 1.25 1.79 0.771674742 1.43 3 ft 4