Loading...
HomeMy WebLinkAbout20141129 Ver 1_More Info Received_20150408US Army Corps of Engineers Asheville Regulatory Field Office Attn: Mrs. Tasha Alexander 151 Patton Ave, Room 208 Asheville, North Carolina 28801 -5006 April 8, 2015 NC Division of Water Resources, 401 and Buffer Permitting Unit Attn: Mrs. Jennifer Burdette /Mr. Zan Price 1617 Mail Service Center Raleigh, North Carolina 27699 -1617 Re: Creekside Village — Residential Development Nationwide 29 Permit Application Request — Second Additional Information Corps Action ID: 2014 -01670 / DWR Project #:14 -1129 Weaverville, Buncombe County, North Carolina Tasha /Jennifer /Zan: This letter and the attached document and figures are in response to the additional information request dated March 19, 2015 from DWR. A plan and typical detail for the proposed French drain system that will be constructed at Impacts # 1, 2, 3, and 4 are included for your review. A plan and typical detail for the proposed sewer crossing on the unnamed tributary to Reems Creek below the existing pond are included for your review. A detail for the flared pond outlet is included for your review. Civil Design Concepts, PA is currently coordinating with Buncombe County to get the Stormwater Management Plan revised and approved. A copy of the approval from Buncombe County will be submitted to your offices once it is received. Atlas requests that the Corps 404 nationwide permit be issued once the enclosed documentation has been reviewed. Atlas requests that the DWR 401 water quality certification be issued conditionally, to include that the approved Stormwater Management Plan shall be submitted to DWR before any impacts authorized by the 401 occur, once the enclosed documentation has been reviewed. Please contact me with questions concerning this package. Best regards, �" U d/ Jennifer L Robertson, President Copies To: Mr. Zan Price — NC DWR Swannanoa Office (digital copy) Mrs. Andrea Leslie — NC WRC Swannanoa Office (digital copy) Mr. David Earley — Sundog Development Company, LLC (digital copy) Mr. Mike Anderson — Civil Design Concepts (digital copy) ATLAS ENVIRONMENTAL, INC. 775 Haywood Road, Suite D; Asheville, North Carolina 28806 828- 712 -9205 (m) / 980 - 819 -7780 (o) / 980 - 819 -7876 (f) www.atlasenvi.com From Zan Price (NC DWR) — Additional Information Request Letter (March 19, 2015) Item 1 Please provide a detail and updated plan sheet for the proposed permanent stream impact (impact number S1). According to the submitted plans, the inlet of this pipe will be buried under several feet of fill. Please demonstrate how the existing baseflow will enter the proposed culvert pipe. Response Enclosed are a plan for the proposed French drain to direct existing base flows from the stream and wetlands into the proposed culvert and a detail for the French drain. The project contractor will coordinate with a geotechnical engineer to determine the necessary depth of the French drain. The French drain will consist of an 8" perforated drain pipe with No. 57 washed stone aggregate surrounding the drain pipe. The pipe and stone will be wrapped with 4" non -woven geotextile filter fabric and will be overlapped at least one foot. Item 2 Please provide a detail for the proposed sewer crossing temporary stream impact (impact number S2). Include the proposed riparian vegetation plan for the impacted area. Response Enclosed are a plan for the proposed sewer line crossing and a stream restoration detail. The stream bed will be temporary trenched in order to install the sewer line below the stream bed. Native materials will be used to re- establish the stream bed once installation is complete. The stream bed will be graded to the original contours. Filter fabric and rip -rap will be used to stabilize the stream banks. Excelsior will be used above the rip -rap, extended two feet beyond the top of bank, and buried twelve inches. The disturbance area will be seeded will native grasses. Item 3 