Loading...
HomeMy WebLinkAbout20140285 Ver 3_Application_20160520Carpenter, Kristi From: Rivenbark, Chris Sent: Friday, May 20, 2016 10:02 AM To: Andrew Williams (Andy); Wrenn, Brian L Cc: AI-Ghandour, Majed N; Chapman, Amy; garyjordan@fws.gov; Jones, Brandon H; King, Art C; Koch, Thomas K; Carpenter,Kristi; Lauffer, Matthew S; Mellor, Colin; NCDOT Service Account - Roadway Design; Staley, Mark K; Wilson, Travis W.; Twisdale, John W; Wilkins, Ronald B; Merritt, John S; AI-Sharawneh, Ahmad A; Ayscue, Phillip W; Harmon, Beth; clarence.coleman@fhwa.dot.gov; Cynthia VanDerWiele; Joyner, Drew; Militscher, Chris (militscher.chris@epa.gov); Monte Matthews (Monte.K.Matthews@usace.army.mil); Tony Able (Able.tony@Epa.gov) Subject: Permit Modification Request for R-0623, Montgomery County The permit modification request for R-0623 has been prepared. The electronic copy can be viewed/downloaded at https://connect.ncdot.gov/resources/Environmental/ This email serves as our modification request submittal to the U.S. Army Corps of Engineers and the N.C. Division of Water Resources. Chris Rivenbark Project Development & Environmental Analysis Natural Environment Section North Carolina Department of Transportation 919-707-6152 office crivenbarka-ncdot.gov 1598 Mail Service Center Raleigh, NC 27699-1598 1020 Birch Ridge Drive Raleigh, NC 27610 5�Nothing Compares -,k -,- Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Transportation May 20, 2016 Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Raleigh, North Carolina 27587 ATTN: Mr. Andy Williams NCDOT Coordinator Dear Sir: PAT McCRORY Governor NICHOLAS J. TENNYSON Secretary Subject: Request for Modification of the Section 404 Nationwide Permits 23, 13, and Section 401 Water Quality Certification for the proposed NC 24/27 Troy Bypass from west of SR 1138 (Dairy Road) to just east of Little River, Montgomery County, Division 8. WBS Element No. 34352.1.1, TIP No. R-0623 Debit $570.00 from WBS Element No. 34352. 1.1 REFERENCE: USACE Individual Permit, Action ID No. SAW -2004-01203, September 25, 2014. NCDWR Section 401 Water Quality Certification, and Isolated Wetlands Permit, Project No. 20140285 vl, Certification No. 003992, May 23, 2014. Dear Sir: The purpose of this letter is to request a modification to the United States Army Corps of Engineers (USACE) Section 401 Individual Permit and North Carolina Division of Water Resources (NCDWR) Section 401 Water Quality Certification for the above -referenced project. In addition to this cover letter, please find enclosed the revised Division of Mitigation Services (DMS) Acceptance Letter, revised permit drawing sheet nos. 1, 55, 56, 90, and 91 as well as 4 additional permit drawings. The modification request is to accommodate a request from the Town of Troy. The design was revised to provide a free movement connection to the town. Public officials felt an intersection would discourage travelers and make it difficult for locals who have always had free movement to the town. A grade separated crossing has been added on Troy -Candor Road over the Troy Bypass, along with connecting roadways in the northwest and southeast quadrants. These changes will replace the directional crossovers and U-turn bulb outs along the Troy Bypass in the vicinity of Troy -Candor Road. In addition, these changes will allow for uninterrupted traffic movements on Troy -Candor Road across the Bypass and will eliminate the need to make U-turn movements from the Bypass to access Troy -Candor Road. Nothing Compares_ State of North Carolina I Department of Transportation I PDEA-Natural Environment Section 1020 Birch Ridge Drive, 27610 1 1598 Mail Service Center I Raleigh, North Carolina 27699-1598 