Loading...
HomeMy WebLinkAbout20041235 Ver 1_Email_20071030Re: DWQ Lab Certification ~~- ~~~~ Subject: Re: DWQ Lab Certification From: Larry Eaton <Larry.Eaton@NCMail.net> Date: Tue, 30 Oct 2007 07:42:48 -0400 To: Christine Miller <CHDMiller@mbakercorp.com> CC: Trish MacPherson <trish.macpherson@ncmail.net>, Eric Kulz <Eric.Kulz@ncmail.net>, John Dorney <john.dorney@ncmail.net> Hey Christine, You have the situation correct, Dave and Wendell Pennington are the only people who should be doing the IDs. I know the Certification process is a pain in the neck; but the only way to keep this (who IDs samples) from spinning out of control, is to insist on some sort of baseline. My mistake with Dave was to let him slide while he "worked on getting certified". Two years later he had done nothing toward that end. After I told him I was rescinding his special status (it really wasn't fair to all the other biologists out there) he got serious and you now have double the choices of biologists. Bobby and Chris appear to be in a similar situation. They have been talking to Trish for years about getting certified, but have never gotten around to it. I suspect that if you call them and say "Larry is being a hard ass and I can't use you guys until you are certified" that they, like Lenat, will discover some more urgency in their application process. What I can offer is to talk to Trish and see at what point in the certification process she thinks indicates when someone is serious about getting certified and is likely to succeed (maybe after they pass their bug test?). If you were willing to help me light a fire under these guys to get certified, once Bobby and Chris get to that point in the process, I might (gotta check around here to be sure its OK) be willing to let them do your (and only your) samples again until they finish the process (assuming they don't stall out). And then there will be 3 labs - good for everyone. Larry Christine Miller wrote: Hi Larry, I checked in with Trish, she said that the only people in North Carolina who are certified are Dave Lenat, Duke Power, Progress Energy, and Mecklenburg County, then there was Wendell Pendleton from Tennessee. As Trish explained to me, Duke, Progress, and Mecklenburg don't contract out their biologists. I guess my question is, moving forward, can I only use Dave Lenat or Wendell Pendleton to id my 401 samples? I'd like to keep using Chris and Bobby since we have a working relationship established, but want to make sure we are doing what we have to. Thank you! Christine Christine Miller Baker Engineering NY, Inc. 1447 S. Tryon Street, Suite 200 Charlotte, NC 28203 704-334-4454 main line 704-319-7898 direct line 704-334-4492 fax chdmiller@mbakercorp.com Larry Eaton <Larry.Eaton@NCMail.net> 10/25/2007 7:21 AM »> I Hey Christine, Actually, I really don't get a say in who is or is not qualified. That is a job 1 of 2 2/7/2008 9:06 AM Re: DWQ Lab Certification for Trish and her Lab Certification program http://h2o.enr.state.nc.us/esb/ATUwww/Default.html#labcert I just assumed that Tony LaRoux in Charlotte and Chris and Bobby in Durham had gone through her Certification process and that they were only doing samples for their respective cities, which don't have an impact on the regulatory game. The only person I "approved" without certification (and that temporarily) was Dave Lenat, who has now bridged the gap and has become a Certified Lab. That temporary "unofficial certification" was probably a mistake, which I hope not to make again, so recently I proposed an alternative Certification process for identifying 401 projects (see attached). For people who don't want to go through the Lab Certification program, this alternative could be an easier way to demonstrate taxonomic expertise. while this is not official policy yet, I am confident that something similar to this will eventually be adopted. If you were interested in doing your own samples, either one of these methods of demonstrating expertise would be acceptable to me. Let me know if you have any further questions. Larry Christine Miller wrote: Hi Larry, we always use Bobby Loque and Chris Outlaw for macro id. I recently was asked by the City of Charlotte to state how they are certified to do bug ID. Chris told me that when Greg Price worked for us, you and Greg talked and you decided that they were qualified to do the work that DWQ certified labs do. I was hoping you could help me with the wording on that - are they certified by DWQ or acknowledged as qualified or how do you usually state that? Hope all is well - thanks!! Christine Christine Miller Baker Engineering NY, Inc. 1447 S. Tryon Street, Suite 200 Charlotte, NC 28203 704-334-4454 main line 704-319-7898 direct line 704-334-4492 fax chdmiller@mbakercorp.com 2 of 2 2/7/2008 9:06 AM