I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ® Riparian or Watershed Buffer Rules
® Section 10 Permit ^ Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ^ Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: 13
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ^
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ^
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina. Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), ch D ~ ~ ~~ n
v
II. Applicant Information
FEB 1 1 2008
1. Owner/Applicant Information
Name: Adams Farm Community Association v~aNO s~ow~wA R sR,
Mailing Address: c/o James Thompson Property Manager, Post Office Box 77726,
Greensboro, NC 27417-7726
~ Telephone Number:(336) 455-1582 Fax Number:(336) 638-9366
°° E-mail Address jthompson010@triad.rr.com
0
° ~ z 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
~ ° ~ must be attached if the Agent has signatory authority for the owner/applicant.)
~, Q,.,
~ Name:
` Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Updated 11/1/2005
Page 5 of 13
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is cleazly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no lazger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans aze
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps aze provided.
1. Name of project: Adams Farm Lake Bank Stabilization
2. T.I.P. Project Number or State Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN): 56-1585797
4. Location
County: Guilford Nearest Town: Greensboro
Subdivision name (include phase/lot number): Adams Farm
Directions to site (include road numbers/names, landmazks, etc.): High Point Rd to Mackey
Road, Mackey Road to right on Adams Farm Pazkway Adams Farm Parkway to Realty
Office/Club House entrance, dam and lake behind clubhouse.
5. Site coordinates (For lineaz projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 36.0244 °N 79.9040 °W
6. Property size (acres): Lake is approximately 17 acres in size
7. Name of neazest receiving body of water: Adams Farm Lake/Bull Run Creek
8. River Basin: Cape Feaz
(Note -this must be one of North Cazolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: The project site consist of the lake banks on the west end of
Updated t 1/1/2005
Page 6 of 13
the lake. The property surrounding the lake eg_nerally consist of single-family homes, a
clubhouse with pool and tennis courts, and a real estate office.
10. Describe the overall project in detail, including the type of equipment to be used: The
project consists of the placement of a keystone segmental block retaining wall (block size
18"b~) along~the eroded lake banks on the western end of the lake. The lake level will be
lowered about 18", a wall footing 24" wide and 12 to 18" deep (below the exposed mud line
will be excavated with amini-excavator, the footing` excavation will be lined with a
geotextile, approx. 8" of washed stone will be placed on the fabric with a bobcat loader, then
the blocks will be stacked and secured according~to manufacturer's specifications. A
minimum of 4" of block will be present below the mud line, and the maximum wall height
above the mudline will be 3.5'. The wall will vary in hei t due to variation in hei t of the
eroded lake bank.
11. Explain the purpose of the proposed work: Erosion has created vertical erosion Ovals along
the lake and in places has undermined lake banks and trees. The property immediately
adjacent to the lake is common property (owned by the entire community). This community
property is disappearing into the lake at an alarmin rg ate (up to 1' per yeaz).
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. A permit was issued and approved for this type of work on October
2006.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
We will request additional approvals in the future to install similaz retaining walls around the
majority of the lake. This work is not being included in this application because we don't know
exactly where we would like to place the next sections.
Updated 11/1/2005
Page 7 of 13
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and cleazly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: 'The presence of the dam
downstream of the project and all work being_performed while no water is going over the
weir means no negative impact to the lake or Bull Run Creek The prevention of erosion at
the lake banks due to the construction of walls should have a positive impact on the lake and
Bull Run Creek.
2. Individually list wetland impacts. Types of impacts include, but aze not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
sepazately list impacts due to both structure and flnndinu_
Wetland Impact
Site Number
indicate on
(~ map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
es/no) Distance to
Nearest
Stream
(linear feet) Area of
Impact
(acres)
Not Applicable
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: ZERO,
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but aze not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
Updated 11/1!2005
Page 8 of 13
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multiply length X width, then divide by 43,560.
Stream Impact
Number
(indicate on )
Stream Name
Type of Impact
Perennial or
Intermittent? Average
Stream Width
Before Im act Impact
Length
(linear feet) Area of
Impact
(acres)
Not Applicable
Total Stream Impact (by length and acreage)
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dyed in ,flooding, drainage, bulkheads, etc.