919-707-6000 T 919-212-5785 F Proposed permanent impact increases include: • An additional 38 feet of permanent stream impacts have been added to permit site 15 due to bank stabilization associated with the 66" culvert. • Stream impacts for new permit site 25 are associated with the stream crossing at the proposed Ramp D due to a 72" culvert. This will result in 270 linear feet of permanent and 28 linear feet of intermittent stream impacts for this site. • Stream impacts for new permit site 26 are due to raising the grade on Troy -Candor road to accommodate the new interchange. This will result in 66 linear feet of permanent impacts, 7 linear feet of temporary impacts, and 8 feet of bank stabilization. Compensatory Mitigation With the additional impacts at these 3 sites, the project will permanently impact 5,298 feet of warm water streams. Of these 5,298 feet, there are 393 feet of bank stabilization that do not require mitigation by the USACE, resulting in 4,905 feet of stream impacts requiring USACE mitigation. The USACE requires 2:1 mitigation for 3,398 feet (perennial) and 1:1 mitigation for 1,507 feet (intermittent) of stream impacts. NCDWR requires 1:1 mitigation for 3,483 feet of stream impacts (perennial including bank stabilization). Therefore, the total USACE mitigation requirement exceeds the NCDWR requirement. The mitigation requirements of 4,905 feet of permanent warm water stream impacts will be provided by DMS for R-0623. Regulatory Approvals Section 404: We are hereby requesting the modifications described above for the USACE Individual 404 Permit SAW -2004-01203, issued September 25, 2014, for the above-described activities. Section 401: We are hereby requesting a modification to the 401 Water Quality Certification from the NCDWQ Certification No. 003992, issued May 23, 2014. In compliance with Section 143-215.3D(e) of the NCAC, we will provide $570.00 to act as payment for processing the Section 401 permit modification. A copy of this modification request and its distribution list will be posted on the NCDOT website at: https:Hconnect.ncdot.gov/resources/Environmental Thank you for your assistance with this project. If you have any questions or need additional information, please contact John Merritt at 919-707-6140 orjsmerritt@ncdot.gov. Sincerely, 1�® Philip S. arris, P.E., C.P.M. Natural Environment Section Head cc: NCDOT Permit Application Standard Distribution List. Page 2 of 2 Mitigation Services ENVIRONMENTALOUALITV May 13, 2016 Mr, Philip S. Harris, IIl, P.E., CPM Natural Environment Unit North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Mr. Harris: Subject: Mitigation Acceptance Letter: PAT MCCROR" Governor DONALD R. FLAN DER VAART TIP Number R-0623, Troy Bypass - NC 24 / 27 from SR 1138 (Dairy Road) to East of the Little River, Montgomery County Reference: USACE 404 Individual Permit issued September 25, 2014 (USACE Action ID 2004- 01203) NCDWR 401 Water Quality Certification (WQC) issued August 14, 2014 (NCDWR ID 2014-0285) The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the additional stream and riparian wetland mitigation for the subject project. Based on the information supplied by you on May 13, 2016, the additional stream and riparian wetland impacts are located in CU 03040104 of the Yadkin River Basin in the Southern Piedmont (SP) Eco -Region, and are as follows: Table 1— Additional Imbacts (feet / acres) Yadkin 03040104 Sp Stream Wetlands Buffer (Sq. Ft.) Cold Cool Warm Riparian Non- Coastal Zone 1 Zone 2 Riparian Marsh (3:1) (1.5:1) Impacts (feet/acres) 0 0 382.0 0.02 0 0 0 0 *NOTE: Some of the stream impacts may be proposed to be mitigated at a 1:1 mitigation ratio. NCDMS is providing riparian