The submitted plans show a new outlet pipe with outlet protection for the pond that will remain. Please explain if the re- constructed dam, new outlet pipe, and associated outlet protection will impact any additional length of stream compared to the existing condition. Please provide a detail for the pipe outlet protection. Response Enclosed is a plan for the pond outlet pipe which will consist of a flared end section and rip -rap apron. The rip -rap apron will provide for outlet protection. The ending width of the apron will be equal to the width of the receiving stream. Filter fabric or a filter blanket will be installed between the rip -rap and the soil foundation. The rip -rap apron will extend up the stream bank at least six inches to ensure stability. The re- constructed dam, new outlet pipe, and rip -rap will not result in any additional stream impact from the existing condition. Item 4 Please provide documentation of Buncombe County's approval of the updated stormwater management plan (SMP) for this project by providing EITHER: • A valid approval letter and one copy of the approved SMP (including plans and calculations), or • One set of stormwater plan details and calculations stamped as "Approved" by Buncombe County. Response Civil Design Concepts, PA is coordinating with Buncombe County in order to revise the stormwater management plan (SMP) and obtain approval of the SMP. Atlas is requesting that DWR issue the 401 water quality certification conditionally to include that the approved SMP shall be submitted to DWR before any impacts authorized by the 401 occur. A valid approval letter and one copy of the approved SMP with plans and calculations OR one set of the SMP details and calculations stamped as "Approved" by Buncombe County shall be submitted to Mr. Zan Price once received. N \° J \ \� v 0pIAI I \ \ \ ( \ 1 1 Cl I \ \ \ \ Cu `\ PROPOSED CULVERT \ \ PROPOSED FRENCH DRAIN \ \ \ \ \ \ \ \ \ \ TO DIRECT EXISTING BASE \ x'06 \ FLOWS INTO PROPOSED \ o I \ \ \ \ \ \ CULVERT. CONTRACTOR SHALL \ COORDINATE WITH GEOTECHNICAL \ \ \ \ \ I I I 1 \ \ \ ENGINEER FOR DEPTH OF FRENCH \ DRAIN. (SEE DETAIL) \ \ \ \ CD 1 1 \ \ \ \ \ \ \c'o � 1 CD o �- g \ \\ \\ \ \ \\ \ \ \ \\ \ \\ \ l nj \ I \ \ \ \\ \ \ \ \\ \\ \�190 \\ \ \\ \ \ I I I \ \ \\ \ \ \ \\ \ \�09 \ \\ \ \ \� �IIO I \ + M 126 \ i I 1 PRELIMINARY 0 15 30 60 NOT RELEASED FOR CONSTRUCTION 1 inch = 30 ft. PROPOSED FRENCH DRAIN BULLETIN FOR: 2005WANNANOA RIVER ROAD ASHEVILLE, NC 28805 PHONE (828) 252 -5388 FAX 28 252 -5385 GREEKSIDE VILLAGE EU 52 WAAYNESILLE, NC 28 6 NC WAYNENE C -"85 CIVIL DESIGN CONCEPTS, PA PHONE (82 , FA%(828(456 -5455 CDC PROJECT #11400 MARCH 2015 NCSELS LICENSE M C -2184 www. civildesignconcepts.com WRAP WASHED STONE WITH FILTER FABRIC AND OVERLAP FINISHED GRADE MIN. 1' -0" III = III= "IT!II_III� �I� jll-'I III III =1 I�I�II_' -III -III -I� III -II 6 III_ III -III I�t:T I FIj __ I II rllllilllllill III IIIj11 NO. 57 WASHED STONE AGGREGATE =_ 11111 �II �II_I -1111i 8 PERFORATED DRAIN PIPE II111111 �II � I � ITI �I III X11= -I I I_I I I I 111 I_I I I 11 �'- 11= 111_11111 II II �I -III NOTE: PIPE SHALL BE TOWARDS 30" MIN. 111 �11I11�111 11111 �jIIII�III= OUTLET AS INDICATOED ON 11_1 l l l_IIII11111 1111 � 11_111 � III_III_I �I � 1 =III= 1 -�11 -III =11 _ III Ill_II -- I 111111 11 �11I 111 �11_�I UNDISTURBED EARTH OR -III_ II -III_ COMPACTED EARTH FILL -III III � -III 6 III =1_I I�I�II,I,LIII =1 _11111111111= 4" NON -WOVEN GEOTEXTILE FILTER FABRIC NOTE: REFER TO GEOTECHNICAL REPORT FOR MORE INFORMATION 24 FRENCH DRAIN NOT TO SCALE FRENCH DRAIN DETAIL FOR: 200 SWANNANOA RIVER ROAD ASHEVILLE, NC 28805 00 PHONE (828) 252 -5388 FAXREET2525365 CREEKSIDE VILLAGE 52WAAYNESTREE, NC 2886 NC 28186 ca G WAYNENEI:22 , PHONE (828)452-0410 CIVIL DESIGN CONCEPTS, PA FAX (628)456 -5455 CDC PROJECT #11400 MARCH 2015 NCBELS LICENSE#: C -2184 www.civiltlesignconcepts . com IN 2040— — PROPOSED GRADE / �5 SpR 8� PROPOSED RETAINING WALL (TYP) / 203 — / EXISTING GRADE / Lo / x� PROPOSED MSD STREAMBANK rn PROTECTION (SEE DETAIL) / a; °N° / to N ON Il)d - ^O +O H 202 �a1n Q� CI- O Q d W I Z Z lb fD (D O 201 PROPOSED 20'x16 "x0.25" CONCRETE SEWER PIPE ENCASEMENT (TYP) = 2 � g � I 2000-- _ m � � M f)Ld LO 0 't 00 ON N H �NZ Z =O 0Qa > > wF -o Z> a cn e Z ? 