HomeMy WebLinkAboutNCG210078 DMR SW (15)Semi-annual Stormwater Discharge Monitoring Report
for North Carolina DEMLR General Permit No. NCG210000
Date submitted 1-- ZIP _` (.
CERTIFICATE OF COVERAGE NO. NCG210078
FACILITY NAME West Fraser Lumber Mill
COUNTY Northampton
PERSON COLLECTING SAMPLES
LABORATORYTestAmerica Lab Cert. #387
Comments on sample collection or analysis:
SAMPLE COLLECTION YEAR 2-A) G
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ❑ Monthly' month
DISCHARGING TO CLASS ❑ORW [:]HQ ❑Trout ❑PNA
❑Zero -flow [:]Watersupply [:]SA
[:]Other
—
PLEASE REMEMBER TO SIGN ON THE REVERSE 4
Part A: Stormwater Benchmarks and Monitoring Results (Monitoring is required only if the facility stores exposed accumulations of sawdust, wood chips,
bark, mulch, or other similar material.on site for longer than seven (7) days.)
&A -,I -7-CA-1Ifr—or�-- �'�o�p ��o�1,1- IJ No discharge this period?z
Outfall No. ,
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches 3
Chemical Oxygen Demand
Total Suspended Solids
Benchmarks =__>
_
-
120 mg/L
100 mg/L or 50 mg/L4
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -
numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the
detection limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 8/1/2013-7/31/2018 SWU-245, last revised 7/31/2013 . ; -
Page 1 of 2 =v
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected)
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G by EPA
1664 (SGT -HEM)
Total Suspended Solids
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L4
Footnotes from Part A also apply to this Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(SignatuiVof Permittee)
t
Permit Date: 8/1/2013-7/31/2018
(Date)
-9- q-16,
SWU-245, last revised 7/31/2013
Page 2 of 2
West
March 8, 2016
Raleigh Regional Office
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
4400 NC Hwy 186E
P.O Box 459
Seaboard NC 27876
RECEP
MAR 212�___: - Frasimmm
DWR SECTION!
From: West Fraser, Inc.
Certificate Coverage No. AN -400' "
Subject: Monthly Stormwater Discharge Monitoring Report
Dear Sir or Madam:
Enclosed are the original and one copy of the West Fraser Seaboard Lumber Mill Monthly Sampling
for 04tfa110,01. Outfall 00 1 stormwater comingles with stormwater and process water from the
Carolina Bark facility before discharging from outfall 001. No sample was collected during this
reporting period because sampling criteria were not met.
If additional information is needed, please contact James Barham, EHS Supervisor at (252) 589-8265
or email james.barham @wetsfraser.com.
Sincerely,
ly
"Jame; Barham
Environmental, Health and Safety Supervisor
West Fraser, Inc.
Seaboard Lumber Mill