wetland credits for all wetland impacts associated with this project. See permit application for details. These impacts and associated mitigation needs were not projected by the NCDOT in the 2016 impact data. DMS is currently providing stream and riparian wetland mitigation for the impacts associated with this project located in cataloging unit 03040104 of the Yadkin River basin as required by the 404 and 401 permits issued in September 2014 and August 2014, respectively, as shown in the below table (in mitigation credits): State of North Carolina Environmental Quality Mitigation Services 1652 Mail Service Center 1 217 W. Jones Street, Suite 3000 1 Raleigh, NC 27609-1652 919 707 8976 T Mr. Harris TIP R-0623 May 13, 2016 Page Two Table 2 — Current Permitted Impacts and Associated Mitigation Requirements provided by DMS (based on 2015 permits) and Revised Anticipated Impacts (based on mitigation reauest) *Some of the additional wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. DMS will provide the amount of mitigation as determined by the regulatory agencies. This mitigation acceptance letter replaces the mitigation acceptance letters issued on February 25, March 7, and July 28, 2014. In accordance with the directive from the February 8, 2011 IRT meeting, non - riparian wetland impacts located in the mountain and piedmont areas of North Carolina will be accepted as requested but mitigated utilizing riparian wetland mitigation credits. DMS commits to implementing sufficient compensatory warm stream mitigation and riparian wetland mitigation credits to offset the additional impacts. This impact and associated mitigation need were under projected by the NCDOT in the 2016 impact data. DMS will commit to implement sufficient compensatory mitigation credits to offset the additional impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In -Lieu Fee Instrument dated July 28, 2010. 8420. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919 -707 - Sincerely, James . Stanfill Credit Management Supervisor Cc: Mr. David Bailey, USACE — Raleigh Regulatory Field Office Ms. Amy Chapman, NCDWR File: R-0623 Additional Total Permitted Mitigation Provided by Additional Impact Type Impacts DMS per Issued Impact (for Revised Total (feet / acre / sq ft) Permits (Credits) approval) Impacts* Stream 4,569.0 7,697.0 382.0 4,951.0 Riparian Wetland 1.23 2.40 0.02 1.25 *Some of the additional wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. DMS will provide the amount of mitigation as determined by the regulatory agencies. This mitigation acceptance letter replaces the mitigation acceptance letters issued on February 25, March 7, and July 28, 2014. In accordance with the directive from the February 8, 2011 IRT meeting, non - riparian wetland impacts located in the mountain and piedmont areas of North Carolina will be accepted as requested but mitigated utilizing riparian wetland mitigation credits. DMS commits to implementing sufficient compensatory warm stream mitigation and riparian wetland mitigation credits to offset the additional impacts. This impact and associated mitigation need were under projected by the NCDOT in the 2016 impact data. DMS will commit to implement sufficient compensatory mitigation credits to offset the additional impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In -Lieu Fee Instrument dated July 28, 2010. 8420. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919 -707 - Sincerely, James . Stanfill Credit Management Supervisor Cc: Mr. David Bailey, USACE — Raleigh Regulatory Field Office Ms. Amy Chapman, NCDWR File: R-0623 Additional See Sheet 9-A For Index of Sheets WTHIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARY OF TRO OSITE SA -L2- STA. 28+91.05 L.B.