Loading...
HomeMy WebLinkAbout20120548 Ver 1_As Built and Year 2 Monitoring Report_20160516a �mfl,Unimin May 17, 2016 Ms. Karen Higgins NC Division of Water Resources 512 North Salisbury Street Raleigh, NC 27604 RE: North Toe River Bank Stabilization As -Built (2013) and Monitoring Year 2 (2015) Reports Avery County, North Carolina Corps Action ID 2012-00962; DWQ Project# 12-0548 Ms, Higgins, Schoolhouse Quartz Plant 107 Harris Mining Co. Rd Spruce Pine, NC 28777 Phone: 828-765-4251 Fax: 828-765-2202 Please reference the 401 Water Quality Certification (Certification) issued by the NC Division of Water Resources (DWR) on July 12, 2012 (Attachment A). The Certification authorizes 1,140 feet of stream impacts for the purposes of stream bank stabilization on the North Toe River in Avery County, North Carolina. As part of the Certification approval, stream/structure stability monitoring was required for a period of three years. Monitoring was to include an as -built drawing, photo documentation, and a narrative of findings. The attached 2013 As -Built (Attachment B), 2014 Monitoring Year 1 (Attachment C), 2015 Monitoring Year 2(Attachment D), and 2016 Monitoring Year 3(Attachment D) reports for the North Toe River Bank Stabilization project are being submitted on behalf of the Unimin Corporation represented by myself Construction of eight structures was completed during May 2013. As -built photo documentation was completed during 2013 followed by photo documentation during May 2014, May 2015 and finally May 2016. Results from the continued photo documentation efforts indicate that all eight structures remain stable and are functioning as designed. This is the final monitoring report to be submitted for the completion of the three year monitoring period from 2013 until 2016. Please do not hesitate to contact me at 828-765-4251 extension 313 if you have any questions or comments. Respectfully, Angela Poston Unimin Schoolhouse Quartz Plant Plant Superintendent Attachment A DWR Water Quality Certification 4*� RCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wak9d, RE, Governor Director July 12, 2012 Unimin. Corporation Andrew Bradley, Attn: Mike Vencill 107 Harris Mining Company Rd. Spruce Pine, NC 28777 Subject: 401 Water (Quality Certification - Approval North Toe River Bank Stabilization DWQ Project # 12-0548 Avery County FrB / N.Toe / 7-2-(27.7) / C; Tr Dear Mr. Bradley: Dee Freeman Secretary The Division of Water Quality (DWQ) has completed the review of your 401 Water Quality Certification application associated with the subject project listed above. Approval has been granted to place fill within or otherwise impact 1140 feet of streams for the purpose of bank stabilization at the subject property. This approval requires you to follow the conditions listed in the attached Certification and any additional conditions listed below. Project impacts are covered by General Water Quality Certification Number 3885. This Certification allows you to use Nationwide Permit 27 when issued by the US Army Corps of Engineers (USACE). Authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the corresponding USACE Permit Verification. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you proceed with your project including (but not limited to) Erosion and Sediment Control and Trout Buffer regulations. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and may be required to submit a new application. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification are met. No other impacts are approved including incidental impacts: Location: 2080 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296A5001FAX: 828-299-7043 Internet: www.ncwaterquality.org An Equal Opportunity 1 Atfumah" Action Employer O NorlhCa.ralina Natwralli, f Amount Approved (Units) Plan Location or Reference Stream 1 1140 (feet) S1 -S4 application Location: 2080 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296A5001FAX: 828-299-7043 Internet: www.ncwaterquality.org An Equal Opportunity 1 Atfumah" Action Employer O NorlhCa.ralina Natwralli, f Unimin-N. Toe Bank Stabilization July 12, 2012 Page 2 of 2 Conditions Stream/Structure Stability Monitoring Upon completion of construction activities the structures shall be surveyed, as -built drawings developed along with photo documentation of the project; all shall be submitted to DWQ. Also included in the as - built submittal, with photo documentation, shall be the location and restoration technique of the access areas and the ford. Annually for three years this project shall be monitored. An annual report shall be submitted to the DWQ including a narrative of findings, surveys, repairs needed, and photographic documentation of conditions at the structures and access areas. The as -built submittal shall be submitted within 30 days of the completion of the project, then for three years thereafter the annual reports shall be submitted. Submit the as -built submittal and annual reports to Division of Water Quality, 2090 US H WY 70, Swannanoa, NC 28778. The Division of Water Quality, Asheville Regional Office, requires contact be made approximately two weeks prior to beginning construction activities. All comments submitted in the NC Wildlife Resources Commission letter dated July 3, 2012 are hereby incorporated into this approval. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699- 6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of your application by the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Linda Wiggs in the Asheville Regional Office at 828-296-4500. Sincerely, Charles Wakild, P.E., Director CW11SW Enc: GC3885 Certificate of Completion cc: USACE Asheville Regulatory Field. Office WeBSCaPe Unit — Central Office File Copy Wildlife Resources Commission -Dave Me Henry Clear Water (e -copy) S:4SWP1Avery140ls\Non-D0TlNorth Toe River Bank StabilizatonlNTo Rvr.Appmval.July 2012.doc Attachment B As Built 2013 Drawings Representative Photographs TRVIis +L -r- - rs1^ 1a z • _ � '� i�ks�l"� Lit . �ft+ r .;� � "' - air• a•- dt y-'+��i'�' '`'-ti - ' r- . , �: • � `. _ 1, a r w.-,� Photo 5. Work Area 2. Downstream Vane. Photo Unavailable Photo 6. Work Area 3 Upstream Vane. Appendix B Representative Photographs Photo 7. Work Area 3. Middle Vane. Photo 8. Work Area 3. Downstream Vane. Appendix B Representative Photographs Attachment C Monitoring Year 2 (2014) Representative Photographs ' • r �^ •. _ ter- � �� T,:r- > r t r •tom f. — �• � -�„ 'oaf Photo 5. Work Area 2. Downstream Vane. 5/5/2014 Photo 6. Work Area 3 Upstream Vane. 5/5/2014 Appendix C Representative Photographs 9 Photo 7. Work Area 3. Middle Vane. 5/5/2014 Photo 8. Work Area 3. Downstream Vane. 5/5/2014 Appendix C Representative Photographs Attachment D Monitoring Year 2 (2015) Representative Photographs Photo 1. Work Area 1. Upstream Cross Vane. 4/24/15 Photo 2. Work Area 1. Downstream Vane. 4/24/15 Appendix D Representative Photographs 1v '� �' . 'SCS-'{5� � '�, ° 1 \ \'� Y � �� �'"q�,�r• n ��' `'� '� R �"`+. 1, -- � '�c. C t1 1 t � `p u � �'1 �} x �w r-Rt�A�^b{� v �G,, - ,lYf:` "' �✓i_. 'moi �� �� s�K`� r _� .�,:; 5 M h t4`� Z � I - I - � t k . is ��:, ji;r, Ei -� - ... �� L � t fl+.. _ �'� �:�> i ,r " ., .. . �:� lye .. �, _. � . � �. „� --. o `-.. _ -0; _ � .. � ''. .. .',r ,,:' .�. , Photo 7. Work Area 3. Middle Vane. 4/24/15 Photo 8. Work Area 3. Downstream Vane. 4/24/15 Appendix D Representative Photographs Attachment E Monitoring Year 3 (2016) Representative Photographs aXs ilNA .. � t�'a' !