HomeMy WebLinkAboutNCG030063 DMR SW (13)0
January 4, 2016
I ; r
'Y,ti a ' • �' , a
JAN 11 2016
CENTRAL FILES
DWR SECTION
Division of Water Quality
Attention: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Re: NDPES Permit No. NGG030063 -
GE Mebane Equipment Plant
Dear Sir or Madam:
GE Energy Management
Industrial Solutions
Michael A. Roux
Environmental, Health & Safety Manager
6801 Industrial Drive
Mebane, North Carolina, 27302
USA
T 919 563 7224
C 207 376 6368
Michael Roux@ge com
Per our NPDES Stormwater Permit NCG030063, GE Mebane collected the required benchmark samples
from our facility outfalls on December 17, 2015. The following documents are enclosed:
1. Stormwater Discharge Monitoring Report
2 2nd Copy of Discharge Monitoring Report
3. Lab Results from Sampling (Meritech, Inc.)
In accordance with our NPDES Stormwater Permit, GE Mebane is notifying the Division of Water Quality
of benchmark value exceedances for zinc, copper, and TSS. Outfall 002, 003, and 004 had repeat
benchmark exceedances for zinc. Outfalls 002, 003, 004, and 006 had repeat benchmark exceedances
for copper. Outfalls 001 and 002 were both high for Total Suspended Solids (TSS). This was a heavy
and significant rainfall event.
if you have any questions about this report, please contact me at (919) 563-7224.
Sincerely,
Michael A. Roux
Environmental, Health & Safety Manager
Attachments
Appropriate Legal Entity
Semi-annual Stormwater ®is,..iarge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted
CERTIFICATE OF COVERAGE NO. NCG03 o O C-, 3 SAMPLE COLLECTION YEAR
FACILITY NAME GE M,.bavw— SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Q ,nQ e- or ❑( Monthly'_'>zcemkse-v-- (month)
PERSON COLLECTING SA VIPLES Nie,�V;vt G -L4 DISCHARGING TO CLASS ❑ORW ❑HQW [_-]Trout❑PNA
LABORATORYM�Yi t'2c.�no t -c Lab Cert. # /�� ❑Zero -flow [:]watersupply [:]SA
Comments on sample collection or analysis: []Other
Part A: Stormwater Benchmarks and Monitoring Results
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
F-1 No disrhnrnP this nPrinrl?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks =__>
_
-
100 mg/L or 50 mg/L4
6.0-9.0
0.007 mg/L
0.033 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
12/1-711.7-
q
In r4 1-
7. S
0,00AI
e, 0,0/4
< 0,010
< 5, M91L.
--
.
12
0 yn L
7.�
0. 011Y
--00.010
0.11.1
<�,�
/A'/1 41/ 5
/"LIq
66. m /-
7.8
o,®o11
00,010
0,135,
<5 L
00
/a I7 1S
r, qq
I 10 L
.7
0.00
<0,010
0,/05-
<.6 r4c.
. qq
7,6
O, 067
1 < o .010
1 0. ®5
2 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the safne outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Semi-annual Stormwater Dis_.iarge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted
CERTIFICATE OF COVERAGE NO. NCG03 0 Q 3
FACILITY NAME GC Mebokvxe.
COUNTY �rwenae.
PERSON COLLECTING SAMPLES _ P/a�lyin Com' tLy►y�
LABORATORY Merjke�, Lab Cert. # 1(o,5"
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR -.(is-
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' 7DegemLer (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
❑Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?z
Outfall No.
Date Sample
1
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks ===>
-
-
100 mg/L or 50 mg/L4
6.0-9.0
0.007 mg/L
0.033 mg/!_
0.067 m L
15 mg/L
1 mg/L
00
_01 15"
1 • z1q
S:n L_
-7.1
0 - 00CJ
<0.010
0,0600
e 5 M L
®•
v07
4117
1.
3 M4
0.006
<0.010
0.03
< 5"K_9 L
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
i
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the Generali
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics!
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Mz.60-ne_l�eet-
Title (Print title)
sl r
�,'��Ignatu (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, thev must be reported in the format "<XX mg/L" where XX is the numerical value of the detectio
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
n No dhr'harnP this narinrl22
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,-
'Inches3
Non -polar O&G/TPH by
.EPA 1664 (SGT -HEM)
Total Suspended Solids
pH
Benchmarks'===>
_'
-
15"mg/L
100 mg/L or 50 mg/L*
6.0 —,9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date ^41�1/2012-10/31/2017 SWU-245, last revised 10/.;w,'2012
Page 2 of 3 ��'
Note: If yoL, . _port a sample value in excess of the benchmark, you must implel. it Tier 1, Tier z, or Tier 3 responses. See General Permit text.
FOR PART AND PART B MONITORING RESULTS•
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES g NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑X NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "'No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
/ ' ��I_
(Date)
Permit Date 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3