HomeMy WebLinkAbout20120548 Ver 1_As Built and Year 2 Monitoring Report_20160516a
�mfl,Unimin
May 17, 2016
Ms. Karen Higgins
NC Division of Water Resources
512 North Salisbury Street
Raleigh, NC 27604
RE: North Toe River Bank Stabilization
As -Built (2013) and Monitoring Year 2 (2015) Reports
Avery County, North Carolina
Corps Action ID 2012-00962; DWQ Project# 12-0548
Ms, Higgins,
Schoolhouse Quartz Plant
107 Harris Mining Co. Rd
Spruce Pine, NC 28777
Phone: 828-765-4251
Fax: 828-765-2202
Please reference the 401 Water Quality Certification (Certification) issued by the NC Division of
Water Resources (DWR) on July 12, 2012 (Attachment A). The Certification authorizes 1,140 feet
of stream impacts for the purposes of stream bank stabilization on the North Toe River in Avery
County, North Carolina. As part of the Certification approval, stream/structure stability monitoring
was required for a period of three years. Monitoring was to include an as -built drawing, photo
documentation, and a narrative of findings.
The attached 2013 As -Built (Attachment B), 2014 Monitoring Year 1 (Attachment C), 2015
Monitoring Year 2(Attachment D), and 2016 Monitoring Year 3(Attachment D) reports for the North
Toe River Bank Stabilization project are being submitted on behalf of the Unimin Corporation
represented by myself
Construction of eight structures was completed during May 2013. As -built photo documentation was
completed during 2013 followed by photo documentation during May 2014, May 2015 and finally
May 2016. Results from the continued photo documentation efforts indicate that all eight
structures remain stable and are functioning as designed. This is the final monitoring report to be
submitted for the completion of the three year monitoring period from 2013 until 2016.
Please do not hesitate to contact me at 828-765-4251 extension 313 if you have any questions or
comments.
Respectfully,
Angela Poston
Unimin Schoolhouse Quartz Plant
Plant Superintendent
Attachment A
DWR Water Quality Certification
4*�
RCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wak9d, RE,
Governor Director
July 12, 2012
Unimin. Corporation
Andrew Bradley, Attn: Mike Vencill
107 Harris Mining Company Rd.
Spruce Pine, NC 28777
Subject: 401 Water (Quality Certification - Approval
North Toe River Bank Stabilization
DWQ Project # 12-0548
Avery County
FrB / N.Toe / 7-2-(27.7) / C; Tr
Dear Mr. Bradley:
Dee Freeman
Secretary
The Division of Water Quality (DWQ) has completed the review of your 401 Water Quality Certification
application associated with the subject project listed above.
Approval has been granted to place fill within or otherwise impact 1140 feet of streams for the purpose of bank
stabilization at the subject property. This approval requires you to follow the conditions listed in the
attached Certification and any additional conditions listed below.
Project impacts are covered by General Water Quality Certification Number 3885. This Certification allows
you to use Nationwide Permit 27 when issued by the US Army Corps of Engineers (USACE). Authorization to
proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as
authorized by this Certification shall expire upon expiration of the corresponding USACE Permit Verification.
In addition, you should obtain or otherwise comply with any other required federal, state or local permits before
you proceed with your project including (but not limited to) Erosion and Sediment Control and Trout Buffer
regulations.
This approval is for the purpose and design that you described in your application. If you change your project,
you must notify us and may be required to submit a new application.
Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general conditions of
this Certification are met. No other impacts are approved including incidental impacts:
Location: 2080 U.S. Highway 70, Swannanoa, North Carolina 28778
Phone: 828-296A5001FAX: 828-299-7043
Internet: www.ncwaterquality.org
An Equal Opportunity 1 Atfumah" Action Employer
O
NorlhCa.ralina
Natwralli, f
Amount Approved (Units) Plan Location or Reference
Stream
1 1140 (feet) S1 -S4 application
Location: 2080 U.S. Highway 70, Swannanoa, North Carolina 28778
Phone: 828-296A5001FAX: 828-299-7043
Internet: www.ncwaterquality.org
An Equal Opportunity 1 Atfumah" Action Employer
O
NorlhCa.ralina
Natwralli, f
Unimin-N. Toe Bank Stabilization
July 12, 2012
Page 2 of 2
Conditions
Stream/Structure Stability Monitoring
Upon completion of construction activities the structures shall be surveyed, as -built drawings developed
along with photo documentation of the project; all shall be submitted to DWQ. Also included in the as -
built submittal, with photo documentation, shall be the location and restoration technique of the access
areas and the ford. Annually for three years this project shall be monitored. An annual report shall be
submitted to the DWQ including a narrative of findings, surveys, repairs needed, and photographic
documentation of conditions at the structures and access areas. The as -built submittal shall be submitted
within 30 days of the completion of the project, then for three years thereafter the annual reports shall be
submitted. Submit the as -built submittal and annual reports to Division of Water Quality, 2090 US
H WY 70, Swannanoa, NC 28778.
