hdrinc.com
June 1, 2016
Mr. John N. Policarpo Ms. Jennifer Burdette
U.S. Army Corps of Engineers N.0 Division of Water Resources
Wilmington District 401 & Buffer Permitting Unit
Subject: Request for Additional Information (DWR #16-0482)
Nationwide No. 121 General Water Quality Certification No. 3884
CFPUA Blue Clay Road Force Main Project
New Hanover County, North Carolina
To Whom It May Concern:
On May 16, 2016, the Division of Water Resources (Division) requested additional information concerning the proposed
construction activities associated with the proposed Blue Clay Road Force Main PCN. A PCN package was received by
the Division on May 10, 2016 and the application was put on hold pending payment of an application fee.
The original PCN application stated impacts to wetland 3 are "permanent" impacts. This impact is the conversion of a
forested (PFO) wetland to an emergent (PEM) wetland; while the USACE classifies these as permanent impacts, the
Division classifies them as temporary. Per coordination with Ms. Sheri Montalvo and Mr. Chad Coburn of the Division, we
have clarified that this impact is being re-classified as temporary and no fee payment to the Division is needed to process
the application. A revised page 4 of the PCN application is enclosed.
Per communication with Mr. Policarpo, CFPUA has decided to use Blue Clay Road to access both sides of the pipe
during construction rather than creating temporary ford style crossings at intermittent and perennial stream crossings (S1,
S2, S3), thereby minimizing impact to these streams. Attached are replacement detail sheets (00C-14, OOC-15) for the
stream crossings, which include a pump around detail. Thank you very much for your timely review of these materials,
and please feel free to contact us with any additional questions.
Respectfully,
HDR Engineering, Inc. of the Carolinas
Jessica Tisdale
Environmental Scientist
Attachments: Page 4 of PCN Application
Project Plans (updated detail sheets)
Cc: Jamison Fair, AICP— CFPUA Project Manager
Eric Williams, PE - HDR
Randy Plummer, PE - HDR
555 Fayetteville St., Suite 900, Raleigh NC 27601
T 919.232.6654 F 919.785.1187
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑X Wetlands Strea X — tributaries Buffers Open \❑ters P❑d Construction ❑
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 T
Non -Tidal Freshwater Marsh
No
Corps
0.03
W2 T
Hardwood Flat
Yes/No
Corps
0.05
W3 T
Non -Tidal Freshwater Marsh
Yes/No
Corps
0.56
W4 -
W5
W6
2g. Total Wetland Impacts:
0.64
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 T
Open Cut (Trenching)
Ut to Prince George Crk
PER
DWQ/Corps
6
13
S2 T
Open Cut (Trenching)
Ut to Prince George Crk
INT
DWQ/Corps
2
20
S3 T
Open Cut (Trenching)
Ut to Prince George Crk
PER
DWQ/Corps
8
16
S4 T
Open Cut (Trenching)
Ut to Prince George Crk
PER
DWQ/Corps
10
5
S5
S6
3h. Total stream and tributary impacts
54
3i. Comments:
Page 4 of 10
PCN Form — Version 1.4 January 2009
1 I 2 I 3 I 4 I 5 I 6 I 7 I 8
1
Sp
IVF r
' } S All
4 GALVANIZED WOVEN
WIRE FIELD FENCE,
14 GAUGE, WITH 6'
MAXIMUM VERTICAL
STAY SPACING
O
NOTE:
ELEVATION A IS NOT HIGHER
THAN ELEVATION B
ELEVATION
1
CHECK
DAM, TYPICAL
8" DOWN AND 4" HORIZONTAL
AND THEN BACKFILLED WITH
EARTH AND COMPACTED. }.
2. POSTS TO BE MIN. OF
2'-0" IN GROUND.
3. BRACE POSTS WHERE
NECESSARY.
4. ATTACH FABRIC WIRE AND
POSTS WITH METAL RUNGS
ON PLASTIC ZIP TIES (50 LB
MIN. TENSILE)
5. POST SHALL BE 5' (MIN.) METAL POST
WEIGHING A MIN. 1.33 LB PER LF,
MANUFACTURED WITH CLIPS.
6. WATER SHALL NOT BE IMPOUNDED TO A
DEPTH GREATER THAN 1.5 FT AT ANY POINT
ALONG FENCE. CONTRACTOR SHALL INSTALL A
FENCE IMPOUNDMENT OUTLET, SEE DETAILS.
