Loading...
HomeMy WebLinkAbout20160541 Ver 1_Bridge No 247 WBS No 17BP 7 R 88 Part 2_20160525Carpenter,Kristi From: Sent: To: Cc: Subject: Attachments: Thomson, Nicole J Wednesday, May 25, 2016 3:15 PM David.E.Bailey2@usace.army.mil; Wrenn, Brian L Carpenter,Kristi; Parker, Jerry A; Powers, Tim Bridge No. 247 over Big Alamance Creek on SR 3088 (Thacker Dairy Road) in Guilford Co; WBS No. 17BP.7.R.88; Part 2 400247_prm_package_buf.pdf; 400247_prm_package_wet.pdf Follow Up Flag: Follow up Flag Status: Completed Nicole J. Thomson Division Environmental Supervisor Assistant Division Environmental Office 919-754-7806 Mobile Nithomson2(cancdot.qov PO Box 14996 Greensboro, NC 27415-4996 ; ,� r M � � Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. •� • � �10RTg C9� o�� , � - T 0 MILLPOINT DESIG11l DATA ADT 2 Ol 5= 814 V = 45 MPH SUB REGIONAL TIER LOCAL � � � J \� � 1 I� �l// � � � � `�/ � 1S� � � � V 1� J� � � � � � � � � � � � � � � LOCATION: BRIDGE NO. 247 OVER BIG ALAMANCE CREEK ON SR 3088 (THACKER DAIRY ROAD) TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE WETLAN D AN D S U RFAC E V1/ATE R IMPACTS P E RJV11T PROJECT LE11lGTH LENGTH ROADWAY TIP PROJECT LENGTH STRUCTURE TIP PROJECT TOTAL LENGTH TIP PROJECT � � � 0.108 MI LES 0.025 MILES 0.133 MILES Prepared In the Offlce of Hatch Mott MacDonald for DI T�ISI01� 7 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 2012 STANDARD SPECIFICATIONS TIM JORDAN, PE LETTI11lG DATE: PROJECT ENGINEER GALEN CAIL PE HYDRA ULICS ENGINEER 11rCDOT COIVTACT: TIM POWERS, PE DIVISION BRIDGE PROGRAM MANAGER STATE S'd°A°d'E I�ROJEC'Il' F$EFERENCE NO. S]HEE'Il° TOTAL NO. SHE�TS �o `�J o ����o�o�o�l� � 9TATE �ROJECT NO. ]F..�. PROJ. NO. DESCI3I]PTION BUFFER DRAWING SHEET OF 9�, '�'O � � 0 N � Z .• � Q Z DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PLA11lS PREPARED B Y: Hatch Mott MacDonald PO Box 700 Fuquay-Varina9 NC 27526 (919) 552-2253 (919) 552-2254 (Fax) wwwohatchmottocom LICENSE NO. F-0669 DETAIL A STANDARD BASE DITCH ( Not to Scale) Natural F �j Natural Ground X�ST/�C p ���5'��� Ground d Geotextile B Min. D= VAR Ft. Max. d = 3 Ft. *When B is < 6.0' B= VAR Ft. Type of Liner= CLASS I Rip-Rap -L- STA. 14 + 00 TO 14 + 75 LT -L- STA. 15 + 13 TO 15 + 55 LT DETAIL C RIP RAP AT EMBANKMENT ( Not to Scale) 10'min. Ditch �.0'min. 1 Grade �, 1'5 GEOTEXTILE � Type of Liner= CL I Rip—Rap -L- STA. 14 + 80 TO 15 + 02 RT 620 �• 1 • � � � 590 � � � � � � � � 580 � � � � � � � z � ��� 570 � � � ��� ��� w {� w � � � � � Q �n c� z ���� ' ��'I��p'���r/n�w�(� 560 W Vl Uf V 1 � �rn� IIrnT� ��r�n i Q VS IIJ VJ o��� ���� � — — � c�r � �» -L- STA. 14 + 63 TO 14 + 80 RT T— — o SR 3088 �THACKER DAIRY RDJ TO MILLPOINT RD � I I , \T� �/ � � � P ExISTING R/W � �—� E�P � \ I � � � �1 � I� I � I� � ' N� DAVID R. HOBSON and wifie� LINDA B. HOBSON DB 4083 PG 1063 PB 102 PG 72 GARY R. KUZMA and wife. CATHERINE R. KUZMA DB 4907 PG 2077 �� _ 48 _"W�D�_ 15" HDPE � — --�'— �� �� � � � � � WELL NICHOLAS LITTLE and spouse, ELIZABETH RENEE LITTLE DB 7636 PG 976 I _-- _ _ �__--- _i �i i i i i__- _ . i- ._ __ � ���i_-- i- ��� � � I I I I I I� I l l i�_ l i l l l l I � ��� --_-_ i �� � � �� { � ` , -. �, - _ ,, i � — - -- � � � � � 10 11 BEGIN PROJECT� BEGIN GRADE i STA. 11 + 50.00 I EL = 605.10' � ------- _--_J 12 ARMOR EXISTING DITCH SEE DETAIL A EST. 65 TONS RIP RAP EST.80 SY GEOTEXTILE � � �� �� ARMOR EXISTING DITCH EXCAVATION SEE DETAIL A LIMITS EST. 30 TONS RIP RAP EST.40 SY GEOTEXTILE � CLASS II RIP RAP UP TO SHOULDER ELEV. (TYP.) \ \ (STRUCTURE PAY ITEM) BASE DITCH 2SFD J� z SEE DETAIL B �' � EST. b TONS RIP RAP � \ � EST.10 SY GEOTEXTILE ��j RIP RAP EMBANKMENT S � `� SEE DETAIL C � O � '�, EST.10 TONS RIP RAP �� � � EST.15 SY GEOTEXTILE �� � \ �. � � � � 2 , �`� � � � EC LEONDAS RAY NEESE �� �. DB 4870 PG 444 �� ��FF=589,62 � �o� �,�,� �� � � G' � � � NOTE: ` ` TYPE—III ANCHOR UNITS ON � �` �� �� DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER 5 0' 0' 50' GRAPHIC SCALE �� � � \�\ \� JAMES MICHAEL KIVETT DB 4395 PG 1188 ROBERT N. SHARPE, III DB 7341PG 2077 � \�r � �� � \ \ \ � �IOV�\ � \� � � \ � \ \\ ��� � �r \ � /� � \�, \� T\ � O�� a ✓��i�ti '�o DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ,Hatch Mott Po gox ,00 �.► MacDonald F�Q�°y-�°r'�°° N� 2�5z6 wwwehatchmott.com \ ALL FOUR BRIDGE CORNERS � \� � � � � , � � � \ �\ `.-' � �i DRAINAGE NOTES: ��n-� � �\ � . �;�5 � DO NOT USE CONCRETE (411 TO 412) `� ,; � MINIMUM SLOPE ON ALL PIPES IS 0.5% `' � i----- ----� _ _ :_. _ _. _ _.__ . . i �- -1----i_i i- � i- -i_ I I _-i i i i i- - i- ! - �- ---_- i - i _,_-!--�--- -- - -i _- i � i --- -_i_. _. - _i-- i _ . i- i-_ - i I - � -- — 0 0 _ � � � _ -L- � � _ _ __ _ _ ___ _ _ _ _ _ _ _ _ __ __ _ ___ __ _ _ _ _ _ __ _ ___ __ _ __ _ _ =o ��� �� � � � � � � � � �� � � i �_, i � i i �i ii i i� � i i i i i i P = 13+00. � ii EL = 595.21' i � VC = 24�� , K = 40 r�J6S� 9-33i 13 F� BRIDGE � STA. 15+12 -L- �-� : � THREE SPAN 24" PCCS -- 1@ 30'; 1@ 70'; 1@ 30'; SKEW 75 - - I � ELEV. = 593.88' � � � �. i __ i ��. � � I � REMOVE I I I � i I j EXISTING - - - -. � BRIDGE j -- � —�0.6256% ; EXCAVATE TO ELEV 583.0' ' NORMAL WS �i ELEV. = 577.8' 14 t EXCAVATE TO ELEV 583.0' CLASS II RIP R,o 3.5' KEY-IN DE SLOPE 1.5:1 (2 (NORMAL TO � (STRUCTURE PA i ' ' � END PROJECT i END GRADE STA. 18 + 50.00 EL_ = 595.74'_ u P = 17+30.00i � EL = 592.52' i ° VC = 210' i � � �� -_ 64 __J _— __. ,_— — _— r����������� �J 1 KUI. I UI(C I'HT I I tM) 15 16 17 18 19 BRIDGE HYDRAULIC DAT A DESIGN DISCHARGE + = 4300 CFS DESI�N FREQUENCY = 25 YRS DESIGN HW ELEVATION = 59/.2 FT BASE DISCHARGE = 8700 CFS BASE FREQUENCY = l00 YRS BASE HW ELEVATION = 596.66 FT OVERTOPPING DISCHARGE = 6000 CFS OVERTOPPING FREQUENCY = 25-50 YRS OVERTOPPING ELEVATION = 593e1 FT 20 l3, 20/5 � FT ` I I I I ������J 620 I 610 1 � � � 590 1 .� . 570 1 560 J �, ���„�\ � , � � j� :;�� \���� /� � �` � �' � / � �;�„ \�\\ � , �- " ,� ���� � � � � �, . , �� �� � �A` � ARMOR EXISTING DITCH 'j \ - V�QODS EXCAVATION SEE DETAIL A � LIMITS EST. 30 TONS RIP RAP GARY R. KUZMA and wife. ARMOR EXISTING ` C?ITCH ,,� �\ SEE DETAIL A � EST. 40 SY GEOTEXTILE -L- STA. 14+00 TO 14+75 LT -L- STA. 14+63 TO 14+80 RT CATHERINE R. KUZMA EST. 65 TONS RIP RAP ' -L- STA. 15+13 TO 15+55 LT DB 4907 PG 2077 EST. 80 SY GEOTEXTILE �`\ ` � CLASS II RIP RAP , �, — UP TO SHOULDER � � �ELEV. (TYP.) DETAIL C RIP RAP AT EMBANKMENT ( Not to Scale) 10'min. Ditch �.0'min. 1 Grade �, 1'5 GEOTEXTILE � Type of Liner= CL I Rip-Rap -L- STA. 14 + 80 TO 15 + 02 RT 620 �• 1 • � � � 590 � � � � � � � � 580 � � � � � � � z � ��� 570 � � � ��� ��� w {� w � � � � � Q �n c� z ���� ' ��'I��p'���r/n�w�(� 560 W Vl Uf V 1 � �rn� IIrnT� ��r�n i Q VS IIJ VJ o��� ���� � - - � c�r � �» -' � � � (STRUCTURE PAY ITEM) �� , ,\ � '; � �� � �� �� ' � � � �� � �. �, �� � � �� � w000 c \ � � ,.`` �\�� � . y \ \ i ��_�_`.. , . \ � WOODS ' � �� ` , \ � 1 �i� I j� -- �'`-`�`' p T PA ERI �.. \.. � � - � ,� —� ExisTin�c rw � ��' � � �r r�, -__ --�'��-�r�'� / � ''` � � -"` �r 11� �— � / � —�� �- -- — - - - — I ,- � <.. krr��,� �T I I N_ F---_-- �— � _ = � � _ �' . — T -- --_ : ; � - � �y-,—�. i� �. — — — --_ � _ _ � � . � �� F� � � ----_-- --_ I ,� \ � — _ \ — o I SR 3088 �TNACKER DAI�?Y RQJ 2Q' PAVED � ~ ��`- ��/. F � � � • 1_ � TO MILLPOINT RD � � N �__TL-2 � � � � � � � -; --- N N � _ _ �r\ � 4 J`� 5�� RCP�r \— � RETAIN N N o o � — _.._ F — �- � — . �. DAVID R. HOBSON and wifie� LINDA B. HOBSON DB 4083 PG 1063 PB 102 PG 72 ` � � � 0 �s�; : -r"-� � \ � � � � �,. ---_ � \ _ - r�--_ � 1 . _ _ � \ I WOODS � i ���j' a .