HomeMy WebLinkAbout20080284 Ver 1_More Info Received_20080211Letter of Transmittal To: Kim Garvey, US Army Corps of Engineers From: Kristen Rose 1~~' ~~ Date: February 1, 2008 ~~ Re: Sewerline Easement Crossing, Myrtle Grove Road, Wilmington C7 Q In response to your questions and request for further information on this project: -~ The Sewerline Easement Crossing Project is considered a separate project from the Myrtle Landing Residential Development because there are other landowners besides Biltmark Builders that are dependent on the sewerline being installed. If for any reason the Myrtle Landing project is delayed or not constructed, the sewerline would still be needed. For example, the large existing subdivision on Faulkenbeny Road needs to hook-up to the new lift station being constructed as part of the sewerline project, resulting in stream crossing numbers 3 & 4. Parcel R07900-006-000 will also need to tap into the sewerline, resulting in stream crossing number 2. The Myrtle Landing sewerline connection is resulting in stream crossing number 1. The sewerline easement is held by New Hanover County (Please see attached authorization letter from the county). Biltmark Builders has agreed to secure permitting, and pay for the bulk of the project since it is needed for the construction of their project. Also, it is not ahigh-priority project for New Hanover County given the existing sewerline repairs the county is facing. Biltmark Builders has the time and resources to construct the sewerline extension within a reasonable timeframe for the benefit of all the affected landowners. 2. Please find attached the requested cross-sections showing the ditch crossings for the Sewerline Easement Crossing project. If you have any other questions or need further information, please let me know. o ~~~~~~ a FEB 1 1 2008 ~~osro~ .Ianuary 31,2008 NE'6~V HAN(7VER. C~IJN'T~ Rngineering Department/Watercnd Setiver District 230 Government Center Drive • Suite I60 Wilmington, Norttr Carolina 2803 TELGPI-TONIJ (910)-798-7139 Fns {91 U) 798-7051 Ms. ICim Garvey, Project Manager Wilmington Regulatory Field Office U.S. Army Corps of Engineers P .O. Box 1890 Wrlrlllllgto2l, North Carolina 2$402-1890 RE: Site Access Authorization Sewerline Easement, Myrtle Grove Road New Hanover County, North Carolina Dear Ms. Garvey: Dennis J. lhn:rt lrrlcr•irrr Cururly [rt~Il1C'Cf James S~ Craig, PC Defxrh~ Courr(P Grtgirreer As the owner of the sewer•line easement, I am hereby authorizing you and/or other employees of the U.S. Army Corps of Engineer°s (USAGE), Wilmington Regulatory Field Office and the North Carolina Department of Envirorunental and Natural Resources Division of Water Quality (NC DENR DWQ) to enter and inspect the above-referenced project site as necessary. I understand that this site inspection will result in determination of the jurisdictional stattrs of the property's wetlands/surface waters under the USACElNC DWQ's Section 404/401 Regulatory Program. Please contact me if you need additional information. ~ ~T Jarnes S. Crain January 31, 2008 ~~~„ Own Signature) > (Print Name) (Date) 230 Government Center Drive X910) 798-7139 Suite 160 (Plrone No.) Wilmington, North Carolina 28403 (Address) BOTTOM OF TOP OF BANK -~ ~~- BANK a MANHOLE `~ 0 ~3S 3S 55 GRAVITY SEWER BOTTOM Of BANK PLAN VIEW T/lD llC DAAiii PROFILE VIEW i yr yr or,ivr~ POTENTIAL STREAM IMPACT T NOT TO SCALE