1990- 0+00 1 +00 2 +00 SEWER PROFILE PROPOSED SEWER LINE SCALE PROPOSED UNNAMED TRIBUTARY (TYP) TO REEMS CREEK 1 " =30' HORIZONTAL "x0.25" 1 " =6' VERTICAL PROPOSED MANHOLE PROPOSED 20'x1 6 LOCATION (TYP) CONCRETE SEWER PIPE ENCASEMENT (TYP) \ \ \ \ \ \ \ \ \ \ f LOCATION OF EXISTING \ \ \ \ PIPE OUTLET \\ \\ \ \ o \ \ \ \ `L PROPOSED RIP RAP APRON A \ \ PROPOSED LENTGH: WIDTH AT FES: 18' 30 V \ \ \ \ \ STREAM \ co \ 0 \ CROSSING 5 WIDTH AT END: THICKNESS: 8' 18" \ \ \ STONE CLASS: 1 PROPOSED PRELIMINARY 0 15 30 60 RETAINING NOT RELEASED WALL FOR CONSTRUCTION 1 inch = 30 ft. FUTURE SEWER STREAM CROSSING & RIP RAP APRON BULLETIN FOR: 200 SWANNANOA RIVER ROAD ASHEVILLE, NC 28805 PHONE (828) 252 -5388 FAX 252 -5305 G RE E KS I D E VILLAGE C EET 52WAAYNES ILLE,NC28 86 NC WAYNENE CIVIL DESIGN CONCEPTS, PA (82 , PHONE -4410 FAX (828) 456 -5455 CDC PROJECT #11400 MARCH 2015 NCBELS LICENSEM C -2184 www.eivildesignconcepts.com NOTE: ALL STREAMBANK RESTORATION AND STABILIZATION SHALL RESULT IN A FINISH GRADE TO ORIGINAL CONTOURS, UNLESS SPECIFIED OR DIRECTED OTHERWISE BY THE ENGINEER IN WRITING INSTALL ANCHORS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS PLACE EXCELSIOR ABOVE RIP -RAP PLACE CLASS I RIP -RAP TO EXTEND TWO FEET VERTICAL DISTANCE ABOVE BEYOND TOP OF BANK STREAMBED AS SPECIFIED ON TOE IN 12 INCHES THE DRAWINGS EXIST. GRADE ti tidy 12„ BACKFILL rtif STREAMBED 12" WITH NATIVE r MATERIALS - - — 18" MIN. FILTER FABRIC " 4 OVERLAP 6" MINIMUM CONCRETE ENCASEMENT AS SPECIFIED STREAMBANK RESTORATION DETAIL NOT TO SCALE STANDARD DETAIL Metropolitan Sewerage District of Buncombe County, North Corclino STREAMBANK PROTECTION III APPROVED: FEBRUARY 25, 2010 1.18 -03 FUTURE SEWER STREAM CROSSING FOR: 200 SWANNANOA RIVER ROAD ASHEVILLE, NC 28805 PHONE (828) 252 -5388 FAXREET-52 -5385 CREEKSIDE VILLAGE 52WAAYNESTREE, NC 2866 NC 28]88 C WAYNENEI:22 , PHONE (828) 452 -4410 CIVIL DESIGN CONCEPTS, PA FAX CDC PROJECT #11400 MARCH 2015 NCBELS LICENSE #' C -2184 www.civiltlesignconcepts . com PIPE OUTLET TO FLAT AREA PIPE OUTLET TO WELL— DEFINED CHANNEL NO WELL— DEFINED CHANNEL INCOMING PIPE A A A A 3d do w= do +(0.4 x La) 1 1 PLAN FLARED END SECTION PLAN MATERIAL TO MATCH MATERIAL OF INCOMING PIPE PLAN I f La i d FILTER BLANKET SECTION AA FILTER BLANKET SECTION AA NOTES: 1. La IS THE LENGTH OF THE RIP RAP APRON. 2. d — 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (MINIMUM IS 24" DEEP IF STONE IS CLASS II) ELEVATION 3. IN A WELL— DEFINED CHANNEL, EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE NOTES: BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP 1. THE DIMENSION OF THE THE FLARED END AND SOIL FOUNDATION. SECTION SHALL BE PER MANUFACTURER'S 5. COMPACT ANY REQUIRED FILL TO DENSITY OF SURROUNDING UNDISTURBED MATERIAL. SPECIFICATIONS. 6. RIP RAP MAY BE FIELDSTONE OR ROUGH QUARRY STONE AND SHALL BE HARD. 2. THE SKIRT SECTION OF THE FLARED END ANGULAR AND WELL— GRADED. SECTION SHOULD BE JOINED TO THE INCOMING 7. CONSTRUCT APRON AT ZERO GRADE. TOP OF RIP RAP SHALL BE LEVEL WITH THE PIPE PER MANUFACTURER'S SPECIFICATIONS. RECEIVING CHANNEL OR SLIGHTLY LOWER. 8. ALIGN APRON WITH RECEIVING CHANNEL OR STREAM. ASSURE APRON IS STRAIGHT THROUGHOUT ITS LENGTH. 9. END WIDTH OF APRON TO BE EQUAL TO WIDTH OF RECEIVING CHANNEL. FLARED END SECTION WITH RIP -RAP APRON NOT TO SCALE FLARED END SECTION DETAIL FOR: 200 SWANNANOA RIVER ROAD ASHEVILLE, NO 28805 PHONE (8228) 2525388 FA%8252 -5385 C R E E KS I D E VILLAGE 5WALNOTSTREET- SLIITE9 WAYNESVILLE, NO 28]86 CC(C PHONE (828) 452-0410 CIVIL DESIGN CONCEPTS, PA FAX(828)456 -5455 NCBELS LICENSE N: C -2184 www.civiltlesignconcepts.com CDC PROJECT #11400 MARCH 2015