Loading...
HomeMy WebLinkAbout20120010 Ver 1_Emails_20160520 Wanucha, Dave From:Suggs, Phillip H Sent:Friday, May 20, 2016 10:03 AM To:Haff, Richard; steven.butler@campoassociates.com; Euliss, Amy; Keen, Kiera T Subject:Klumac rd Reviewed this loss site. Think the sediment was pushed out of the basin after paving and the heavy rain on the 18th. Verify dimensions of basin ID 01 in the field. Short term: add wattle and PAM below str 0402. Add excelsior matting and PAM to silt checks in ditch on project left. Utilize sand bags along pavement to divert runoff into curb and gutter inlets Repair the failed portion of the skimmer basin weir. Clean up the accumulated sediment from the woods as soon as conditions allow. Sent from my iPad Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1