Loading...
HomeMy WebLinkAbout20071134 Ver 4_RE R-2518 A&B utility issues_20160421 Carpenter,Kristi From:Beckwith, Loretta A SAW <Loretta.A.Beckwith@usace.army.mil> Sent:Tuesday, April 21, 2015 10:41 AM To:Elliott, Jason C Cc:Baker, Virginia; Barnett, Kevin Subject:RE: R-2518 A&B utility issues (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Sounds good - thanks. -----Original Message----- From: Elliott, Jason C \[mailto:jelliott@ncdot.gov\] Sent: Tuesday, April 21, 2015 10:34 AM To: Beckwith, Loretta A SAW Cc: Baker, Virginia; Barnett, Kevin Subject: \[EXTERNAL\] RE: R-2518 A&B utility issues (UNCLASSIFIED) Good morning Lori (all), Sorry I didn't get back to you yesterday I was out of the office. I do think that we have enough information to have a meeting to figure out and finalize what needs to be done to resolve the utility issues within the next couple of months. If it's ok, I'd like to get the site visits complete (I'll be scheduling those asap, sorry for the delay) for sites that were requested during the 2014 meeting and then we'll set up a date to go over everything. I'm a little confused as to what I need to do for question #2 but I'll talk with Jamie about it and he probably can get me straightened out or I'll call you to make sure I understand what exactly it that you guys need to see. I'll be in touch soon, thanks! Jason -----Original Message----- From: Beckwith, Loretta A SAW \[mailto:Loretta.A.Beckwith@usace.army.mil\] Sent: Monday, April 20, 2015 3:18 PM To: Elliott, Jason C Cc: Baker, Virginia; Barnett, Kevin Subject: R-2518 A&B utility issues (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Hi Jason, I hope you're well. I left you a couple of messages last week about the utility issues on R-2518 A & B and noted that I would send you an email. Questions: 1 1. Do you have enough information to have a meeting on the final proposed resolution for this issue in the next few (1- 4) months? It would probably be best to schedule this meeting the day before or day after an interagency meeting (just not the afternoon of the interagency meeting, as the USACE has team meetings then). If for some reason the information won't be ready for a meeting in 1-4 months, please let me know when a meeting will be possible. 2. Something I didn't detail in my phone messages - Ginny and I were discussing the issues and the following came up - for Sites C, E/F, and N - to compare existing utility lines (at permitting) to the utility lines currently in place, we need to see/have calculations for both sets of utilities (existing (at permitting) and proposed (in place now)) on the NEW stream segment/in the area where the new channel was placed (vs. on the old channel that was moved), as the sites were permitted understanding (at that time) that the utility lines would impact the new locations - please correct me if I'm mistaken. We'll need to see the new numbers and aerials once this is resolved/prior to the final meeting. Please look at the aerials for those sites to see what I'm talking about and call me to discuss if what I've written above isn't clear. Sorry I didn't catch this at our meeting. Thank you, Lori Classification: UNCLASSIFIED Caveats: NONE ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Classification: UNCLASSIFIED Caveats: NONE 2