� �(�7�1i11]� - �+ � � 1 I� I.l 1. L_�� n-�: :',� �\� � _� � , � � °� � �� �� DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER 5 0' 0' 50' GRAPHIC SCALE 3 ROBERT N. SHARPE, III DB 7341PG 2077 � � � . � , � .� � - .. . , � • � � - � - " � ��- . • � . �- " �% � �is�`i���►��` 4 _►�i►•��.'�'� �i,��- �aR. � ► � � � � � � 'y � . a -�:! u�,��i � ,�i. -�i�i. :����� ����.�a` i � `, ��,s . �- �, t='vf��.. x. ■ �-�� /� • � �� � � . � I I � �.�i � ♦ j� p '�.% . ;;� ., ,. � ,. ;, a����i ,� � ' .. � il '• i' ;- `�-' ` �, ►�����- � � ' ��, ��i�����'� AO�����/ - r"�i�+w , ► ' `���! '��i - �� .� NICHOLAS LITTLE and spouse, ELIZABETH RENEE LITTLE DB 7636 PG 976 --_-_ i �� � � �� { � ` , -. �� - _ ,, i � — - -- � � � � � 10 11 BEGIN PROJECT� BEGIN GRADE i STA. 11 + 50.00 I EL = 605.10' � ------- _--_J 12 � � _ —�_ �_ � R � � - _ , r � � - � .` .. ���. BEG7N SBG +24 __ -- - �`.\ � �. — __ _ _ � \ m � '� \ END �BG +33 �, WOODS _ ,=, -- - \ \', \ m� � � 15,, R l CLASS B RIP I�AP- \ m � I EST.2 TONS � �' � EST. 9 SY GEOTEXTILE ��,mg- — \ �� � WjELBOWS f / / �� � � �' . � \ ,. \ . \ \ \ ' ��, � �1\ ' \� \�S ESLTA 1ST�IP jtAP ,� A O�Q � � � � � � � �\ ESl'. 5 �Y ��OTEXTILE � � � � \�� �` �\ �� ; � � \ � �_� � \� � _ /�/, , BASE DITCH 2SFD � �� �� �� � z� ��,� � SEE DETAIL B ` �� � �' �t � �`�� � �� EST. b TONS RIP RAP ��� � S� �' �` �' /� CLASS B RIP RAP EST. 10 SY GEOTEXTILE �� ��� � �! �� �� � � � ��� EST. 5 TONGEOTEXTILE RIP RAP EMBANKMENT � \� \ � � SEE DETAIL C � � ��� � , �',� � �� �, �� � � EST.10 TONS RIP RAP �� � � \�`��'�� � � ����, �� \F, . \ \ � -- �o O� , '` g� �o \' \\ � � �, _� \2 �r�� \ �,-� IS, \ � \� � .� J \ � � � g„Rc � ` � � � .,, / ' �' , - R nnod\ ,_ -_ J , � �� � � / i � � i � � � �-� � � ' +��w000s �� \ . � � �� , � , � � , ,� � \ �� � � � � � l�� �� i j �� �� �. � � � � �T� �XiST� � � �.� \ \\\G R � � � � � .� \ � � - � ,� A � El P , - • � �� \ � o0 �� \ \ � �. \ � < T � � ✓ � O o\ �a DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ,Hatch Mott Po gox ,00 �.► MacDonald F�Q�°y-�°r'�°° N� 2�5z6 wwwehatchmott.com 0� n�• "V PE RMIT D RAWI N G SHEET OF EST. 15 SY GEOTEXTILE � " � � �� � � � \ C \ � ; � � , � � '�� \'- � / � Fk�� O ✓��i,9� �-- � � \ �'�� t +, � ��, 4 T��� R �a � �� �'�� � � � � �. j � � �1 � � ,i � �a' �� ` �� � ��� � ' � JAMES MICHAEL KIVETT 2 '� , �� �a � � � ��. � �;�� �� � � DB 4395 PG 1188 �,� �� �� �,�,'�/"� LEONDAS RAY NEESE �� � � � ,�. � � � '� � V'/ ' DB 4870 PG 444 ��� � ��� `�FF=589e6�2 ��� ,; � , \ � � \ / J \\�\ \\ \ �\� � � � � � , �\ � , ,� ��, �� ,A\� � � � ��� , NOTE: ��` �`� � �'�� � � � �,''' . � � � �����; '���� � � TYPE-III ANCHOR UNITS ON � i ��� � �� ,� � � � � \ �� ���� ALL FOUR BRIDGE CORNERS ���� __ ��� ��� �� � \ ��� � � �� " � . � , �. , , �\. , � � , --j,; ' � �� ����� DRAINAGE NOTES: � �; �� � :'% �� �� � ��� � � ����� � � DO NOT USE CONCRETE 411 TO 412 ` � ��� �� � � � : � MINIMUM SLOPE ON ALL (PIPES IS 0.5%\�\ `' � \��6\ \� �'� � �� ► � � �,_ � ,� ��� __ ,_, , � � � _, _ �-----------� i � _ � i- - [ -_ � �- -1----i_� �_-� i_ _�_ 0 0 __i i i i L - -i �- --- -i - i - � _ -L- � _ _ _ _ _ __ _ _ ___ _ _ _ _ _ _ _ _. =o ��� __ �� � � � � i �_, i � i i i P = 13+00. � ii EL = 595.21' i � VC = 24�� , K = 40 r�J6S� 9-33i 13 F� BRIDGE � STA. 15+12 -L- �-�� : � THREE SPAN 24" PCCS -- 1@ 30'; 1@ 70'; 1@ 30'; SKEW 75 - - I � ELEV. = 593.88' � � � �� �, i __ � � � I � � � REMOVE I I I � I I i I j EXISTING - - - -. � BRIDGE j -- � —�0.6256% ; EXCAVATE TO ELEV 583.0' ' NORMAL WS �i ELEV. = 577.8' 14 EXCAVATE TO ELEV 583.0' CLASS II RIP R,o 3.5' KEY-IN DE SLOPE 1.5:1 (2 (NORMAL TO � (STRUCTURE PA i ' ' � END PROJECT i END GRADE STA. 18 + 50.00 EL_ = 595.74'_ u P = 17+30.00i � EL = 592.52' i ° VC = 210' i � � �� -_ 64 __J _— __. ,_— — _- r����������� �J 1 KUI. I UI(C I'HT I I tM) 15 16 17 18 19 BRIDGE HYDRAULIC DAT A DESIGN DISCHARGE + = 4300 CFS DESI�N FREQUENCY = 25 YRS DESIGN HW ELEVATION = 59/.2 FT BASE DISCHARGE = 8700 CFS BASE FREQUENCY = l00 YRS BASE HW ELEVATION = 596.66 FT OVERTOPPING DISCHARGE = 6000 CFS OVERTOPPING FREQUENCY = 25-50 YRS OVERTOPPING ELEVATION = 593e1 FT 20 l3, 20/5 � FT ` I I I I ������J 620 610 � � � 590 .� . 570 560 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (tt) (tt) (tt) 1 15+10 -L- Embankment Rip Rap <0.01 <0.01 28 30 TOTALS: 28.000 30.000 Revised 3/31/05 k li,t;h7� �f)' North Carolina Department of Transportation � :5r1[ltltlbViiTf C M ,.._, Highway Stormwater Program �j STORMWATER MANAGEMENT PLAN (Version 2.02; Released April 2015) FOR NCDOT PROJECTS WBS Element: 17BP.7.R.88 TIP No.: County(ies): Guilford Page 1 of 1 General Project Information WBS Element: 17BP.7.R.88 TIP Number: Project T pe: Bridge Replacement Date: 1/6/2016 NCDOT Contact: Galen Cail Contractor / Designer: NCDOT Address: Hydraulics Units Address: 1020 Birch Ridge Drive Ralei h, NC 27610 Phone: 919-707-6711 Phone: Email: cail ncdot. ov Email: Cit ITown: Count ies : Guilford River Basin s: Cape Fear CAMA County? No Wetlands within Project Limits? No Pro'ect Description