Loading...
HomeMy WebLinkAbout20011231 Ver 1_RE UT to Dixon R-2248D_20150331Carpenter,Kristi From: Johnson, Alan Sent: Tuesday, March 31, 2015 4:49 PM To: Baker, Virginia; Wainwright, David Subject: RE: UT to Dixon, R-2248D Well, that sounds like what we talked about. May I just say....let the stream be closed out. I am sure that is all DOT wants to know is, is the stream good and can they close out. Ginny, what did Randy say we asked for on the initial close out site for #16. I have in my note "log sills". But nothing more. I just know in general, the site was pretty much ok, but they were going to come back and do some work. From: Baker, Virginia Sent: Tuesday, March 31, 2015 11:33 AM To: Wainwright, David Cc: Johnson, Alan Subject: UT to Dixon, R-2248D David, I had told Randy I would follow up with Alan on this project, which I did. So can you please let Randy know the following. Alan's field comments (8/16/2014) —"DWR would recommend notching existing log sills to ensure water flows over them. One log sill that is half crossing the stream appears to be directing flow into the bank which may still be causing scour." Were likely just based on what was seen in the field on that day (8/16/2014). Alan was talking and I was taking notes, so he does not have his own field notes to ck, although he had looked at my comments after the field visit and been ok with them. What Alan had said was that the removal of logs sills (header and footer logs) were discussed at the Apr 21, 2014 meeting. Comments that were made in August were just based on what the stream looked like on that day after the work was done. This was a recommendation only. Overall he did not have an issue with the condition of the stream stability as do I. Alan please let me and David know if this is a fair assessment of our conversation before David follows up with DOT. Ginny Bake� T��nspo�t�tion Pe�mitting l/nit iVCDEiVR-Division ofW�te� Resou�ces �650 M�ilSe�vice Cente� R�leigh, /VC27699-�650 Phone-<9�9I707-8788, F�x-(9�9I733-�290