SILT FENCE DETAIL
NOT TO SCALE
V IYI11 Y.
TEMPORARY GRAVEL CONSTRUCTION
ENTRANCE DETAIL
NOT TO SCALE
HDR Engineering, Inc.
of the Carolinas
N.C.B.E.LS. UJ nse Number. F-0116
17804 Chandlers Lane l Sunset Beach, NC 28468
SEDIMENT
CONTROL
1' THICK
EXISTING
GRADE -7
FILTER FABRIC
NO. 5 OR NO. 57
SEDIMENT CONTROL
STONE. 12" THICK LAYER
ON UPSTREAM FACE —
PLAN
z
01
C�
C .FJ
SECTION B—B
1.5' MIN
b
24" MAX. STONE
DEPTH AT CENTER OF
CHANNEL FLOWLINE
1'-6" �-- CLASS B RIP RAP
EXISTING GROUND
2 24" MAX. STONE
j DEPTH AT CENTER OF
CHANNEL FLOWLINE
FILTER FABRIC 4' TO 6' WIDTH, U.N.O.
SECTION C—C
STONE CHECK DAM DETAIL
NOT TO SCALE
NOTE:
4 STRUCTURAL STONE SHALL BE
(CLASS ~B") STONE FOR EROSION
CONTROL PURPOSES.
SEDIMENT CONTROL STONE SHALL
BE NO. 5 OR NO. 57 STONE.
ENCE
:• •
FENCE IMPOUNDM
NOT TO SCALE
2
DETAIL /75
NC DOT #57
COURSE AGGREG
STILLING BASIN OR
SEDIMENT BAG
NC DOT #57
COURSE
AGGREGATE -
ON POINT
v N
_I
ROCK PIF
NOT TO SCALE
SITE
DIA)
3
L STONE
3'-0" MIN NC DOT CLASS B
EROSION CONTROL STONE
z_
ROADWAY
N SHOULDER
8' MIN.
SECTION
STREAM DIVERSION
(PUMPS
r DISCHARGE HOSES ii
P INTAKE HOSE
` P DEWATERING PUMP
AIL
ua�»aaua���
PIPE (SIZE AS INDICATED
ON DRAWINGS)
3
4—
IMPERVIOUS SHEETING
E. WILLIAMS, PE
''w`vnvaavrvr
,•�•O�j� C.... ,••
ES' SIO •.
F124-34
F '•••••-�•' C��' s
W1�-��P
BLUE CLAY ROAD
FORCE MAIN
Cape Fear
Cape Fear Public Utility Authority
Public Utilit y authority �w�
Stewardship. Sustainability. Service. Wilmington, NC
FLOW
— —
INTAKE HOSE
/ FLOW BASE FLOW + 1
i �— WORK AREA FOOT (2 FOOT
T. LEWIS, PE
SEDIMENT DIKE CLEAN WATER DIKE SUMP—HOLE OR " A i /[ / /- MINIMUM)
DRAWN BY
... ... ..
... ... . .. ..
POOL (12~ TO 18" CROSS SECTION OF
WORK AREA
DEEP 2' DIA.) SANDBAG DIKE
PUMPS SHOULD DISCHARGE LENGTH NOT TO
ONTO
A STABILIZED BANK OR EXCEED THAT WHICH SECTION A—A
REVISIONS PER ENVIRON. REGULATORY COMMENTS
DISSIPATER (MADE OF RIP CAN BE COMPLETED IN
RAP,
SANDBAGS, OR OTHER ONE DAY
REGULATORY REVIEW
APPROVED
MATERIAL) PLAN VIEW
I ISSUE
GENERAL NOTES:
DESCRIPTION
1.
THE CONTRACTOR IS TO PROTECT THE WORK AREA FROM STREAM FLOWS RESULTING FROM ALL
STORMS UP TO AND INCLUDING THE 1 -YEAR EVENT. THE ENGINEER WILL PROVIDE FLOW RATES.
2.
INSTALL PUMP AND TEMPORARY FLEXIBLE HOSE AT THE UPSTREAM END OF CONSTRUCTION AREA.
3.