Pro'ect Len th lin. miles or feet : 700 ft Surroundin Land Use: Rural, agricultural, some residential Proposed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 0.4 ac. 0.3 ac. Typical Cross Section Description: 2 lane road with 10' travel lanes, 4' grassed shoulder without guardrail, and 7' with 2 lane road with 10' travel lane. guardrail Annual Avg Daily Traffic (veh/hr/day): Design/Future: 814 Year: 2015 Existin : Year: General Project Narrative: The project consists of replacement of Bridge #247 on SR 3088 (Thacker Dairy Rd) over Big Alamance Creek. The existing structure is a three span bridge (1 @ 41'; 1@ 40'; 1 (Description of Minimization of Water @ 41' - 122' total length) with steel plank deck on I-beams. The proposed structure will be a three span bridge (1 @ 30'; 1@ 70'; 1@ 30' - 130' total length) with 24" Cored Quality Impacts) Slabs. The existing bridge is an open deck with direct discharge into the creek across entire reach of structure. The proposed bridge will have no deck drains and drainage will be conveyed into an that will outlet through vegetation prior to entering the buffer. Existing ditches in the NE, NW and SW quads are presently unstable and eroded. Propose to armor these existing ditches with rip rap within R/W to stabilize. There are 2 proposed outfalls on the project in the SW and SE quads that flow through vegetation. In the SW quad road drainage ties to a modified concrete flume. In the SE quad road drainage ties to an 2GI inlet pipe system. Drainage area to 2GI inlet structure = 0.13 ac Q2=0.5cfs; Q10=0.7cfs V2=1.4fUs; V10=1.5ft/s Drainage area to Modified Concrete Flume=0.03 ac. Q 10=0.1 cfs V 10=0.4ft/s Waterbody Information Surface Water Body (1): Big Alamance Crk NCDWR Stream Index No.: 1-1 - 1 NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV (WS-IV) Supplemental Classification: Nutrient Sensitive Waters (NSW) Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Jordan Lake Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) •� • � �10RTg C9� o�� , � - T 0 MILLPOINT DESIG11l DATA ADT 2 Ol 5= 814 V = 45 MPH SUB REGIONAL TIER LOCAL � � � J \� � 1 I� �l// � � � � `�/ � 1S� � � � V 1� J� � � � � � � � � � � � � � � LOCATION: BRIDGE NO. 247 OVER BIG ALAMANCE CREEK ON SR 3088 (THACKER DAIRY ROAD) TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE BU FFER IMPACTS PERMIT PROJECT LE11lGTH LENGTH ROADWAY TIP PROJECT LENGTH STRUCTURE TIP PROJECT TOTAL LENGTH TIP PROJECT � � � 0.108 MI LES 0.025 MILES 0.133 MILES Prepared In