=. SITE 5B -Ir STA. 28+83.70 L.A. SITE 5C BUSINESS -Y5CENTERSITE 4 B1 _ JZ_ DRIVE (PRIVATE) ( C 2427) SITE 3 -L- 07 77+4. 6 EIVI RCBC -L-T 54+04.82 _yJ_ ENB RGBG s v DAIRY RD (SR 1138) SITi_ -DR 1 - ri-0 -Y10- b, SITE 5 4 GLEN RD v��� 93.08 BEGIN RCBC Y' til w�ti NORTH ,1. i SITE 20 -Y7 4� 0 vw��4 oQ ADT 2040 = 9300 - 18,200 DHV = 10 % �C� Q 53+84.72 D BEGIN RCBC 2012 STANDARD SPECIFICATIONS -L- STA. 122 + 33.46 +/- h _Y10- BEGIN BRIDGE r— END BRIDGE -Ll- STA. 28+91.37 LB.= �TAI A. 28 + 83.70 L A. -L2- +49.86 = -LI- STA. 18+49.86 BEGIN TIP PRO ECT R-0623 -LI- STA. 17 + 00.00 -LI- STA. 15+50.00 BEGIN CONSTRUCTION * TRAFFIC SIGNAL STATIC OF NORTH � CAROLINA DIVISION OF HIGHWAYS MONTGOMERY COUNTY LOCATION. NC 2427 TROY BYPASS FROM WEST OF SR 1138 (DAIRY ROAD) TO JUST EAST OF LITTLE RIVER TYPE OF WORK: GRADING, DRAINAGE, PAVING, STRUCTURES SIGNALS AND SIGNING WETLAND AND SURFACE WATER IMPACTS PERMIT / SITE 19C 7 'ON SITE 19B SITE 19 SITE 19A l -L- POC 283+50.84 d BEGIN RCBC "CIO SITE 17 'Lg SITE 16 yw Ib -1 d SITE 15 d M -Y7A- -Y10- b, Prepared in Me Office of. 26 GLEN RD -Y7- STA 25+00.00 ADT 2014 Y' END CONSTRUCTION NORTH p SITE 20 -Y7 SITE 24A CAAELSIE RD ADT 2040 = 9300 - 18,200 DHV = 10 % L- POC 283+73.85 -YIOA- ENO RCBC RELOCATION SITE 24 (SR 1519) 2012 STANDARD SPECIFICATIONS NOTE: THIS PROJECT IS A PARTIAL CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO POINTS AS SHOWN ON THE PLANS CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III Permit Drawing Sheet 1 of 91 Revised 5/13/2016 _y9_ PAGE ST N (SR 1332) C ^ / 2427) s -Y10- PROJECT LENGTH Prepared in Me Office of. 26 GLEN RD ADT 2014 (SR 1324) NORTH p SITE 20 pQ C '4.p0 44 Qj ADT 2040 = 9300 - 18,200 DHV = 10 % L- POC 283+73.85 -YIOA- ENO RCBC 1000 Birch Ridge Dr., Raleigh NC, 27610 4� r 18 / 2012 STANDARD SPECIFICATIONS PLANS _Y10- SITE 21 HOLLY HILLS DR P.E.y SIGNATURE. O (SR 1586) T —_ 17 % V 60 MPH ' TTST =12% DUAL 5% LENGTH STRUCTURES TIP PROJECT R-0623 = 0.131 MILES RIGHT OF WAY DATE: JANUARY 30, 2013 G. E. BREW, P.E. = o r ti Q ROADWAY DESIGN ENGINEER SITE 22 PROJECT ENGINEER PROFILE (HORIZONTAL) D -L- STA 338 + 09.13?0 TOTAL LENGTH OF TIP PROJECT R-0623 = 6.649 MILES BEGIN BRIDGE FN p _ �� LETTING DATE: NOVEMBER 18. 2014 I.T. YOUNIS P.E. —T— 0 -L- STA 341+29.25 +/- y4 PROFILE (VERTICAL) END BRIDGE �2 v END TIP PROJECT R-0623 —L— STA. 368 + 00.00 PRELIMINARY ][CLANS DO NOT U5E FOR CONSTRUCTION GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in Me Office of. HYDRAULICS ENGINEER DIVISION OF HIGHWAYS ADT 2014 DIVISION OF HIGHWAYS NORTH 50 25 0 50 100 = 6610 - 12,641 pQ C '4.p0 ADT 2040 = 9300 - 18,200 DHV = 10 % LENGTH ROADWAY TIP PROJECT R-0623 = 6.518 MILES 1000 Birch Ridge Dr., Raleigh NC, 27610 4� r 2012 STANDARD SPECIFICATIONS PLANS D = 55 % P.E.y SIGNATURE. O 50 25 0 50 100 T —_ 17 % V 60 MPH ' TTST =12% DUAL 5% LENGTH STRUCTURES TIP PROJECT R-0623 = 0.131 MILES RIGHT OF WAY DATE: JANUARY 30, 2013 G. E. BREW, P.E. = o r ti Q ROADWAY DESIGN ENGINEER PROJECT ENGINEER PROFILE (HORIZONTAL) TOTAL LENGTH OF TIP PROJECT R-0623 = 6.649 MILES FN p l0 5 0 to 20 LETTING DATE: NOVEMBER 18. 