The Division of Water Quality, Asheville Regional Office, requires contact be made approximately two
weeks prior to beginning construction activities. All comments submitted in the NC Wildlife Resources
Commission letter dated July 3, 2012 are hereby incorporated into this approval.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream
impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive
this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina
General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-
6714. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of your application by the Division of Water Quality under Section 401 of the
Clean Water Act. If you have any questions, please contact Linda Wiggs in the Asheville Regional Office at
828-296-4500.
Sincerely,
Charles Wakild, P.E., Director
CW11SW
Enc: GC3885
Certificate of Completion
cc: USACE Asheville Regulatory Field. Office
WeBSCaPe Unit — Central Office
File Copy
Wildlife Resources Commission -Dave Me Henry
Clear Water (e -copy)
S:4SWP1Avery140ls\Non-D0TlNorth Toe River Bank StabilizatonlNTo Rvr.Appmval.July 2012.doc
Attachment B
As Built 2013 Drawings Representative Photographs
TRVIis
+L -r-
- rs1^ 1a
z
• _ � '� i�ks�l"� Lit .
�ft+
r .;� � "' - air• a•- dt y-'+��i'�'
'`'-ti - ' r- . , �: • � `. _ 1, a r w.-,�
Photo 5. Work Area 2. Downstream Vane.
Photo Unavailable
Photo 6. Work Area 3 Upstream Vane.
Appendix B Representative Photographs
Photo 7. Work Area 3. Middle Vane.
Photo 8. Work Area 3. Downstream Vane.
Appendix B Representative Photographs
Attachment C
Monitoring Year 2 (2014) Representative Photographs
'
• r
�^ •. _ ter- � ��
T,:r-
> r t r •tom
f.
— �• � -�„ 'oaf
Photo 5. Work Area 2. Downstream Vane. 5/5/2014
Photo 6. Work Area 3 Upstream Vane. 5/5/2014
Appendix C Representative Photographs
9
Photo 7. Work Area 3. Middle Vane. 5/5/2014
Photo 8. Work Area 3. Downstream Vane. 5/5/2014
Appendix C Representative Photographs
Attachment D
Monitoring Year 2 (2015) Representative Photographs
Photo 1. Work Area 1. Upstream Cross Vane. 4/24/15
Photo 2. Work Area 1. Downstream Vane. 4/24/15
Appendix D Representative Photographs
1v '� �' . 'SCS-'{5� � '�, ° 1 \ \'� Y � �� �'"q�,�r• n ��' `'� '� R �"`+. 1, -- � '�c. C
t1 1
t � `p u � �'1 �} x �w r-Rt�A�^b{� v �G,, - ,lYf:` "' �✓i_. 'moi �� �� s�K`� r _�
.�,:;
5 M h t4`� Z � I - I - �
t
k
. is ��:, ji;r, Ei -�
- ... ��
L � t fl+.. _ �'�
�:�> i ,r " ., .. . �:� lye
.. �, _. �
. � �.
„�
--. o
`-.. _ -0;
_
� .. �
''. ..
.',r
,,:' .�. ,
Photo 7. Work Area 3. Middle Vane. 4/24/15
Photo 8. Work Area 3. Downstream Vane. 4/24/15
Appendix D Representative Photographs
Attachment E
Monitoring Year 3 (2016) Representative Photographs
aXs
ilNA
.. � t�'a' !> T2s �7�: - ... �- •?�- Sf`.-J.`. ,.
Y
Photo 5. Work Area 2. Downstream Vane. 4/28/16
b
40
V Sry, to �f�45
llof
Photo 6. Work Area 3. Upstream Vane. 4/28/16
Appendix E Representative Photographs
Photo 7. Work Area 3. Middle Vane. 4/28/16
Photo 8. Work Area 3. Downstream Vane. 4/28/16
Appendix E Representative Photographs
CORPORA
UNIMIN
NOR.
MEX OF SHEETS
1 a TITLE
PLAN
P3: WORK. AREA PL.ANS
D4 -D5: DETAILS
PR Ji,CT'iNCIN A
GRAPHIC SCALE
m..ESES NOT,"D OTHERW&.' TO rrTEsaroF Vl(KNc>MEDGE, THE
200 0 200 400
s �
d
RR�'r� R� 'PodM„d
. STN slAd �
NI'
__...._ _. ___._......_._r..__..._...._._
r're,,vedBY,.
CONFLUENCE
._ ENiilir4l":2i8UC'i, Pf„,.�.
1F Urr�erai5frera
f1m
o e:028251"'.5530
wnnureme- .In
..1
11ROlhC"U'D START DA9"E
(:0V,P d"H)X 17A'l FI
_........_.W......_..,_.__._.....__.......
A]'k'IECDVA.q..
SITELOCAVON
s,rREAM WORK AREA 1 Pl-AN; 1 " = 100'
NOTES: MINIMVE
DIS URBANCE TO
BUFFER VEGE"I"Al"10N
WHEN MAKING ACCESS
POUTS. USE 'TIMBER
MA""FS 'TO FORM RAMP
TO RIVER. RESTORE
DISTURBED AREAS PER
S&EC DUAILS,
s-rREAM WORK AREA 3 PLAN; 1 " = 100'
POND OUTLET
I,:,
,T 20;
� 3
t -,RX
-"L 6+'4`1
;HFHJ Pti ',,
z
UJ
o
z
STREAM WORK AREA 2 PLAN; 1 100'
Z
0
Ed
BE
Typ.
