Loading...
HomeMy WebLinkAbout151014_3097-F_Sediment_NOVNorth Carolina Department of Environmental Quality Pat McCrory Governor Davidson County Attn: Robert Hyatt PO Box 1067 Lexington, NC 27293 Donald R. van der Vaart Secretary October 14, 2015 NOTICE OF VIOLATIONS OF THE SEDIMENTATION POLLUTION CONTROL ACT RE: Project Name: Old Salisbury Road Sewer Line Project ID: DAVID -2015-015 County: Davidson Compliance Deadline: November 3, 2015 or 20 days from receipt Dear Mr. Hyatt: On October 8, 2015, personnel of this office inspected a project located on Old Salisbury Road, Lexington in Davidson County, North Carolina. This inspection was performed to determine compliance with the North Carolina Sedimentation Pollution Control Act (Act) of 1973. The inspection revealed a land -disturbing activity of approximately 2.8 acres being conducted. It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The purpose of this letter is to inform you that this activity was found to be in violation of the Act, G.S. 113A-50 to 66, Title 15A, North Carolina Administrative Code (NCAC), Chapter 4. If you feel that you are not responsible for the following violations, please notify this office immediately. Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105 Phone: (336) 776-9800 / Fax: (336) 776-9798 Notice of Violations Project: Old Salisbury Road Sewer Line October 14, 2015 Page 2 of 4 The violations that were found are: I. Failure to conduct a land -disturbing activity in accordance with the approved erosion and sedimentation control plan. G.S. 113A-57(5). 2. Failure when a land -disturbing activity that will disturb more than one acre is undertaken on a tract, to install sedimentation and erosion control devices sufficient to retain the sediment generated by the land -disturbing activity within the boundaries of the tract during construction upon and development of the tract. G.S. 113A-57(3). 3. Failure to take all reasonable measures to protect all public and private property from damage by such land -disturbing activities. 15A NCAC 4B .0105. 4. Failure to retain along a lake or natural watercourse a buffer zone of sufficient width to confine visible siltation by natural or artificial means within the 25 percent of that portion of the buffer zone nearest the land -disturbing activity. G.S. 113A-57(1). 5. Failure to install and maintain all temporary and permanent erosion and sedimentation control measures as required by the approved plan or any provision of the Act, and rules adopted thereunder, during or after the development of a site. 15 NCAC 4B .01 13. To correct these violations, you must: 1. Repair and maintain all damaged silt fence throughout the project limits as shown on the approved plan dated April 22, 2015. 2. Provide construction entrances to the sewer line alignment off of Park Drive as shown on sheet C2 of the approved plan. Construction entrances must be installed using 2"-3" coarse aggregate as shown on the construction detail on sheet C2 of the approved plan. Sediment continues to be tracked onto Park Drive from construction equipment. 3. Prevent all construction equipment from entering and leaving the project along Old Salisbury Road. The approved plan does not address entering and exiting the project from these points. In addition, construction equipment is not approved to enter and exit the project on either side of the concrete driveway owned by the Heavens Gate Church Trustees. 4. Install all approved sediment control measures at station 17+50, at the stream crossing, per sheet C2 of the approved plan and per the construction detail shown on SD2 of the approved plan. Silt fence on the west side of the crossing has been damaged. Silt fence on the east side of the stream crossing has not been installed. Construction equipment is not permitted to cross the stream at this point without the approved stream crossing in place. 5. Install the stream crossing at station 27+75 as shown on sheet C3 of the approved plan and per the construction detail shown on sheet SD2 of the approved plan. Construction equipment is not permitted to cross the stream at this point without the approved stream crossing in place. No apparent effort has been made to install the stone dams per the construction detail. 6. Install the construction entrance off of Old Salisbury Road (at the 20' permanent easement) as shown at station 30+87 on sheet C3 of the approved plan. Notice of Violations Project: Old Salisbury Road Sewer Line October 14, 2015 Page 3 of 4 The violations cited herein may be referred to the Director of the Division of Land Resources (Tracy E. Davis, PE, CPM) for appropriate enforcement action, including civil penalty assessments for an initial one -day violation and/or a continuing violation. The penalty for an initial one -day violation may be assessed in an amount not to exceed $5,000.00. The Division of Land Resources is not required to provide a time period for compliance before assessing an initial penalty for the violations cited herein. Please be advised that a civil penalty may be assessed for the initial day of violations regardless of whether the violations are corrected within the time period set out below. In addition, if the violations cited herein are not corrected within 10 days of receipt of this notice or before November 3, 2015, whichever term is longer, this office may request that the