INSTALL STILLING BASIN OR EQUIP FLEXIBLE HOSE WITH THE SEDIMENT BAG IF NEEDED. STABILIZE
PIPE OUTLET TO PROTECT BANK AGAINST SCOUR AND EROSION.
4.
PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING FOR THE STREAM DIVERSION. CONTRACTOR
HAS THE OPTION OF USING INFLATABLE CHECK DAMS IN LIEU OF SANDBAGS.
5.
PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS. DEWATER THE WORK AREA INTO THE
STILLING BASIN OR EQUIP HOSE WITH THE SEDIMENT BAG. DEWATERED AREA SHALL EQUAL TO ONE
DAY'S WORK.
6.
PERFORM WORK ACCORDING TO PLANS.
7.
REMOVE ANY ACCUMULATED SILT BEFORE REMOVAL OF IMPERVIOUS DIKES. REMOVE ALL EQUIPMENT
INCLUDING DIKES. (DOWNSTREAM IMPERVIOUS DIKE FIRST).
8.
ALL GRADING AND STABILIZATION MUST BE COMPLETED IN ONE DAY WITHIN THE PUMP -AROUND AREA
:NCE
(WITHIN THE IMPERVIOUS DIKES). IMPERVIOUS DIKES ARE TO BE REMOVED AT END OF DAY. THE
CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION OF THE IMPERVIOUS DIKES PLACEMENT
FOR EACH DAY'S WORK.
9.
REMOVE STILLING BASIN(S) IF APPLICABLE. STABILIZE DISTURBED AREA WITH SEED AND MULCH, AS
SOON AS PRACTICAL.
10.
RETURN BANKS TO ORIGINAL GRADE AND INSTALL RECP PER DETAIL 4, SHEET OOC-15.
PUMP
NOT TO SCALE
GENERAL EROSION CONTROL NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL
EROSION CONTROL MEASURES INSTALLED FOR THE FULL
DURATION OF THIS CONTRACT.
2. ALL EROSION CONTROL MEASURES SHALL CONFORM TO
THE STANDARDS SET FORTH IN THE STATE OF NORTH
CAROLINA EROSION AND SEDIMENT CONTROL PLANNING
AND DESIGN MANUAL.
3. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, THE
LIMITS OF THE LAND DISTURBANCE SHALL BE CLEARLY
AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS,
OR OTHER APPROPRIATE MEANS. THE LOCATION AND
EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY
SHALL BE DEMARCATED FOR THE DURATION OF THE
CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL
OCCUR OUTSIDE THE APPROVED LIMITS INDICATED ON
THE APPROVED PLANS.
4. COMPLY WITH THE FOLLOWING CONSTRUCTION SEQUENCE:
A. CONTACT NCDENR WILMINGTON REGIONAL OFFICE
DIVISION OF LAND RESOURCES AT LEAST 3 DAYS
PRIOR TO LAND DISTURBING ACTIVITY TO SET UP
PRE CONSTRUCTION CONFERENCE. 910-796-7215.
B. INSTALL ALL TEMPORARY EROSION AND SEDIMENT
CONTROL DEVICES PRIOR TO LAND DISTURBANCE.
C. ALL SEDIMENT AND EROSION CONTROL DEVICES
SHALL BE INSPECTED EVERY SEVEN (7) DAYS OR
AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS
ONE-HALF (0.5) INCH. DAMAGED OR INEFFECTIVE
DEVICES SHALL BE REPAIRED OR REPLACED, AS
NECESSARY.
D. PROVIDE SILT FENCE AND/OR OTHER CONTROL
DEVICES, AS SHOWN OR REQUIRED, TO CONTROL
SOIL EROSION DURING CONSTRUCTION. ALL
DISTURBED AREAS SHALL BE CLEANED, GRADED AND
STABILIZED WITH GRASSING IMMEDIATELY AFTER THE
UTILITY INSTALLATION.
E. ALL EROSION CONTROL DEVICES SHALL BE
PROPERLY MAINTAINED DURING ALL PHASES OF
CONSTRUCTION UNTIL THE COMPLETION OF ALL
CONSTRUCTION ACTIVITIES AND ALL DISTURBED
AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL
DEVICES MAY BE REQUIRED DURING CONSTRUCTION
IN ORDER TO CONTROL EROSION AND/OR OFFSITE
SEDIMENTATION.
