HomeMy WebLinkAbout20072233 Ver 1_Approval Letter_20080207Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
February 7, 2008
Perry Grandchildren, LLC.
P.O. Drawer 1475
Kinston, NC 28503
Coleen H. Sullins, Director
Division of Water Quality
Chuck Wakild, P.E., Deputy Director
Division of Water Quality
DWQ Project # 07-2233
Lenoir County
Subject Property: Tull/Wooten Farm Boat Ramp
Neuse Basin, Neuse River, 030405, 27-(75.7), C, NSW
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse
River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions
To Whom It May Concern:
You have our approval, in accordance with the attached conditions and those listed below, to
place fill within or otherwise impact 550 square feet of streams and 350 square feet (ft2) of
protected riparian buffers for the purpose of constructing a boat ramp at the subject property, as
described within your application dated December 19, 2007 and received by the N.C. Division of
Water Quality (DWQ) on December 20, 2007. After reviewing your application, we have
decided that the impacts are covered by General Water Quality Certification Number(s) 3687
(GC3687). The Certification(s) allows you to use Nationwide Permit(s) 36 when issued by the
US Army Corps of Engineers (USAGE). This letter shall also act as your approved
Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0233.
In addition, you should obtain or otherwise comply with any other required federal, state or local
permits before you go ahead with your project including (but not limited to) Erosion and
Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application shall
expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 1501inear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
North Carolina Division of Water Quality Internet: h2o.enr.state.nc:us
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 2'7889 FAX 252-946-9215
An Equal Opportunity(AffirmativeRction Employer - 50% Recycled110% Post Consumer Paper
NorthCarolina
~aturallr~
Applicant:
Page 2 of 4
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount Approved
(Units) Plan Location or Reference
Stream 550 (s uare feet Plat rovided with a lication
404/CAMA Wetlands na (acres) na
Waters na (acres) na
Buffers 350 s uare ft. Plat rovided with a lication
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion
control measures must be such that they equal, or exceed, the requirements specified
in the most recent version of the North Carolina Sediment and Erosion Control
Manual. The devices shall be maintained on all construction sites, borrow sites, and
waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre-Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the
maximum extent practicable. If placement of sediment and erosion control devices in
Applicant:
Page 3 of 4
wetlands and waters is unavoidable, they shall be removed and the natural grade restored
within six months of the date that the Division of Land Resources has released the project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to return
the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-
1650.
6. No Impacts Beyond those in Application
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre-construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
7. Buffer Replanting
Replanting of vegetation within disturbed areas located within 30 feet of the shoreline or
coastal wetland (whichever is more landward) associated with boat ramp installation must be
done in an "in kind" manner immediately following construction. (Example: Disturbed areas
with pre-existing grassed lawns must be replanted with grass. Disturbed areas with pre-
existing trees or woody vegetation must be replanted with trees and woody vegetation.
Disturbed areas with pre-existing forest vegetation must be replanted with forest vegetation
including at least two different native hardwood tree species at a density sufficient to provide
320 trees per acre at maturity. This density can usually be achieved by planting approximately
436 (10 x 10 spacing) to 681 (8 x 8 spacing) trees per acre.)
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by this
Certification, shall expire upon expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved
wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60
days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the
approved buffer impacts) shall be referred in writing to the Director for a decision. The
Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B.
Applicant:
Page 4 of 4
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone Kyle Barnes of the Washington
Regional Office at 252-948-3917 or Ian McMillan of the 401 Oversight/Express Unit at 919-
715-4631.
Sincerely,
`-. ~--
Al Hodge u ervisor
Division of Water Quality
Surface Water Protection
Washington Regional Office
Enclosures: Certificate of Completion
GC 3687
cc: Corps of Engineers Washington Field Office
DWQ 401 Oversight/Express Unit
File copy
Central Files
Filename: 07-2233