Director take appropriate legal action against you for continuing violations pursuant to NCGS 113A-61.1 and 113A-64. A penalty maybe assessed from the date of the violation, pursuant to NCGS 13A -64(a)(1), and for each day of the continuing violation in an amount not to exceed $5,000.00 per day. Please be advised that any new land -disturbing activity associated with this project should not begin until the area presently disturbed is brought into compliance with the Act. When corrective actions are complete, you should notify this office so that work can be inspected. You should not assume that the property is in compliance with the Act until we have notified you. After installation, all erosion control measures must be maintained in proper working order until the site is completely stabilized. We solicit your cooperation, and would like to avoid taking further enforcement action. At the same time, it is your responsibility to understand and comply with the requirements of the Act. Copies of the relevant statute and administrative rules may be examined at this office or will be sent to you upon request. Should you have questions concerning this notice or the requirements of the Act Please contact me at your earliest convenience. Sincerely, Matthew E. Gantt, PE Regional Engineer Land Quality Section Enclosures: Sedimentation Inspection Report North Carolina Department of Environment and Natural Resources Land Quality Section: 450 West Hanes Mill Road, Suite 300, Winston-Salem, NC 27105, Phone: 336-776-9800 COUNTY: Davidson PROJECT: OLD SALISBURY ROAD SEWER RIVER BASIN: YADKIN-PEE DEE PERSON FINANCIALLY RESPONSIBLE: Robert Hyatt, County of Davidson PROJECT # DAVID -2015-015 ADDRESS: PO Box 1067 Lexington NC 27293 CASE # 1. PROJECT LOCATION: Old Salisbury Rd. Lexington NC 27292 Pictures: YES Video: Digital: X 2. Weather and Soil Conditions: 60'S, CLEAR, SOIL WET First Inspection:NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? NO 5. Violations b. Failure to follow approved plan -G.S. 113A-57(5)and Failure to implement the erosion and sedimentation control plan, NCG 010000 Section III. 3) (a) e. Insufficient measures to retain sediment on site - G.S. 113A-57(3) f. Failure to take all reasonable measures - 15A N.C.A.C. 413.0105 g. Inadequate buffer zone, G.S. 113A-57(l)-G.S. 113A-57(1) j. Failure to maintain measures - 15A N.C.A.C. 4B.0113 6. Is the site in compliance with NPDES Permit NCG 010000?: NO s. Failure to install and maintain BMPs and control measures NCG 010000 Section III. (4) t. Failure to operate and maintain control measures Failure to operate and maintain control measures, NCG 010000 Section IV, (1) 7. Has Sedimentation Damage occurred since last inpections? YES Lake/natural watercourse on the tract: YES Lake/natural watercourse off the tract: YES Other Property: YES Description: INTO STREAMS AT STATIONS 17+50 AND 27+75. TRACKED ON TO PARK DRIVE AND OLD SALISBURY ROAD. Degree of Damage: 2) MODERATE Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): NO ONE ON SITE Title: Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date Given/Sent: OCT 09, 2015 Report By: Matthew E. Gantt, PE Date of Inspection: OCT 08, 2015 Others Present: Time Arriving on Site: 9:30 Time Leaving Site: 10:45 cc; ROBERT. HYATT@DAVIDSO NCO UNTYNC. GOV, JGREY@THEWOOTENCOMPANY.COM, WOODSPROSE@GMAIL.COM Revision Date 09/09/2013 Page 1 of 2 9. Corrective Actions Needed: 1. Repair and maintain all damaged silt fence throughout the project limits as shown on the approved plan dated April 22„ 2015, 2. Provide construction entrances to the sewer line alignment off of Park Drive as shown on sheet C2 of the approved plan. Construction entrances must be installed using 2"-3" coarse aggregate as shown on the construction detail on sheet C2 of the approved plan. Sediment continues to be tracked onto Park Drive from construction equipment. 3. Prevent all construction equipment from entering and leaving the project along Old Salisbury Road. The approved plan does not address entering and exiting the project from these points. In addition, construction equipment is not approved to enter and exit the project on either side of the concrete driveway owned by the Heavens Gate Church Trustees. 4. Install all approved sediment control measures at station 17+50, at the stream crossing, per sheet C2 of the approved plan and per the construction detail shown on SD2 of the approved plan. Silt fence on the west side of the crossing has been damaged. Silt fence on the east side of the stream crossing has not been installed. Construction equipment is not permitted to cross the stream at this point without the approved stream crossing in place. 5. Install the stream crossing at station 27+75 as shown on sheet C3 of the approved plan and per the construction detail shown on sheet SD2 of the approved plan. Construction equipment is not permitted to cross the stream at this point without the approved stream crossing in place. No apparent effort has been made to install the stone dams per the construction detail. 6. Install the construction entrance off of Old Salisbury Road (at the 20' permanent easement) as shown at station 30+87 on sheet C3 of the approved plan. 10. COMMENTS: is in follow uo to the the last inspection date. All corrective actions crossinas have not been installed oer the aooroved olan. In Revision Date 09/09/2013 Page 2 o1