F. THE CONTRACTOR MUST TAKE NECESSARY ACTION
TO MINIMIZE THE TRACKING OF MUD ONTO THE
PAVED ROADWAY FROM CONSTRUCTION AREAS. THE
CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM
PAVEMENTS, AS MAY BE REQUIRED.
G. STABILIZE ALL SPOIL AREAS.
H. PROVIDE PERMANENT GROUND COVER AS
SPECIFIED.
I. REMOVE TEMPORARY EROSION AND SEDIMENT
CONTROL DEVICES AND MEASURES UPON
COMPLETION OF PROJECT.
5. ALL DITCH LINES DISTURBED OR RELOCATED DURING
CONSTRUCTION SHALL BE RESTABILIZED BY THE
CONTRACTOR. INSTALL A TEMPORARY DITCH LINER OF
JUTE OR GEOTEXTILE FABRIC ON THE DITCH BOTTOM
AND SIDE SLOPES.
6. INLET PROTECTION WILL BE INSTALLED AROUND EXISTING
INLETS AS SHOWN ON THE GRADING DRAINAGE AND
EROSION CONTROL PLANS.
PERMANENT DRAINAGE SWALE
NOT TO SCALE
EROSION CONTROL DETAILS
7
0 1~ 2~ FILENAME 00C-14.dwg SHEET
SCALE AS NOTED OOC-14
C
C
PROJECT MANAGER
E. WILLIAMS, PE
''w`vnvaavrvr
,•�•O�j� C.... ,••
ES' SIO •.
F124-34
F '•••••-�•' C��' s
W1�-��P
BLUE CLAY ROAD
FORCE MAIN
Cape Fear
Cape Fear Public Utility Authority
Public Utilit y authority �w�
Stewardship. Sustainability. Service. Wilmington, NC
DESIGNED BY
R. PLUMMER, PE
CHECKED BY
T. LEWIS, PE
DRAWN BY
G. HUNEYCUTT
B
05/2016
REVISIONS PER ENVIRON. REGULATORY COMMENTS
A
04/2016
REGULATORY REVIEW
I ISSUE
DATE
DESCRIPTION
PROJECT NUMBER
5
219925
GENERAL EROSION CONTROL NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL
EROSION CONTROL MEASURES INSTALLED FOR THE FULL
DURATION OF THIS CONTRACT.
2. ALL EROSION CONTROL MEASURES SHALL CONFORM TO
THE STANDARDS SET FORTH IN THE STATE OF NORTH
CAROLINA EROSION AND SEDIMENT CONTROL PLANNING
AND DESIGN MANUAL.
3. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, THE
LIMITS OF THE LAND DISTURBANCE SHALL BE CLEARLY
AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS,
OR OTHER APPROPRIATE MEANS. THE LOCATION AND
EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY
SHALL BE DEMARCATED FOR THE DURATION OF THE
CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL
OCCUR OUTSIDE THE APPROVED LIMITS INDICATED ON
THE APPROVED PLANS.
4. COMPLY WITH THE FOLLOWING CONSTRUCTION SEQUENCE:
A. CONTACT NCDENR WILMINGTON REGIONAL OFFICE
DIVISION OF LAND RESOURCES AT LEAST 3 DAYS
PRIOR TO LAND DISTURBING ACTIVITY TO SET UP
PRE CONSTRUCTION CONFERENCE. 910-796-7215.
B. INSTALL ALL TEMPORARY EROSION AND SEDIMENT
CONTROL DEVICES PRIOR TO LAND DISTURBANCE.
C. ALL SEDIMENT AND EROSION CONTROL DEVICES
SHALL BE INSPECTED EVERY SEVEN (7) DAYS OR
AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS
ONE-HALF (0.5) INCH. DAMAGED OR INEFFECTIVE
DEVICES SHALL BE REPAIRED OR REPLACED, AS
NECESSARY.
D. PROVIDE SILT FENCE AND/OR OTHER CONTROL
DEVICES, AS SHOWN OR REQUIRED, TO CONTROL
SOIL EROSION DURING CONSTRUCTION. ALL
DISTURBED AREAS SHALL BE CLEANED, GRADED AND
STABILIZED WITH GRASSING IMMEDIATELY AFTER THE
UTILITY INSTALLATION.