2014 I.T. YOUNIS P.E. —T— T of TRpNSQ STATE OF NORTH CAROLINA FUNCTIONAL CLASSIFICATION RURAL ARTERIAL REGIONAL TIER PROJECT PROJECT DEslcx ENGINEER PROFILE (VERTICAL) L I FOR PROFILE OF LINE -L- SEE SHEETS 45 PROJECT REFERENCE NO. SHEET NO. AND 46 R-0623 1 22 FOR DRAINAGE DITCH DETAILS ro 2� k SEE SHEETS 2D-1 THRU 2D-3 Cal i \F 60 O r,jQ'b RICKY HARRIS DB 489 PG 509 PC D SLIDE 124D \F `F\ FOR PROFILE OF LINE -Y8REV- SEE SHEET 57 RAI SHEET NO. FOR PROFILE OF LINE -RBD- SEE SHETT 58 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER \x �� 1PI8E LINIIIN ff8Y IDILANS DO NOT USE F CONSTRUCTION \\ o 9ss a F cA�eC \ INC®I�IIDIL ATE PLANS DO NOT USE POR R/ W ACQUISITION C \ FROM STA.252+75 CL o� F/ 2 � A FROM -Y8REV- STA. 30+60 RT ra � I sED of ai '22 -5 R TAINCH EX. AV DOCUMENT NOT CONSIDERED FINAL PLANTED PINES I F -BL- 558 RIPRAP AT EM -BL- 559 \ UNLESS ALL SIGNATURES COMPLETED SEE rSTABILIZATION \\/\ \ DETAIL -6 �\ \V LAT BASE DITCH SEE DETAIL 'G' DDE=136 C.Y. 11 SPECIAL CUT A\ J\ \F \I "�' EST. 97 SY PSRM +l6I� I �\ \BASE DITCH \ V �� Q I60' V `—� SEE DETAIL _ / / TOE PROTECTION (V \ '22-2' in •\ \ / TREES I TOE PROTECTION SEE DETAIL 'F'' /W L L 1408.43 \ i� W/CLSEE D B� RIIPi P W/GEST. 71P RA' +46 F �. i LAT N'TC A i EST. 21 TONS EST . 18GF TD 160' W I \ 1 5 D AIL 2-3 \F _ TREES i - EST. 52-.SY_GF _- W A D \ \ EXISTING R/W _ - EXISTING R/W 49 \ / N 24' FIELD \\ OIL_ _______/ _41 -------- 3: _ - z ze exlsTwc R/w Sop - - - - +Ib +46 x i iw pI II -'J - ------------------ 40' l40', 1 \\ A G i d Lu W -F V A Hw2� --_ --- �� �I a _T 11 t� Vi FLAT BASE DITCH - CL B F / ( \\ L g R RAP \ I\ F R` _ / a`� 'W - — _ — _ F� STANDARD BASE DITCH \ \ Q -BL- 557 SEE DETAIL '22-1' — /// \ \ RIP RAP \ \ TYPE B_ -7 _ TREES (zzn _ \_ SEE DETAIL 'HH' Q 0 \ 2GI PLANTED PINES EST. 30 CY DDE 0 _ _ __ JOYCE HO ELL MCCALL �`c s`� EST. 44 SY PSRM \ -� VO L U 4� a SITE 15 4� CV ' c FS -L- 2G M N 24 G9 ac 250 2GI 255 3/° 55 12.9 E Q CV REMOVE 77 IAU-350 _ I " R P_ry w Q zzza TYPE 77 . /22 2GI Ln „ ,e" GI- TYPE 77 2GI-A O� ' � I 5 B-77 2z,v a zz,E zzz,> zzsz/ Q (fi W I W I_A o TYPE B-77 zz07 sz 2GI-A -2GI - 30" RCP IV W /� UJI 22 �T> 7 �, 2GILu — 222s. v - _ _Z 7 F 623-3 (GP ) Gti0C, - _ .� f�\ e x`233 23p4 \ SST. ISTONSIP RAP Lu M 3r1F PPINESD \ _-- Q J L 1��' G \z23 2GI L O EST. S SY GF W/MH zzc �•A ,� F _ _. t — _ — .'� 2GI 1� / C J \ 30" RCP -IV FTOE PROTECTIO!�BASSFSEE DEAIL F ---BACKFILL EXISTINC?CHANNEL p 222G F \° V 11, I _ W/CL 'B' RIP RAP I Q CLASS 'B' RIP RAP SO TREES \\ ' �o �\ _ \ EST 53 TONS / _ \ E T. TONS 1 "ANG R/w TT _ g \T 131 Y GF elsn R/w 15 © A EST. 11 SY GF nNc R/w �A, s � v cP oGZo`no \ \ - \F CLASS 'T -8 078 y� \ II / , / I r / I I -L- +26.03 _TOE PROTECTION s G ElEis V F F 140' SEE DETAIL'F' \ \ xc N \ 21 SY GF W/CL'B' RIP RAP - \ 'W 2oz EST.15 TONS LAT BASE DITCH STANDARD BI DITCH V EST. 37 SY GE SEE DETAIL '22 T� EST-78 \, SEE DETAIL 'T' DI -BL- 560 CY DDE I \ -EST. 12 CY DE 20z EST. 15 TON CL 'I' RIP P F \ A 7 EST. 40 SY F I CLASS 'B' RIP RAP r�� \ RIPRAP AT EM ANKMENT I EST. 1 TO Q \\\ \ \, SEE DETAIL ZF6 EST.5 SY GF 5/ -RPD- +79.49 RICKY HARRIS 9y� \ // 4( I FIF 100' DB 489 PG 509 LAT BASE DITCH\\PLANTED \ \ / PC D SLIDE 124D F, SEE DETA4L-'-22-5' V PINES 1F �\ CLASS 'B' RIP RAP 00 \\ I EST.5TONS SY ISE SITE 25 FS -RPD- MINNIE WOOD 49 50 woods �\ "Ao �� F1PI Sta 12+76.78 c' 0 1' JOYCE HOWELL McCALL DB 161PG 419 ,,°y\` = 68°/5'52.2"iLTi REVOCABLE TRUST 09 n DB 69PC 386 \ V A ,223, / Y F D = 28'38' 52.4" 0 s �/ BK 137-A + o �A" a� v _ —"w L = 238.29' PB P 1 PLANTED T = 13557 9 \ 2238 PINES \�.\\ _ / R = 200.00' CL B RIP / -Y8REV - P/ Sta 32+77.24 � = /2° 38' 05.9" (LT) BENSON MORRIS2236) _Y8REV_ +70 \ \ = D = 3 49' 11.0 q UB 263 PG 265 76.01' Permit Drawing \ \ \ 2228 / L = 330.78' Q T = 166.07' �� \ P p , D Sheet 56 of 91 R = 1.500.00' <�_. PASTURE \ e = SEE PLANs�� �v Revised 5/13/2016 �...