Open Water Impact
Site Number
(indicate on ma)
Name of Waterbody
(if applicable)
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres
Wall footing excavation 0.05 Adams Farm Lake Lake
Fill behind wall 0.07 Adams Farm Lake Lake
Total Open Water Impact (acres)
6. List the cumulative impact to all Waters of the U.S. resulting from the project:
Stream Impact (acres): 0
Wetland Im act (acres): 0
Open Water Impact (acres): .12
Total Impact to Waters of the U.S. (acres) .12
Total Stream Impact (linear feet): 600
7. Isolated Waters
Do any isolated waters exist on the property? ^ Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
Not Applicable
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Updated 11/1/2005
Page 9 of 13
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond:
VII. Impact Justification (Avoidance and Minimization)
Expected pond surface area:
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
fmancial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. The lake level will be below the
top of the dam overflow weir during wall construction to minimize and disturbed sediment from
entering Bull Run Creek. The wall will be placed slightly on the lake side of erasion walls
wherever possible to limit disturbance of the lake banks.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina (see DWQ website for most current
version.).
Updated 11/1/2005
Page 10 of 13
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/lineaz feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
NO MITIGATION PROPOSED
2. Mitigation may also be made by payment into the North Cazolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regazding the application process for the NCEEP, check the NCEEP
website at htt~://www.nceep.net/pages/inlieureplace.htm. If use of the NCEEP is proposed,
please check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (lineaz feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount ofNon-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federaUstate/local) funds or the use of
public (federaUstate) land? Yes ^ No
2. If yes, does the project require prepazation of an environmental document pursuant to the
requirements of the National or North Cazolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No ^
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
Updated 11/1/2005
Page 11 of 13
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ^ No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
,~ Impact Required
Zone ,~,~,,,,,,o F e+, Multiplier ~,r;.;,..,*;~„
I (NOT APPLICABL I 3 (2 for Catawba) I N/A
2 1.5
Total I ~ I 1
* Zone 1 extends out 30 feet perpendiculaz from the top of the neaz bank of channel; Zone 2 extends an
additiona120 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260. Riparian buffer restoration: All disturbed
areas will be planted with appropriated grasses. Areas adjacent to project azea that had lack
of vegetation due to erosion condition present prior to wall construction will also be planted
with grasses.
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. NOT APPLICABLE
XIT. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
NOT APPLICABLE
Updated 11/1/2005
Page 12 of 13
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this anafter-the-fact permit application? Yes ^ No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ^ No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: The
area surrounding the lake is fully developed and no additional homes can be built.
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
(- 3-D
Applicant/Agent's Signature Date
s signature is valid only if an authorization letter from the applicant is provided.)
Updated 11 / 1/2005
Page 13 of 13
~-Z
~. i ~~ ~ `
;,~ 1 ~~ fr _ ~., ~~ ~ ~ ~~, ~ t
- 1 ~ ~ ~ -~ ~~, , _ ~.~ ~ . ~••
0
l it 1
- W / t
~~ ~~ ~ ~,
~ ~1
~~ o
• ~' , A o ~ ~ ~ w~/ ~~~ • ~1
(~ ,
`~ ~ Lam" ~- ~ ~ I r o
_ _ _ ~ 1,..a..
x
. ~ _ ~ ~ ""v"'. C1J .~,.'
^-.~
- ~~ ~ J
~~ ~ ~ :,
. E_,~ .
I _~l 9. i~ l' ~° ~ ~ -° ~_ --~ - ; _ ~ )~~ , ~ -:~-~- _C~~ , awl : , ~, ~ ~, ~
~~ -. ,
~_ • `
_ I ~ ~ , , ~ Va -1U ';_ y ( ) is - ~ ~~ / ` ~
_,. ~f ~ (//
. ~ .-~ ~ '~
;~
~ ~ ~.: ~~./~ ~,-, 1
.<<1 I 1I
~a J/f/ O . ~ _ \ ~ ~ I I ~ ~ i, ^ - 1U ~ l g5~ -, 1 ~ ) f , l , l V
v _
. 1
~~ /•/ xA,1 " ~ ~ .. ~ p , ~ °1 .' ~ C ~ / •'; • ~ ~_/"--.~ ~~,1 \ ~ ^ 5~ - ~/~ ~ ~ f~ r ~_ / ova=.
11 ~ ~ i yrr \ C~
1/' , 1111 „~' I/
~ ~.,•
V
~- ~ ` l . ~ ~ Y~..~• f (~ ~ ~ , ~ ~ ~~ ' of ~. , ~ ~ ; ~,~ ~ , ~'~_ .a
>> ` I ..
'' U ~ ~ ~ { ~, I I ~ (,~ (~~~
7
._ ~ ,.