E. ALL EROSION CONTROL DEVICES SHALL BE
PROPERLY MAINTAINED DURING ALL PHASES OF
CONSTRUCTION UNTIL THE COMPLETION OF ALL
CONSTRUCTION ACTIVITIES AND ALL DISTURBED
AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL
DEVICES MAY BE REQUIRED DURING CONSTRUCTION
IN ORDER TO CONTROL EROSION AND/OR OFFSITE
SEDIMENTATION.
F. THE CONTRACTOR MUST TAKE NECESSARY ACTION
TO MINIMIZE THE TRACKING OF MUD ONTO THE
PAVED ROADWAY FROM CONSTRUCTION AREAS. THE
CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM
PAVEMENTS, AS MAY BE REQUIRED.
G. STABILIZE ALL SPOIL AREAS.
H. PROVIDE PERMANENT GROUND COVER AS
SPECIFIED.
I. REMOVE TEMPORARY EROSION AND SEDIMENT
CONTROL DEVICES AND MEASURES UPON
COMPLETION OF PROJECT.
5. ALL DITCH LINES DISTURBED OR RELOCATED DURING
CONSTRUCTION SHALL BE RESTABILIZED BY THE
CONTRACTOR. INSTALL A TEMPORARY DITCH LINER OF
JUTE OR GEOTEXTILE FABRIC ON THE DITCH BOTTOM
AND SIDE SLOPES.
6. INLET PROTECTION WILL BE INSTALLED AROUND EXISTING
INLETS AS SHOWN ON THE GRADING DRAINAGE AND
EROSION CONTROL PLANS.
PERMANENT DRAINAGE SWALE
NOT TO SCALE
EROSION CONTROL DETAILS
7
0 1~ 2~ FILENAME 00C-14.dwg SHEET
SCALE AS NOTED OOC-14
C
C
CATCH BASIN
CATCH BASIN
STORM PIPE
1 I 2 I 3 I 4
INLET GRATE
NOTES
SUSPENSION CORD/RODS 1.
RECESSED CURB INLET MUST
BE
BLOCKED WHEN USING
FILTER
FABRIC SACK.
OVERFLOW
PERMANENT SEEDING
2.
SIZE OF SACK TO BE
FILTER FABRIC SACK DETERMINED
BY MANUFACTURER
TO
SUIT INLET.
3.
INSTALL BAGS WITHOUT GAPS
AT
INLET GRATE.
4.
FILTER FABRIC SACK SHALL
BE
"SILTSACK" MANUFACTURED
BY
ACF ENVIRONMENTAL, INC.
1" REBAR IN HEM
FOR BAG REMOVAL
RUBBER RESTRAINT
BLOCKS
EXPANSION RESTRAINT
TIE
FILTER FABRIC SACK
SIDE VIEW
INLET SEDIMENT PROTECTION
NOT TO SCALE
II II
II II
U u
TEMPORARY FABRI
NOT TO SCALE
fal
HDR Engineering, inc.
of the Carolinas
0
I
N
0
I
N
NCDOT #5 OR
#57 WASHED STONE
N.C.B.E.LS. License Number. P-0116
1780.2 Chandlers Lane I Sunset Beach, NC 28468
2
4'-0" (MAX)
Pei
DIRECTION 10'
OF FLOW
-5' STEEL POST
(1.25 LB/LF STEEL)
-19-GAUGE WIRE
HARDWARE CLOTH
(1/4" MESH OPENINGS)
',,�-NCDOT #5 OR
#57 WASHED STONE
?-7
AILr3
EXISTING
GROUND
PLACE TWO STAKES UPSTREAM
OF WATTLE AND FOUR
DOWNSTREAM OF WATTLE
5 1 6 1 7 1 8
PLAN VIEW REINFORCED SECTION VIEW
EROSION CONTROL
INSTALL 10 LF OF
ROLLED EROSION
CONTROL PRODUCT
PRIOR TO INSTALLING
WATTLE
VATTLE ON
EACH SIDE WITH 12 -IN
STAPLES EVERY FOOT
AND ON EACH END
NOTES: PRODUCT
1. INSTALL ROLLED EROSION CONTROL PRODUCT (RECP) 10 -FT LONG X
10 -FT WIDE (SEE RECP DETAIL 5, SHEET OOC-18 FOR REQUIREMENTS OF
INSTALLATION).