�/\ F\ \ \ \ REMOVE SOIL&ORPVE-2229 / k� '22391 POND DENOTE IMPACTS IN SURFACy WATER DENOTES TEMPORARY TOE PR TECTION RFs Fa /� IMPACTS IN SURFACE WATER w» \ SEE DYE�TP{L 22-4 \ M� W/CL 'B' RFP RAP \ \ \ N EST. 30 TO ,S �o \ G 100• 0' 100' 200' 300' �/p \ EST. 74 SY QEF •, 5" MONOLITHIC CONC. ISLAND f»fn, GRA?EIC SCALE SITE 25 Permit Drawing Sheet 1 of 4 Added 5/13/2016 0 0% T N M f" N N N. W W o 00 W N ,I N W W W Z cn - CLASS 'B' RIP RAP EST. 1TONS EST. 5 SY GF ' ,r✓ STANDARD BASE DITCH rpt SEE DETAIL '22B-2' EST. 12 CY DDE SHEET NO. STANDARD BASE DITCH EST. 15 TONS CL 'I' RIP RAP EST. 20 SY GF DETAIL 22B-3 SEE DETAIL '22B-2' EST.7 CY DDE EST. 10 TONS CL 'I' RIP RAP PLANTED REMOVE WOOD EST. 14 SY GF �- PINES A = l2' 38' 05.9" (LT) L� SITE 26 TREES POND -------------------------- FOR DRAINAGE DITCH DETAILS SEE SHEETS 213-1 THRU 210-3 - 5" MONOLITHIC CONC. ISLAND 00 CO z DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER 100' 0' 100' 200' 300' GRAPHIC 'SCALE 5/ RICKY HARRIS PLANTED DB 489 PG 509 PINES PC D SLIDE 124D CLASS 'B' RIP RAP EST. 3 TONS EST. 11 SY GF SPECIAL CUT BASE DITCH SEE DETAIL '22B-5' END C/A — TJ3EES C _ � SR 1554 TROY -CANDOR RD �►_ —Y8REV ,ITCH 4E• wD lL � �� To ea✓�b IEV-+80.00 50' EV- +69.00 SPECIAL CUT BASE DITCH SEE DETAIL '2213-5' PASTURE 86 DETAIL 22B-1 DETAIL 2213-2 TOE PROTECTION STANDARD BASE DITCH (Not to Sc°Ie1 INot to Scalel BENSON MORRIS Notprul Nnturol DB 283 PG 265 �p� Ground D 1.� Ground Notuml .1,.1 `�S° d Ground b f Imo— = d Geatenile B Min. D=1 R. Mar, F Ft. d=1 H. 6=2 Ft. GeoHHtile 8=3-55 k. Type of J.—CIE B Rip-Rop Type of Liner=CL I Rip-R°p FROM-Y8REV- STA. 31+80 TO STA. 33+30 RT-Y8REV- STA. 34+04+/- LT -RPD- STA. 11+14+/- RT SHEET NO. -Y8REV— U �,-- DETAIL 22B-3 �- PI Sta 32+7724 REMOVE WOOD P1 Sta 39+/5.44 LATERAL' e SDRCH A = l2' 38' 05.9" (LT) H2B' A = 12' 58' 43..pT (RT) R HYDRAULICS D = 3° 49'11.0' D = 2` 00'00.0' TOE PROTECTION / T 'V' DITCH 42B-3' Tc SEE DETAIL 22B-1 SEE DETAIL L = /85.4/' -CL'B' RIP RAP T = 166.07' EST. 30 TONS T = 93.10' Win. D=l Ft. 'ES . 75 SV GF P`// R = 1,500.00' R = 2,864.79' -_.� � END C/A e = SEE PLANS R0623-4 (GPS) e = EXISTING DIRECTIONAL ONLY END OF PIPE N/A —BY8— POT 15+96.14 PASTURE POND -------------------------- FOR DRAINAGE DITCH DETAILS SEE SHEETS 213-1 THRU 210-3 - 5" MONOLITHIC CONC. ISLAND 00 CO z DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER 100' 0' 100' 200' 300' GRAPHIC 'SCALE 5/ RICKY HARRIS PLANTED DB 489 PG 509 PINES PC D SLIDE 124D CLASS 'B' RIP RAP EST. 3 TONS EST. 11 SY GF SPECIAL CUT BASE DITCH SEE DETAIL '22B-5' END C/A — TJ3EES C _ � SR 1554 TROY -CANDOR RD �►_ —Y8REV ,ITCH 4E• wD lL � �� To ea✓�b IEV-+80.00 50' EV- +69.00 SPECIAL CUT BASE DITCH SEE DETAIL '2213-5' PASTURE 86 DETAIL 22B-1 DETAIL 2213-2 TOE PROTECTION STANDARD BASE DITCH (Not to Sc°Ie1 INot to Scalel BENSON MORRIS Notprul Nnturol DB 283 PG 265 �p� Ground D 1.� Ground Notuml .1,.1 `�S° d Ground b f Imo— = d Geatenile B Min. D=1 R. Mar, F Ft. d=1 H. 6=2 Ft. GeoHHtile 8=3-55 k. Type of J.—CIE B Rip-Rop Type of Liner=CL I Rip-R°p FROM-Y8REV- STA. 31+80 TO STA. 33+30 RT-Y8REV- STA. 34+04+/- LT -RPD- STA. 11+14+/- RT L FROM-Y8REV- STA. 35+70 TO STA. 36+50 Rl SHEET NO. -Y8REV— PROJECT REFERENCE NO. DETAIL 22B-3 R-0623 PI Sta 32+7724 P/ Sta 37+05.2/ P1 Sta 39+/5.44 LATERAL' e SDRCH A = l2' 38' 05.9" (LT) L = 3' 29' 37.0' (RT) A = 12' 58' 43..pT (RT) b HYDRAULICS D = 3° 49'11.0' D = 2` 00'00.0' D = I O( 00.0 No,uwl j —' FII ENGINEER L = 330.78' L = /7468' L = /85.4/' Ground:, D �A H. Slope T = 166.07' T = 87.3T T = 93.10' Win. D=l Ft. R = 1,500.00' R = 2,864.79' R = 8185/' 1, FC e = SEE PLANS e = SEE PLANS e = EXISTING FROM-YBREV- STA. 33+37 TO STA. 34+75 RT L FROM-Y8REV- STA. 35+70 TO STA. 36+50 Rl IINCOM PLE SHEET NO. DO NOT USE FOR PROJECT REFERENCE NO. PRELIMINARY R-0623 22B CONSTRUCTION RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IINCOM PLE E ]PLANS DO NOT USE FOR / W ACQUISITION PRELIMINARY ]PLANS DO NOT USE FOIL CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED FOR PROFILE OF-Y8REV- SEE SHEET 57 FOR PROFILE OF-DR2213- SEE SHEET 58 Permit Drawing Sheet 2 of 4 Added 5/13/2016 DETAIL 226-5 SPECIAL CUT BASE DITCH IN— to Sm16) N—1 Gr°pnd a:, TN �D� P°��t slope L J Min. D=1 Ft. B=2 Ft. FROM-Y8REV- STA. 36+50 TO STA. 38+50 RT FROM-Y8REV- STA. 36+00 TO STA. 36+50 LT Z O K L O 01 i - CN M N N N Qf W 00 ,^ N W W W Z cn - r TOE PROTECTION SEE DETAIL 22B-1 W/CL 'B' RIP RAP /��ST. 30 TONS S . 