Loading...
HomeMy WebLinkAbout20061631 Ver 1_Triage Comments_20061025. ,. _ _ DWQ#i ~~-•~1L~tQ ~r ~ ~~ - Date l U , L ,f7 G ~ _ _ Who Reviewed: -~v~/l~ /~2~ i ~ Plan Detail7ncompiete - [] Please provide a location map for the project. ' Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. ^. Please show all wetland impacts including fill slopes o((n the site plan. ~ • Please indicate all buffer impacts on the site plan. ~I/l,~ ~~~ •~ • Please indicate proposed lot layout as overlays on the site plan. ~~ • Please indicate the location of the protected buffers as ,overlays oa the site plan. ^ Please locate all isolated or non-isolated wetlands, streams and other waters of the Stato as overlays on the site plan. Please provide cross section dotails showing tho provisions for aquatic life passages ' ^ Pleaso locato any planned•sewer lines on the site plan. • Plesso provide fhe location of any proposed stormwater management practices as by C3C ' radices as b GC~x~ I~- ~ ~ ~. Ro~j ~y~, W~ J~ Ploase provide detail for the atormwater management p required y ~ ~~ ~~ ~ ~~ ~~ e~ ~ ~`~- ~~ w ~~ ~ easo ~~j b e nth time d built , s: ~ b~ ~~ ~ Please indicate all stormwatei o~}tfalls on the site pltul. d . ~ cJ~/~ Please indicate the difl3.tse flow provision measures on the site plan. ~ ~, lS% ~ (~ . ^ Please indicate whether or not the proposed impacts akeady been conducted. • • r~ _ Avoidance,~nd/or Minimization Not Provided Vv ^ • 'Ilia labeled as on the plena does not appear to be necessary. Pleaso eliminate the . or provide additional information as to why it is nocessary far this project.. • ^ This Office beliexrea that the labeled on the plans as ~ can be moved, or reconfigured to avoid the impacts to the • . Please revise the plans to avoid the impacts. • . ` ^. This Office believ6s that tho •labeled on the plans as can be moved or reconfigured to.;minimize tho impacts to'the • . Please rovise the plans to minimize tho impacts. ^ The stormwater discharges at tho location on tho plans labored will.not provide diffjise flow through the buffer because • Please revise the plans and provid4 calculations to show that difluse flow will bo achioved through the entirebuffer. If it is not possible to achievadiffuse flow through.the entire buffor then it may bo necessary to' provide stormwatrr management • practices that remove nutrients bcforo the stormwatea~ can be discharged through the buffer. _ , Other i • . ^•. The application fee was insuffieient~because over 1S0 feet of stream and/or over 1 acre of wetland'impacts were requested. Please provide $ ~ .This additional fee must be received before your application can be reviowed. • ^ Please complete Section(s) on the application. ~ •~ ~ . • ^ Pleaso provide a signed copy of the application.' ^ Please provide .copies of the application, . copies of fine site plans and other supporting information: . _ ^ • Please submit electronic CAD files showittg ;.via email to ian.mcmillanQncmail.net and CD: Mitigation . • • ^ of compensatory mitigation is required for this project. ~ Please provide~e compensatory mitigation plan.. The plan must conform to the.requirementa in 15 A NCAC 2H •.0500 and must be appropriate to the typaof impacts proposed. • ^ Please indicate which-404 Pormit the USACE would use to authorize this project. ~ ~' ~ /~S ~ ~~•. t / ~~ ~J ~~7p~ ~2 , ~(~"~ Gar " ~ ~r.z.,/~r~, ~~; ,~