,`` 4r~C~ , ~~`i°/l~~ 1 ~.:1•~\j • ~ ~'~ \,~f i~ iil ~ ~.-~' JI •:~~ • 1~'~,\ ~f`i~i)~1ii ~ f ,~ 1.1-I~Lt~( ~/.l ~ i •~~\'i~/, io~~ ll s
~~ ~ :~~`
1 L.--
1._=~, ~~
;_~_\~~`~~
,. ..`''J
t
-,. a
t - ~ / ~ ,'rye ~ l o
~`~ ~~~ ~~ ~ ; c~C~ ''III
~ \\ - ~~fy ' _ i' II ~ ii
\i ~ ~~-=-Ili, ~ I(
•. _ 1 ~i \ I~ .t
~~ ~` ~ I /
,~. \ ~ rl~
I- ~ ^~-.. Vii' y
~ c r t
i
_~~.
i
/
7 ~ f y"
G
a
~~
~~
z°
~~ ~ • I •.~~~`~~;;~ ;
~~=
, ~I ~
1~~t
~; ~~, ~~~ ~~ o
"z
I I i ca ~,c,~ ~ H
,~
U A
~/~ `,i; ~
~( t
om.`~
I Ala ,
1 m
~~ ~ ~ '~ ~~ ~ °~ w
~~
~~ ~~
,~ ~r ~ ;~
1.<
r ~
~~~~~~ ti
lL ~~ k 1'~~'' ) ~ CC
d,r H~
_ t ---.
~~~ ~~~
r ,~,~~~ ,
r ~~ ~ w o
~~, ~
- i l~
~~ _
l ! ,
•~:
- ~L ~~
,
l ( ~~ i_~ _--7~_ ~ ~ ~ ~~ ~~- ~1 7~ r I_
l\ ~y \1 ro
~ 5 ,
,
r'! I ELI 7\ ~ / ~, ~s ~ • ~~. ~L ; )yo ~•~eaJl ~ ~~ I t ~ 1 IZ
t ~ /
~>/~~ 1 ~.~ r , ~ ~ ~r / ~ (/~ s~ ~ I >; '•"~f ~~~ L _'~-`rte. ~ ~` ~~~ `I - ~ l~ ~ 1~~
.. _
-~ _
.."~~
.Q a C of ~~~.. .~ j ~_
'.~
'1 I ~-
lJ :i
ov
~a
x.
a
U
z
~,
w
o
W o .~
~
a o
N ~
~
~ II
~ o
;~
c~
I.
•~~;
o
~
~l ~ ~
~, ,
-- - a~i o r
N
~C R
.
' N z
~
, ~
~ o'
N~~
~ G
~~~
Q°~~
~J,
-~-z
y
_~
3
f
u
s
ti
~ ~ /~') ~gnn1 ~4f/v~ ~OM! ov/iJ¢!J ~' //'r1~D0 C.~a ~;o~/
/'1 ~4nn.t ~afM Lake RCT'4i~1i1/S w4l ( frarJ ~~
Gree„iS6ure ~0r~'~ (.Fro~~'~/y
~"NX 18"txtz"o ,Se;l 6gckf;/I
Cap ,9loa k
- - Gee qr; d -- - .. .r - - - - -
,. ~ '> 9
$`NX 1$`tx /z`'A Was6cd S•fewC ~ ,:, ~a
d~. yt n ~h ~~ (;
0 5
- -- Geebr~d „ - - - - - - ~~~
r
8 "Nx I g`L X la~4 W~.ctied S+eNe
Flock " . Sa
', ., ~~
/1/arr~ol ~okt Lav¢I - - Ge.yr~d - - - -
,,
~~ d f~
a N ~c !S`c x /Z"0 ~+hcd ~e~e 0 L
.tf bck ~ ~;
ti ~ V .
ko ,~
UX
c g" Warl,od sls~e Wrapped in
~d~ _ G¢o~'e1l'~'i% fab~n~
''II 11 r
1,4~e LAC' ~th1~g on' 6
1Nb~l 4,vlf r~c~ler!
~ ~ ~` i
~i ~~i ..'
Cross ' ScGTtor~ o~ ~Q7'AiNiniS In/k l~ ~0 ~/JTraG 7~or~
<ryp; cal >
su
~~
~~
E
M
d
l
,h
d
S
d
\~
G
~'
(/u~: Q~ockj a~~ kerJfi~/e ® Gf~r Co~np4c, JrSM«~I kr%f,c. a(o~k. are ~e,/,/eclled
aq •`p;rs° dNfpl;cd ly ~~e .Hq~h-Fti~f•k~e~. Cav,'~'•e.r ~~ a~ot~.r Ore f'((Pd a/~f(.
w~r~e 1 ,!~'o~e .