the Offlce of Hatch Mott MacDonald for DI T�ISI01� 7 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 2012 STANDARD SPECIFICATIONS TIM JORDAN, PE LETTI11lG DATE: PROJECT ENGINEER GALEN CAIL PE HYDRA ULICS ENGINEER 11rCDOT COIVTACT: TIM POWERS, PE DIVISION BRIDGE PROGRAM MANAGER STATE S'd°A°d'E I�ROJEC'Il' F$EFERENCE NO. S]HEE'Il° TOTAL NO. SHE�TS �o `�J o ����o�o�o�l� � 9TATE �ROJECT NO. ]F..�. PROJ. NO. DESCI3I]PTION BUFFER DRAWING SHEET OF 9�, '�'O � � 0 N � Z .• � Q Z DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PLA11lS PREPARED B Y: Hatch Mott MacDonald PO Box 700 Fuquay-Varina9 NC 27526 (919) 552-2253 (919) 552-2254 (Fax) wwwohatchmottocom LICENSE NO. F-0669 DETAIL A STANDARD BASE DITCH ( Not to Scale) Natural F �j Natural Ground X�ST/�C p ���5'��� Ground d Geotextile B Min. D= VAR Ft. Max. d = 3 Ft. *When B is < 6.0' B= VAR Ft. Type of Liner= CLASS I Rip-Rap -L- STA. 14 + 00 TO 14 + 75 LT -L- STA. 15 + 13 TO 15 + 55 LT DETAIL C RIP RAP AT EMBANKMENT ( Not to Scale) 10'min. Ditch �.0'min. 1 Grade �, 1'5 GEOTEXTILE � Type of Liner= CL I Rip—Rap -L- STA. 14 + 80 TO 15 + 02 RT 620 �• 1 • � � � 590 � � � � � � � � 580 � � � � � � � z � ��� 570 � � � ��� ��� w {� w � � � � � Q �n c� z ���� ' ��'I��p'���r/n�w�(� 560 W Vl Uf V 1 � �rn� IIrnT� ��r�n i Q VS IIJ VJ o��� ���� � - - � c�r � �» -L- STA. 14 + 63 TO 14 + 80 RT T— — o SR 3088 �TNACKER DAIRY RDJ TO MILLPOINT RD � � � , „ I I S 87 20 OOe7 E , \T� �/ � � � P ExISTING R/W � �—� E�P � \ I � � � �1 � I� I � I� � ' N� DAVID R. HOBSON and wifie� LINDA B. HOBSON DB 4083 PG 1063 PB 102 PG 72 GARY R. KUZMA and wife. CATHERINE R. KUZMA DB 4907 PG 2077 �� _ 48 _"W�D�_ 15" HDPE � — --�'— �� �� � � � � � WELL NICHOLAS LITTLE and spouse, ELIZABETH RENEE LITTLE DB 7636 PG 976 I _-- _ _ �__--- _i �i i i i i__- _ . i- ._ __ � ���i_-- i- ��� � � I I I I I I� I l l i�_ l i l l l l I � ��� --_—_ i �� � � �� { � ` , -. �, - _ ,, i � -- -- � � � � �� 10 11 BEGIN PROJECT� BEGIN GRADE i STA. 11 + 50.00 I EL = 605.10' � ------- _--_J 12 ARMOR EXISTING DITCH SEE DETAIL A EST. 65 TONS RIP RAP EST.80 SY GEOTEXTILE � � �� �� ARMOR EXISTING DITCH EXCAVATION SEE DETAIL A LIMITS EST. 30 TONS RIP RAP EST.40 SY GEOTEXTILE � CLASS II RIP RAP UP TO SHOULDER ELEV. (TYP.) \ \ (STRUCTURE PAY ITEM) s=0.3% �uv � � � � • U' BASE DITCH � 2SFD z SEE DETAIL B � �' � EST. b TONS RIP RAP � \ � EST.10 SY GEOTEXTILE ��j RIP RAP EMBANKMENT S � `� SEE DETAIL C � O � '�, EST.10 TONS RIP RAP �� � � EST.15 SY GEOTEXTILE �� � \ �. � � � � 2 , �`� � � � EC