75 SY GF DIRECTIONAL ONLY END OF PIPE N/A POND CLASS 'B' E PLANS —Y8REV— RIP RAP DETAIL 22B-3 R-0623 22B EST. 1TONS P/ Sta 37+05.2/ P1 Sta 39+/5.44 EST. 5 SY GF A = 12' 38' 05H (LT) ' ,r✓ STANDARD BASE DITCH A = 12' 5B43.T (RT) b SEE DETAIL '22B-2' D = 3° 49'11.0' D = 2` 00'00.0' r✓t EST. 12 CY DDE No,uwl j —' FII STANDARD BASE DITCH EST. 15 TONS_CL 'I' RIP RAP EST. 20 SY GF - L = /7468' SEE DETAIL '22B-2' EST. 7 CY DDE EST 10 TONS CL 'T RIP P PLANTED I/r / EST. I4. SY GF PINES T = 93.10' Min. D=1 F1. SITE 26 TREES 4> ._p --CAT 'V' DITCH J F SEE DETAIL '22B-3' END C/A R0623-4 (GPS) —BY8— POT 15+96.14 PASTURE FOR DRAINAGE DITCH DETAILS SEE SHEETS 213-1 THRU 210-3 - 5" MONOLITHIC CONC. ISLAND 00 CO z DENOTES IMPACTS IN SURFACE WATER WN DENOTES TEMPORARY IMPACTS IN SURFACE WATER 100' 0' 100' 200' 300' GRAPHIC 'SCALE 5/ RICKY HARRIS PLANTED DB 489 PG 509 PINES PC 0 SLIDE 124D CLASS 'B' RIP RAP EST.3 TONS EST. 11 SY GF SPECIAL CUT BASE DITCH - SEE DETAIL '22B-5' END C/A .. .. _. .. _— —TREES c _ C 4� SR /554TROY-CANER RD �►_-YBREV— IITCH 48' W0 IL _ ` 7'0 CANS — ---- R— c -- R �� 7SS8 i iEV- +80.00 50' E�V5- +69.00 SPECIAL CUT \ BASE DITCH L1 SEE DETAIL '22B-5' PASTURE 86 DETAIL 22B-1 DETAIL 2213-2 TOE PROTECTION STANDARD BASE DITCH I Nw to Sc°Ie1 1 Nof,o 5<alel BENSON MORRIS No,u,ol NPhirol DB 283 PG 265 SPS Ground D 1.� Ground Notuml Ground b f Imo— = Geatenile B Min. D=1 Ft. d Mar, d=1 Ff. d=1Ft =3-5 b=2 Ft. GeoHHtile 8 k. Type of U.—CIE B Rip-Rop Type of Line,=CL I Rip-R°p FROM-Y8REV- STA. 31+80 TO STA. 33+30 RT-Y8REV- STA. 34+04+/- LT -RPD- STA. 11+14+/- RT FROM-Y8REV- STA. 35+70 TO STA. 36+50 RT E PLANS —Y8REV— / W ACQUISITION DETAIL 22B-3 R-0623 22B PI Sta 32+7724 P/ Sta 37+05.2/ P1 Sta 39+/5.44 LATERAL' e SDRCH A = 12' 38' 05H (LT) L = 3' 29' 37.0' (RT) A = 12' 5B43.T (RT) b D = 3° 49'11.0' D = 2` 00'00.0' D = I O( 00.0 No,uwl j —' FII L = 330.78' L = /7468' L = 185.4/' Ground:, D �A H. SIPPe T = 166.07' T = 87.3T T = 93.10' Min. D=1 F1. R = 1,500.00' R = 2,864.79' R = 8185/' 1, FC e = SEE PLANS e = SEE PLANS e = EXISTING FROM-YBREV- STA. 33+37 TO STA. 34+75 RT FROM-Y8REV- STA. 35+70 TO STA. 36+50 RT IINCOMPLE E PLANS PROJECT REFERENCE NO. SHEET NO. / W ACQUISITION PRELIMINARY R-0623 22B DO NOT USE FOIL CONSTRUCTION RM7 SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINCOMPLE E PLANS W NOT USE FOR / W ACQUISITION PRELIMINARY PLANS DO NOT USE FOIL CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED FOR PROFILE OF—Y8REV— SEE SHEET 57 FOR PROFILE OF—DR2213— SEE SHEET 58 Permit Drawing Sheet 3 of 4 Added 5/13/2016 DETAIL 226-5 SPECIAL CUT BASE DITCH IN— Sr°le) Nonm°I TN �D� L J Min. D=1 FI. B=2 Ff. FROM-Y8REV- STA. 36+50 TO STA. 38+50 RT FROM-Y8REV- STA. 36+00 TO STA. 36+50 LT SITE 26 Permit Drawing Sheet 4 of 4 Added 5/13/2016 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Roadway Fill Site No. Station (From/To) Structure Size /Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation Mechanized in Clearing Wetlands in Wetlands (ac) (ac) 8n Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) <0.01 11 2 L 30+39 to 30+81 Rt 15" <0.01 <0.01 <0.01 <0.01 39 34 3 L 53+20 to 55+42 2@8'x6' RCBC 0.02 0.02 0.03 <0.01 294 24 4 L 70+83 to 73+70 60" RCP IV 0.02 0.06 0.02 <0.01 271 73 2@10'x7' RCBC 0.05 <0.01 295 17 5 L 75+30 to 84+50 Bank Stabilization 0.01 62 5A Roadway Fill 0.04 0.02 500 5B Roadway Fill 