2. INSTALL 18 -IN DIAMETER X 10 -FT LONG EXCELSIOR WATTLE. WEIGHT
SHALL BE 5.0 LBS./LF. WATTLE SHALL CONSIST OF 80% OR MORE FIBERS
WITH A LENGTH OF GREATER THAN 6 -IN. NETTING SHALL BE CLOSED ON
BOTH SIDES.
3. INSTALL WATTLE 2 -FT DOWNSTREAM OF RECP (8 -FT OF RECP WILL BE
DOWNSTREAM OF WATTLE).
4. WHERE WATTLES ARE PLACED ALONG A DITCH, THE TOP ELEVATION OF THE
DOWNSTREAM WATTLE SHOULD MATCH THE BOTTOM ELEVATION OF THE
WATTLE UPSTREAM.
5. SEE EROSION AND SEDIMENTATION NOTES ON SHEET OOC-13 FOR
MAINTENANCE REQUIREMENTS.
EXCELSIOR WATTLE DETAIL n
NOT TO SCALE
TOP OF CHANNEL
ANCHOR THE MAT
BELOW FINISHED
GRADE (TYP. 8")
REVEGETATE AS NOTED
FOR SHORT-TERM
STABILIZATION
DO NOT SEED BELOW
WATER LEVEL AT
INTERMITTENT OR
PERENNIAL STREAMS
CHANNEL WITH RECP
NOT TO SCALE
EROSION AND SEDIMENTATION CONTROL NOTES
1. INSTALL ALL EROSION AND SEDIMENTATION CONTROL MEASURES AND DEVICES NECESSARY TO COMPLY WITH THE STANDARDS
AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AND APPLICABLE STATE
AND LOCAL LAWS AND ORDINANCES, AND PREVENT STANDING WATER WITHIN PROJECT LIMITS UNLESS OTHERWISE DIRECTED.
2. GROUND STABILIZATION SHALL BE ACHIEVED CONSISTENT WITH NC DENR GENERAL PERMIT NCGO10000 EFFECTIVE AS OF AUGUST
2, 2011. WHERE LAND DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, ALL DISTURBED AREAS SHALL BE
PROVIDED WITH TEMPORARY OR PERMANENTLY STABILIZATION WITH GROUND COVER WITHIN 14 CALENDAR DAYS FROM THE LAST
LAND DISTURBING ACTIVITY EXCEPT FOR ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES
STEEPER THEN 3:1 (H:V), WHICH SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER WITHIN 7
CALENDAR DAYS FROM THE LAND DISTURBING ACTIVITY. REFER TO GENERAL PERMIT NCGO10000 FOR SPECIFIC CONDITIONS,
EXEMPTIONS AND DEFINITIONS FOR MEETING THE STABILIZATION REQUIREMENTS.
3. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE WHENEVER LAND
DISTURBANCE ACTIVITY IS IN PROGRESS.
4. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND ANY DEFICIENCIES NOTED WILL BE CORRECTED
BY THE END OF EACH DAY. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED
NECESSARY BY ON-SITE INSPECTION.
5. ACCUMULATED SEDIMENT IS TO BE CLEANED FORM THE UPSTREAM SIDE OF IN STREAM CHECK DAMS AT THE END OF EACH
WORK DAY.
6. MAINTAIN ALL EROSION CONTROL MEASURES INSTALLED FOR THE FULL DURATION OF THIS CONTRACT.
7. MAINTAIN RECORDS OF ALL ACTIVITIES ASSOCIATED WITH SEDIMENT AND EROSION CONTROL MAINTENANCE AND INSPECTIONS
INCLUDING WEEKLY, DAILY AND AFTER RAIN INSPECTION REPORTS.
8. EXISTING EROSION CONTROL MEASURES WITHIN THE CONSTRUCTION LIMITS SHALL BE MAINTAINED THROUGHOUT THE DURATION
OF THE PROJECT.
9. ADDITIONAL ESC MEASURES WILL BE IMPLEMENTED IF THE EXISTING MEASURES ARE NOT PERFORMING ADEQUATELY TO MEET
STATE AND FEDERAL REGULATIONS AS DICTATED BY FIELD CONDITIONS. CHANGES TO THE ESC PLAN WILL BE DOCUMENTED AND
SHOWN ON THE CONSTRUCTION DRAWINGS. A SET OF CONSTRUCTION DRAWINGS MUST BE ON SITE AT ALL TIMES AND MADE
AVAILABLE TO THE ENGINEER UPON REQUEST.