LEONDAS RAY NEESE �� �. DB 4870 PG 444 �� ��FF=589,62 � � �o� �,�,� �� � � G' � � � NOTE: ` ` TYPE—III ANCHOR UNITS ON � �` �� �� K������X� ALLOWABLE IMPACTS ZONE 1 pS �\\\\\ ALLOWABLE IMPACTS ZONE 2 ROBERT N. SHARPE, III DB 7341PG 2077 50' 0' 50' GRAPHIC SCALE �� � � \�\ \� JAMES MICHAEL KIVETT DB 4395 PG 1188 � \�r � �� � \ \ \ � �IOV�\ � \� � \S \ � \ o � �' � � \ �T \ � �F �\� /� �� � � , � DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ,Hatch Mott Po gox ,00 �.► MacDonald F�Q�°y-�°r'�°° N� 2�5z6 wwwehatchmott.com 0� n�• "V / EIP T� \ o� ✓��i,9� \ '�o ALL FOUR BRIDGE CORNERS � \� � � � � , � � � \ �\ `.-' � �i DRAINAGE NOTES: ��n-� � �\ � . �;�5 � DO NOT USE CONCRETE (411 TO 412) `� ,; � MINIMUM SLOPE ON ALL PIPES IS 0.5% `' � i----- ----� _ _ :_. _ _. _ _.__ __ i �- -1----i_i i- � i- -i_ I I _-i i i i i- - i- ! - �- ---_- i - i _,_-!--�--- -- - -i _- i � i --- -_i_. _. - _i-- i _ . i- i-_ - i I - � -- — _ 0 0 _ � � � _ -L- � � _ _ _ _ __ _ _ ___ _ _ _ _ _ _ _ _ __ __ _ ___ __ _ _ _ _ _ __ _ ___ __ _ __ _ _ _ =o ��� �� � � � � � � � � �� � � i �_, i � i i �i ii i i� � i i i i i i P = 13+00. � ii EL = 595.21' i � VC = 24�� , K = 40 r�J6S� 9-33i 13 F� BRIDGE � STA. 15+12 -L- �-� : � THREE SPAN 24" PCCS -- 1@ 30'; 1@ 70'; 1@ 30'; SKEW 75 - - I � ELEV. = 593.88' � � � �. i __ i ��. � � I � REMOVE I I I � i I j EXISTING - - - -. � BRIDGE j -- � —�0.6256% ; EXCAVATE TO ELEV 583.0' ' NORMAL WS �i ELEV. = 577.8' 14 t EXCAVATE TO ELEV 583.0' CLASS II RIP R,o 3.5' KEY-IN DE SLOPE 1.5:1 (2 (NORMAL TO � (STRUCTURE PA i ' ' � END PROJECT i END GRADE STA. 18 + 50.00 EL_ = 595.74'_ u P = 17+30.00i � EL = 592.52' i ° VC = 210' i � � �� -_ 64 __J _— __. ,_— — _— r����������� �J 1 KUI. I UI(C I'HT I I tM) 15 16 17 18 19 BRIDGE HYDRAULIC DAT A DESIGN DISCHARGE + = 4300 CFS DESI�N FREQUENCY = 25 YRS DESIGN HW ELEVATION = 59/.2 FT BASE DISCHARGE = 8700 CFS BASE FREQUENCY = l00 YRS BASE HW ELEVATION = 596.66 FT OVERTOPPING DISCHARGE = 6000 CFS OVERTOPPING FREQUENCY = 25-50 YRS OVERTOPPING ELEVATION = 593e1 FT 20 l3, 20/5 � FT ` I I I I ������J 620 I 610 1 � � � 590 1 .� . 570 1 560 J BUFFER IMPACTS SUMMARY IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT STRUCTURE SIZE / STATION ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. TYPE (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ftZ) (ftz) (ftZ) (ftz) (ftz) (ft2) (ftZ) 1 Embankment 14+05 To 16+15 -L- X 166.0 793.0 959.0 1 130' bridge 14+42 To 15+82 -L- X 3907.0 516.0 4423.0 TOTALS: 4o�s.o 1309.0 5382.0