> T2s �7�: - ... �- •?�- Sf`.-J.`. ,. Y Photo 5. Work Area 2. Downstream Vane. 4/28/16 b 40 V Sry, to �f�45 llof Photo 6. Work Area 3. Upstream Vane. 4/28/16 Appendix E Representative Photographs Photo 7. Work Area 3. Middle Vane. 4/28/16 Photo 8. Work Area 3. Downstream Vane. 4/28/16 Appendix E Representative Photographs CORPORA UNIMIN NOR. MEX OF SHEETS 1 a TITLE PLAN P3: WORK. AREA PL.ANS D4 -D5: DETAILS PR Ji,CT'iNCIN A GRAPHIC SCALE m..ESES NOT,"D OTHERW&.' TO rrTEsaroF Vl(KNc>MEDGE, THE 200 0 200 400 s � d RR�'r� R� 'PodM„d . STN slAd � NI' __...._ _. ___._......_._r..__..._...._._ r're,,vedBY,. CONFLUENCE ._ ENiilir4l":2i8UC'i, Pf„,.�. 1F Urr�erai5frera f1m o e:028251"'.5530 wnnureme- .In ..1 11ROlhC"U'D START DA9"E (:0V,P d"H)X 17A'l FI _........_.W......_..,_.__._.....__....... A]'k'IECDVA.q.. SITELOCAVON s,rREAM WORK AREA 1 Pl-AN; 1 " = 100' NOTES: MINIMVE DIS URBANCE TO BUFFER VEGE"I"Al"10N WHEN MAKING ACCESS POUTS. USE 'TIMBER MA""FS 'TO FORM RAMP TO RIVER. RESTORE DISTURBED AREAS PER S&EC DUAILS, s-rREAM WORK AREA 3 PLAN; 1 " = 100' POND OUTLET I,:, ,T 20; � 3 t -,RX -"L 6+'4`1 ;HFHJ Pti ',, z UJ o z STREAM WORK AREA 2 PLAN; 1 100' Z 0 Ed BE Typ. Z 0 z 7�. oz ."w/do/ ;� D s-rREAM WORK AREA 3 PLAN; 1 " = 100' POND OUTLET I,:, ,T 20; � 3 t -,RX -"L 6+'4`1 ;HFHJ Pti ',, iriL' 04 11-1,1 21 1-M FLOW tx 22- 22' FCK)T E R INVERT BOULDERS FLUSH BUJI, DER WIT L1 BASEN 0VV W.& BACKNU WIT1 f ON-SlIE v GRAVEL AND COME VARIES 71117 Oso, Y,,' " FOMER e BOULDER 6'X4'X3'HEADER BOULDER70' WMXHEADER SE E NO LE I BOULDER I SEF N07E Lli SEE NOTE ILU Z 5z, I"'LAN PLAN LL z 0 I BOULDER VANE 2 BOULDER CROSS VANE u D4 w,rs EA L N,rs ..... ..... ..... . ... ... ...... I 4L0 HEADER BOULDER P z E, I" VARIES 'ET")P 4,9''rO 5.6 FILTER FAB RIIC OF BANK y. 21 NAIN. z 210 o BACKFILI. W/ ON-SITE"', XMIN Gl-'�AVEL AND COBB LE . . Y.vER Rl8,4j.) WMIN. FOOTER BOULDER FOOTER BOUL DER W PROFILE A-&' SECTION B -B' DA MAI" tl G Ah iriL' 04 11-1,1 'rop of RANK VILAIN, MATTING PLACED FLUSH WITH SANK SUR PACE, IAP OVER DOWN STREAM I ]h WN 131,04"F, SEAMS 12" WCXDD STAKE FNACED IN T0,C. DIAMOND PATTERN MA TINS ANC�K)RED V BEII STREAM BED S4,10071I SURFACE, REMOVE At L. SEER IS AND SEEDiNIULCH BEFORE PLACINC, TAXIIIING NCYIES; SECT 1014 1, MAITING SHAL L. BE GOIR FIBER, t80 0,RAVISIS(.1 METER WI III NOMINAL. 0.50 INCH 0PEN*JT', SIZE. 2 APPLY WHEA1 OR DAI SIRAWMIJILCHAf 106 iB,1,000 SFILCL SEEDED AREAS I EROSION CON"mm. MAFrING D5 ' NTS PERMANENTSEED MIX' "APPLIED ATO 5 LP/I,D(Y)SIF1"0 ALI. DISTURBED AREAS Cmimor Narne, I Sciandc Nainq pwontage Swkhgrass parilcul I VILripium D virg,ria VNild Hys Edyl evs vogh itcus M) Deer To,,guv Parkajas dandestimur GaIden Ticksoad Coreopsis vnclona 5 Shcwp Tlcksml WRmo Rulstcea 5 trommd 1 Vernaria ggarit"a Fox Sedp I Carex vulpinddea 10 TCYTAL 'TEMPORARY SEED MMX (APPLIED WITH PERMANENT MIX) ApI Dates Common Nan c Vale (b/I,wo sl) Ara oast 15 lo May I Rye Grain May I to Amqusl 15 BwwMcn� Millet 03 MIN. 2 ROI ABOVE GRADE WIN [NANIOND PATTERN HARD 801L. OR S TONE M" rY 131". PRESENT SEE 1J07E I 2"10(IRS1 ROW LIVE STAKE SECTION 1FORM Pfl () ["1104 r, THROUGH I 9ARD C)IL OR ONE TCL PREVENT DAMAGE TO STAKE 2UVE STAKE L= TO INCLI 0E AT I,EAST RNO OFT HE FOL,0WING SPECIES: Sit. KYDCn3,W00L,1, SIL.KY W111 7W, EI.Di"INBERRY, BUTIONBUSH 2 LIVE STAKING D p N'TS STEEL T-Fwr TOP C U'r AT 15' BUDSPOINTED UPWARD 11 TO 11 rel 1f2'"T02" BASEcu'r A IF45 DEn. LIVE STAKE DETAlL SILS FENCE FABRIC WMAX. COMPACTf,",D R� 1, 51 EEL. T -POST F L 00t CREEK SIDE 18'' W FILTER rABRIC PROFILE NOTES: I S�i.T FENCE SHALI1, BE PIACFD ON RIVE R SIDE Or ALL. s rOCKPII.ES, Z SI1,T FENCE 8L-f60I L BE REMOVED UPON COMPLE7100 OF EARTFlNORK. 1 24"tI SEc,r[ON 3 SlILTIFENCE D6 NTS