Z
0 z
7�.
oz
."w/do/
;� D
s-rREAM WORK AREA 3 PLAN; 1 " = 100'
POND OUTLET
I,:,
,T 20;
� 3
t -,RX
-"L 6+'4`1
;HFHJ Pti ',,
iriL' 04 11-1,1
21
1-M
FLOW
tx
22-
22'
FCK)T E R
INVERT BOULDERS FLUSH
BUJI, DER
WIT L1 BASEN 0VV W.&
BACKNU WIT1 f ON-SlIE
v
GRAVEL AND COME
VARIES
71117 Oso,
Y,,'
"
FOMER
e
BOULDER
6'X4'X3'HEADER
BOULDER70'
WMXHEADER
SE E NO LE I
BOULDER I
SEF N07E
Lli
SEE NOTE
ILU Z
5z,
I"'LAN
PLAN
LL
z
0
I
BOULDER
VANE
2
BOULDER CROSS VANE
u
D4
w,rs
EA L
N,rs
..... ..... ..... . ... ... ......
I 4L0
HEADER BOULDER
P z
E, I"
VARIES
'ET")P
4,9''rO 5.6 FILTER FAB RIIC
OF BANK y.
21 NAIN.
z
210 o
BACKFILI. W/ ON-SITE"',
XMIN
Gl-'�AVEL AND COBB LE
. . Y.vER
Rl8,4j.)
WMIN.
FOOTER BOULDER
FOOTER BOUL DER
W
PROFILE A-&'
SECTION B -B'
DA
MAI" tl G Ah
iriL' 04 11-1,1
'rop of RANK
VILAIN, MATTING PLACED FLUSH WITH SANK SUR PACE, IAP
OVER DOWN STREAM I ]h WN 131,04"F, SEAMS
12" WCXDD STAKE FNACED IN
T0,C. DIAMOND PATTERN
MA TINS ANC�K)RED V
BEII STREAM BED
S4,10071I SURFACE, REMOVE
At L. SEER IS AND SEEDiNIULCH
BEFORE PLACINC, TAXIIIING
NCYIES; SECT 1014
1, MAITING SHAL L. BE GOIR FIBER, t80 0,RAVISIS(.1
METER WI III NOMINAL. 0.50 INCH 0PEN*JT', SIZE.
2 APPLY WHEA1 OR DAI SIRAWMIJILCHAf 106
iB,1,000 SFILCL SEEDED AREAS
I EROSION CON"mm. MAFrING
D5 ' NTS
PERMANENTSEED MIX'
"APPLIED ATO 5 LP/I,D(Y)SIF1"0 ALI. DISTURBED AREAS
Cmimor Narne,
I Sciandc Nainq pwontage
Swkhgrass
parilcul I VILripium
D
virg,ria VNild Hys
Edyl evs vogh itcus
M)
Deer To,,guv
Parkajas dandestimur
GaIden Ticksoad
Coreopsis vnclona
5
Shcwp Tlcksml
WRmo Rulstcea
5
trommd
1 Vernaria ggarit"a
Fox Sedp
I Carex vulpinddea
10
TCYTAL
'TEMPORARY SEED MMX
(APPLIED WITH PERMANENT MIX)
ApI Dates
Common Nan c Vale (b/I,wo
sl)
Ara oast 15 lo May I
Rye Grain
May I to Amqusl 15
BwwMcn� Millet 03
MIN. 2 ROI ABOVE GRADE
WIN [NANIOND PATTERN
HARD 801L. OR S TONE M"
rY 131". PRESENT SEE 1J07E I
2"10(IRS1 ROW
LIVE STAKE
SECTION
1FORM Pfl () ["1104 r, THROUGH I 9ARD C)IL OR ONE TCL
PREVENT DAMAGE TO STAKE
2UVE STAKE L= TO INCLI 0E AT I,EAST RNO OFT HE
FOL,0WING SPECIES: Sit. KYDCn3,W00L,1, SIL.KY W111 7W,
EI.Di"INBERRY, BUTIONBUSH
2 LIVE STAKING
D p N'TS
STEEL T-Fwr
TOP C U'r AT 15'
BUDSPOINTED
UPWARD
11 TO 11 rel
1f2'"T02"
BASEcu'r
A IF45 DEn.
LIVE STAKE DETAlL
SILS FENCE FABRIC
WMAX. COMPACTf,",D R� 1,
51 EEL. T -POST F L 00t CREEK SIDE
18'' W
FILTER rABRIC
PROFILE
NOTES:
I S�i.T FENCE SHALI1, BE PIACFD ON RIVE R
SIDE Or ALL. s rOCKPII.ES,
Z SI1,T FENCE 8L-f60I L BE REMOVED UPON
COMPLE7100 OF EARTFlNORK.
1 24"tI
SEc,r[ON
3 SlILTIFENCE
D6 NTS