Loading...
HomeMy WebLinkAboutNCG140035 DMR SW (3)STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG14� ) 6 FACILITY NAME: 1012,19N PERSON COLLECTING&AMALES ? CERTIFIED LABORATORY L' `t Lab # &57/ Lab # OPTIONAL 1N FO: i SAMPLE COLLECTION YEAR: SAMPLING PERIOD: ❑ July -December January -June COUNTY lee PHONE NO'(—I&) ADD TO LISTSERVE? ❑YES ❑NO EMAIL: DISCHARGING TO CLASS: DSA ❑HQW ❑PNA []Trout ❑Other Part A: Stormwater Monitoring Requirements Date Sample PH Collected Standard TSS Outfall No. { (mo/dd/yr OR Units) (mg/L) NO FLOW) Event Duration (minutes] Total a Rainfall {in) In Tier 2 Monthly # of Months in Tier Monitoring. 2 Sampling's i (y/n) /} i L....., nl_y —nlio giro to marlr tho camnle period above. 'If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW or --NO Ui?ldlAKUt TUI edl-n vuuon -• - .- •••-••- -••- ---- 2 If a value is In excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 'TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. Last Revised 7/13/11 Permit Date: 7/1/2011-60/30/2015 I Page 1 of 2