0.01 5C Pond 0.02 0.02 0.34 6 L 120+95 to 121+90 Lt Roadway Fill 0.08 7 L 122+87 to 123+78 Bank Stabilization <0.01 43 7A L 124+42 Lt Bank Stabilization <0.01 16 7B L 124+91 to 128+04 Roadway Fill 0.16 0.02 <0.01 355 72 8 L 131+38 to 132+10 Lt Roadway Fill <0.01 <0.01 <0.01 10 9 L 137+97 to 138+55 Roadway Fill 0.03 10 L 150+48 to Y6 11+00 Rt Roadway Fill 0.14 <0.01 0.13 1 10'x6' RCBC 0.03 0.01 319 56 11 L 187+35 to 188+66 Bank Stabilization <0.01 47 Roadway Fill 0.01 0.01 105 21 11A L 187+80 to 187+98 Bank Stabilization <0.01 6 12 L 203+49 to 206+55 2@12'x8' RCBC 0.10 0.01 499 38 13 L 228+85 to 229+98 Roadway Fill 0.05 0.04 54" RCP IV 0.02 0.01 229 60 14 L 241+68 to 242+88 Bank Stabilization <0.01 12 66" RCP -IV 0.02 <0.01 370 31 15 L 250+61 to 251+71 Bank Stabilization <0.01 51 TOTALS: 0.68 0.04 0.27 0.68 0.08 3660 452 Stream Bank Stablization Sites 1-15 = ATN Revised 3/31/05 248 feet Permit Drawing Sheet 90 of 91 Revised 5/ 13/2016 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS MONTGOMERY COUNTY WBS - 34352.1.1 (R-0623) SHEET 5/13/2016 Roadway Fill 0.13 0.02 0.01 <0.01 136 16 1 L2 26+14 to 28+48 Bank Stabilization <0.01 11 2 L 30+39 to 30+81 Rt 15" <0.01 <0.01 <0.01 <0.01 39 34 3 L 53+20 to 55+42 2@8'x6' RCBC 0.02 0.02 0.03 <0.01 294 24 4 L 70+83 to 73+70 60" RCP IV 0.02 0.06 0.02 <0.01 271 73 2@10'x7' RCBC 0.05 <0.01 295 17 5 L 75+30 to 84+50 Bank Stabilization 0.01 62 5A Roadway Fill 0.04 0.02 500 5B Roadway Fill 0.01 5C Pond 0.02 0.02 0.34 6 L 120+95 to 121+90 Lt Roadway Fill 0.08 7 L 122+87 to 123+78 Bank Stabilization <0.01 43 7A L 124+42 Lt Bank Stabilization <0.01 16 7B L 124+91 to 128+04 Roadway Fill 0.16 0.02 <0.01 355 72 8 L 131+38 to 132+10 Lt Roadway Fill <0.01 <0.01 <0.01 10 9 L 137+97 to 138+55 Roadway Fill 0.03 10 L 150+48 to Y6 11+00 Rt Roadway Fill 0.14 <0.01 0.13 1 10'x6' RCBC 0.03 0.01 319 56 11 L 187+35 to 188+66 Bank Stabilization <0.01 47 Roadway Fill 0.01 0.01 105 21 11A L 187+80 to 187+98 Bank Stabilization <0.01 6 12 L 203+49 to 206+55 2@12'x8' RCBC 0.10 0.01 499 38 13 L 228+85 to 229+98 Roadway Fill 0.05 0.04 54" RCP IV 0.02 0.01 229 60 14 L 241+68 to 242+88 Bank Stabilization <0.01 12 66" RCP -IV 0.02 <0.01 370 31 15 L 250+61 to 251+71 Bank Stabilization <0.01 51 TOTALS: 0.68 0.04 0.27 0.68 0.08 3660 452 Stream Bank Stablization Sites 16-26 = 145 feet Permit Drawing Sheet 91 of 91 Revised 5/13/2016 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation Mechanized in Clearing Wetlands in Wetlands (ac) (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft Natural Stream Design (ft) 16 L 262+36 to 264+32 30" RCP -III 0.14 0.01 17 L 264+70 265+86 54" RCP -111 0.10 0.01 0.03 0.01 <0.01 280 57 to Bank Stabilization <0.01 21 18 L269+62 272+04 42" RCP -111 0.11 <0.01 0.02 0.01 <0.01 297 44 to Bank Stabilization <0.01 22 19 L 282+75 to 283+36 Roadway Fill 0.04 19A L 282+68 to 283+49 Roadway Fill 0.01 0.02 19B L 283+33 to 283+47 2@11'x7' RCBC <0.01 17 19C L 283+47 284+20 2@11'x7' RCBC 0.05 340 to Bank Stabilization <0.01 9 20 L 316+99 to 317+88 Roadway Fill 0.05 21 L 338+46 340+55 Bank Stabilization 0.01 75 to Causeways 0.08 112 22 L 350+09 to 352+49 Lt Pond 0.55 23 L 362+75 to 364+14 Rt Pond 0.48 24 Y7 15+26 to 15+49 Lt Roadway Fill <0.01 <0.01 24A Y7 15+63 16+31 48" RCP 0.04 0.02 0.01 <0.01 240 18 to Bank Stabilization <0.01 10 25 RPD 11+14 11+73 to 72" RCP -IV 0.02 <0.01 270 28 26 YBREV 33+36 34+13 54" RCP -IV 0.01 <0.01 66 7 to Bank Stabilization <0.01 8 SHEET TOTALS SITES 16-24A): 0.49 0.02 0.11 1.14 0.10 1638 283 SHEET TOTALS (SITES 1-15): 0.68 0.04 0.27 0.68 0.08 3660 452 TOTALS: 1.17 0.06 0.39 1.82 0.17 1 5298 735 Stream Bank Stablization Sites 16-26 = 145 feet Permit Drawing Sheet 91 of 91 Revised 5/13/2016