■.1
SEEDING SCHEDULE
PROJECT MANAGER
E. WILLIAMS, PE
PERMANENT SEEDING
DESIGNED BY
R. PLUMMER, PE
TEMPORARY SEEDING
ALL AREAS
CHECKED BY
T. LEWIS, PE
TYPE
RATE (LBS/AC)
SEASON
DRAWN BY
G. HUNEYCUTT
NON-RESIDENTIAL
CENTIPEDE
5
LATE WINTER -SPRING
OATS
50
C
FESCUE
B
05/2016
REVISIONS PER ENVIRON. REGULATORY COMMENTS
50
A
04/2016
REGULATORY REVIEW
OATS AND WINTER RYE
ISSUE
DATE
DESCRIPTION
PROJECT NUMBER
219925
EROSION AND SEDIMENTATION CONTROL NOTES
1. INSTALL ALL EROSION AND SEDIMENTATION CONTROL MEASURES AND DEVICES NECESSARY TO COMPLY WITH THE STANDARDS
AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AND APPLICABLE STATE
AND LOCAL LAWS AND ORDINANCES, AND PREVENT STANDING WATER WITHIN PROJECT LIMITS UNLESS OTHERWISE DIRECTED.
2. GROUND STABILIZATION SHALL BE ACHIEVED CONSISTENT WITH NC DENR GENERAL PERMIT NCGO10000 EFFECTIVE AS OF AUGUST
2, 2011. WHERE LAND DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, ALL DISTURBED AREAS SHALL BE
PROVIDED WITH TEMPORARY OR PERMANENTLY STABILIZATION WITH GROUND COVER WITHIN 14 CALENDAR DAYS FROM THE LAST
LAND DISTURBING ACTIVITY EXCEPT FOR ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES
STEEPER THEN 3:1 (H:V), WHICH SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER WITHIN 7
CALENDAR DAYS FROM THE LAND DISTURBING ACTIVITY. REFER TO GENERAL PERMIT NCGO10000 FOR SPECIFIC CONDITIONS,
EXEMPTIONS AND DEFINITIONS FOR MEETING THE STABILIZATION REQUIREMENTS.
3. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE WHENEVER LAND
DISTURBANCE ACTIVITY IS IN PROGRESS.
4. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND ANY DEFICIENCIES NOTED WILL BE CORRECTED
BY THE END OF EACH DAY. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED
NECESSARY BY ON-SITE INSPECTION.
5. ACCUMULATED SEDIMENT IS TO BE CLEANED FORM THE UPSTREAM SIDE OF IN STREAM CHECK DAMS AT THE END OF EACH
WORK DAY.
6. MAINTAIN ALL EROSION CONTROL MEASURES INSTALLED FOR THE FULL DURATION OF THIS CONTRACT.
7. MAINTAIN RECORDS OF ALL ACTIVITIES ASSOCIATED WITH SEDIMENT AND EROSION CONTROL MAINTENANCE AND INSPECTIONS
INCLUDING WEEKLY, DAILY AND AFTER RAIN INSPECTION REPORTS.
8. EXISTING EROSION CONTROL MEASURES WITHIN THE CONSTRUCTION LIMITS SHALL BE MAINTAINED THROUGHOUT THE DURATION
OF THE PROJECT.
9. ADDITIONAL ESC MEASURES WILL BE IMPLEMENTED IF THE EXISTING MEASURES ARE NOT PERFORMING ADEQUATELY TO MEET
STATE AND FEDERAL REGULATIONS AS DICTATED BY FIELD CONDITIONS. CHANGES TO THE ESC PLAN WILL BE DOCUMENTED AND
SHOWN ON THE CONSTRUCTION DRAWINGS. A SET OF CONSTRUCTION DRAWINGS MUST BE ON SITE AT ALL TIMES AND MADE
AVAILABLE TO THE ENGINEER UPON REQUEST.
