I think they decided to table the onsite mitigation because some of the proposed site was outside of the HU. Brian is
managing that project now. He may have heard of something else.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Baker, Virginia
Sent: Thursday, May 26, 2016 11:11 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Subject: RE: R2536_ENV_ALL - NCDOT topics Draft On-Site Mitigation Meeting Minutes
Asheboro Bypass, R-2536
Hey Dave, I was just going through some emails and organizing them on LF. I noticed this project was issued and saw
there was no onsite mitigation on the approval letter, I know there had been talk of it in the past.
From: Wanucha, Dave
Sent: Tuesday, September 08, 2015 8:41 AM
To: Baker, Virginia <virginia.baker@ncdenr.gov>
Subject: FW: R2536_ENV_ALL - NCDOT topics Draft On-Site Mitigation Meeting Minutes
1
Hi Ginny,
Revised meeting minutes for a potential On-Site mitigation project for this project.
Dave Wanucha
NC DENR Winston Salem Region Office
NC Division of Water Resources
Transportation Permitting Unit
450 W. Hanes Mill Rd, Suite 300
Winston-Salem, NC 27105
Cell (336) 403-5655
Office (336) 776-9703
Dave.Wanucha@ncdenr.gov
-----
E-mail correspondence to and from this address may be subject
to the North Carolina Public Records Law and may be disclosed to third parties.
From: Tina Swiezy \[mailto:tswiezy@rkk.com\]
Sent: Friday, September 04, 2015 2:24 PM
To: Paugh, Leilani Y; Andrew.E.Williams2@usace.army.mil
Cc: Jim Eisenhardt; Underwood, Chris; Hauser, James W; Wanucha, Dave; Dilday, Jason L; daltland@rkk.com; Rivenbark,
Chris; Tommy Peacock
Subject: Re: R2536_ENV_ALL - NCDOT topics Draft On-Site Mitigation Meeting Minutes
All
The purpose of this separate NCDOT topic On-Site Mitigation Meeting Minutes memo is to provide
documentation for the separate the general mitigation discussion held during the mtg on Aug 7. This mtg
minute information has been provided back just to agency and DOT personnel for verification and
understanding of the topics discussed.
Please review the minutes and let me know if you have any comments by Wednesday September
9th. I will incorporate any comments and send out final minutes after I receive comments on the 9th.
Thanks
___________________________________
TINA SWIEZY, PE
Senior Manager
RK&K
900 Ridgefield, Suite 350
Raleigh,NC 27609
919.878.9560 P
919.790.8382 F
919.653.7362 D
www.rkk.com
2
From:
"Tina Swiezy" <tswiezy@rkk.com>
To:
"Andrew E SAW Williams" <Andrew.E.Williams2@usace.army.mil>
Cc:
"dave wanucha" <dave.wanucha@ncdenr.gov>, crivenbark@ncdot.gov,
csunderwood@ncdot.gov, lpaugh@ncdot.gov, kbcapps@ncdot.gov, "Jason L Dilday"
<jldilday@ncdot.gov>, jhauser@ncdot.gov, "Drew Altland" <daltland@rkk.com>, "Jim Eisenhardt"
<jeisenhardt@rkk.com>, "Jeff Meador" <jmeador@rkk.com>, mshumsky@ncdot.gov,
asheborobypassconstructors@oldcastlematerials.com, Asheboro@wbcci.com, "Mike Merritt"
<mmerritt@rkk.com>, "Matthew Cook" <mcook@rkk.com>, "Tommy Peacock" <jpeacock@rkk.com>,
"Keith Skinner" <kskinner@rkk.com>, "Trent Cormier" <tcormier@icaeng.com>, "Thomas Tallman"
<ttallman@icaeng.com>
Sent:
Thursday, August 27, 2015 7:42:11 AM
Subject:
R2536_ENV_ALL - On-Site Mitigation Meeting Minutes clarification
Andy
I agree. We will be working today to clarify #7 in the minutes .....several statements need to be revised to more
closely reflect the meeting discussions.
Sorry for the confusion.
Thanks
___________________________________
TINA SWIEZY, PE
Senior Manager
RK&K
900 Ridgefield, Suite 350
Raleigh,NC 27609
919.878.9560 P
919.790.8382 F
919.653.7362 D
www.rkk.com
3
From:
"Andrew E SAW Williams" <Andrew.E.Williams2@usace.army.mil>
To:
"Jeff Meador" <jmeador@rkk.com>
Cc:
"dave wanucha" <dave.wanucha@ncdenr.gov>, crivenbark@ncdot.gov,
csunderwood@ncdot.gov, lpaugh@ncdot.gov, kbcapps@ncdot.gov, "Tina Swiezy"
<tswiezy@rkk.com>, "Jason L Dilday" <jldilday@ncdot.gov>, jhauser@ncdot.gov, "Drew Altland"
<daltland@rkk.com>, "Jim Eisenhardt" <jeisenhardt@rkk.com>, "Rachelle Beauregard"
<rbeauregard@ncdot.gov>, "Chris Rivenbark" <crivenbark@ncdot.gov>
Sent:
Wednesday, August 26, 2015 5:25:15 PM
Subject:
RE: \[EXTERNAL\] R2536_ENV_ALL - On-Site Mitigation Meeting Minutes (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Jeff,
Please give me a call regarding these notes. This was not a Concurrence Meeting. Most of the
Conclusion #7 needs to be re-written.
I will be in the office all day tomorrow.
Andrew Williams
Regulatory Project Manager
U.S. Army Corps of Engineers
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
919-554-4884 extension 26
The Wilmington District is committed to providing the highest level of support to the public. To help
us ensure we continue to do so, please complete the Customer Satisfaction Survey located at
http://regulatory.usacesurvey.com/.
-----Original Message-----
From: Jeff Meador \[mailto:jmeador@rkk.com\]
Sent: Wednesday, August 26, 2015 2:29 PM
To: dave wanucha; crivenbark@ncdot.gov; csunderwood@ncdot.gov; lpaugh@ncdot.gov; Williams,
Andrew E SAW; kbcapps@ncdot.gov; Tina Swiezy; Jason L Dilday; jhauser@ncdot.gov; Drew
Altland; Jim Eisenhardt; Rachelle Beauregard; Chris Rivenbark
Cc: Mike Merritt; Matthew Cook; Tommy Peacock; Keith Skinner; Trent Cormier; Thomas Tallman;
mshumsky@ncdot.gov; asheborobypassconstructors@oldcastlematerials.com;
Asheboro@wbcci.com; Amy Parrish
Subject: \[EXTERNAL\] R2536_ENV_ALL - On-Site Mitigation Meeting Minutes
All,
Please find attached draft meeting minutes for the on-site mitigation meeting held on August 7th for
the Asheboro Bypass project (R-2536). Please review the minutes and let me know if you have any
comments by Wednesday September 2nd. I will incorporate any comments and send out final
minutes after I receive comments on the 2nd.