■.1
SEEDING SCHEDULE
PERMANENT SEEDING
TEMPORARY SEEDING
ALL AREAS
AREA TYPE
TYPE
RATE (LBS/AC)
SEASON
TYPE
RATE (LBS/AC)
NON-RESIDENTIAL
CENTIPEDE
5
LATE WINTER -SPRING
OATS
50
C
FESCUE
50
WINTER RYE (GRAIN)
50
OATS AND WINTER RYE
(GRAIN) 25 EACH
RESIDENTIAL
CENTIPEDE
5
SUMMER
SUDAN GRASS
35-40
FESCUE TYPE
I 50
BROWN TOP MILLET
30-40
FESCUE TYPE
II 50
WEEPING LOVEGRASS
4-6
LATE SUMMER/
EARLY WINTER WINTER RYE (GRAIN) 50
OATS 50
BARLEY 30-40
WHEAT 30-40
SEEDING NOTES:
1. APPLY LIMESTONE AT A RATE OF 4,000 LBS PER AC AND FERTILIZER, 5-10-5, AT A RATE OF 500 LBS PER AC.
2. PROVIDE MULCH AT A RATE OF 4 TO 5 STRAWS IN DEPTH OR 1.5 TONS PER AC.
3. SEE SPECIFICATION SECTION 02900 AND 02900A FOR ADDITIONAL REQUIREMENTS.
INSTALL 6"
RECP BLANKET COIR FIBER,
BIO -D MAT 40 BY ROLANKA
INTERNATIONAL, NEDIA
KOIRMAT 400, COR MAT 40
BY GRANITE ENVIRONMENTAL,
OR EQUAL
0pe.evp„v..
FES I
Ltt
F12434 ��
Cape Fear
51%1 Public Utility Authority
Stewardship. Sustainability. Service.
TEMPORARY CHANNEL LINING NOTES:
CONSTRUCTION
1. FINE GRADE AREAS SO THE TOP OF GROUND IS SMOOTH AND LOOSE.
2. PLANT SEED .BY FOLLOWING SEEDING SPECIFICATIONS.
3. TERMINAL ANCHOR TRENCHES ARE REQUIRED AT ENDS AND ACROSS CHANNELS
AT 25 FOOT INTERVALS. TERMINAL ANCHOR TRENCHES SHALL BE A MINIMUM
OF 12 INCHES DEEP AND 6 INCHES WIDE. INTERMITTENT TRENCHES SHALL BE
A MINIMUM OF 6 INCHES DEEP AND 6 INCHES WIDE OR BY INSTALLING TWO
ROWS OF ANCHORS CLOSELY SPACED.
4. AFTER INSTALLING THE INITIAL TERMINAL TRENCH BEGINNING AT THE
DOWNSTREAM END OF THE CHANNEL, UNROLL RECP UNTIL THE FIRST
INTERMITTENT TRENCH IS REACHED. FOLD BACK THE RECP BACK OVER ITSELF.
AND PIN THE TWO LAYERS. THEN CONTINUE UP THE CHANNEL FOLLOWING THESE
STEPS AT EACH INTERMITTENT TRENCH.
5. AT THE UPPER TERMINAL TRENCH, SECURE WITH STAPLES, BACKFILL AND
COMPACT. THEN FOLD THE MAT BACK OVER ITSELF AND OVERLAP THE RECP A
MINIMUM OF 2 FEET.
6. WHEN STARTING INSTALLATION OF A NEW ROLL, BEGIN IN A TRENCH OR
SHINGLE -LAP ENDS OF ROLLS A MINIMUM OF ONE FOOT WITH UPSTREAM RECP
ON TOP.
MAINTENANCE
1. INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER
EACH SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT, REPAIR
IMMEDIATELY.
2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST
NOT OCCUR BENEATH THE RECP.
3. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH
THE GROUND SHALL BE REPAIRED AND STAPLED.
4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM
SHALL BE FIXED AND THE ERODED AREA PROTECTED.
5. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS
ESTABLISHED. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL EROSION
CONTROL MEASURES INSTALLED FOR THE FULL DURATION OF THIS CONTRACT.
BLUE CLAY ROAD
FORCE MAIN
Cape Fear Public Utility Authority
Wilmington, NC
EROSION CONTROL DETAILS
0 1" 2" FILENAME OOC-15.dwg
SCALE AS NOTED
OOC-15
■:1
101