Loading...
HomeMy WebLinkAboutNCG020046 DMR WW (2)11 ANNUAL SUMMARY DMR - WASTEWATER 11 SEND TO CENTRAL OFFICE* PROCESS MINEMEWATERING WASTEWATER GENERAL PERMIT NO. NCG020000 * Report All Wastewater discharge monitoring data on this form (including No Flow and No Discharge and Permit Limit Violations): by MARCH 1 of each : ear:, -If 53;: . you have limit violations. you must -also have turned in a Limit Violation DMR to vour local Regional Office within 30 days of receiving sample results`ft6m aaUla CERTIFICATE OF COVERAGE NO.%f ` GtW FACILITY NAME: Vulcan Construction Materials, LP./Penrose Ouarry PERSON COLLECTING SAMPLES: Chad Hodges CERTIFIED LABORATORY:Research & Analytical Labs Lab #34 Lab # LIMIT VIOLATIONS? YES ❑ NO X Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 FEB 2 3 2016 COUNTY: Transylvania PHONE NO. 828 877-3441 CENTRAL FILES ADD TO LISTSERVE? YES ❑ NOD EMAIL: nNodr, SPCTION INDUSTRIAL SANDI? ElDISCHARGING TO SA WATERS°. ❑ Outfall No. Date Sample e Collected Total Flow Total Suspended Turbidity' Settleable Solids pH Fecal Coliforms - mm/dd/yr MG mg/l NTU mUl Standard col/ml 2,1 001 No flow 01/01/15 -03/31115 002 01/29/15 1.075 <5.0 5.30 <0.1 7.0 N/A 001 No flow 04/01/15- -06/30/15 002 06/18/15 0.882 21.2 16.4 <0.1 7.4 N/A 001 No flow 07/01/15 -09/30/15 002 No flow 07/01/15 -09/30/15 001 No flow 10/01/15 -12/31115 002 10/14/15 0.647 <5.0 7.69 <0.1 7.3 N/A ' All mines must monitor WW discharges for TSS. Only industrial sand mine discharges are subject to TSS limits. 2 If an effluent limit is exceeded, the permittee is required to institute monthly monitoring for that parameter for the remaining permit term. 3 The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the Stormwater Discharge Outfall. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the discharge. 4 Only facilities discharging to SA waters are required to monitor for Fecal coliforms. Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11 Page 1 of 2 Part A Continued: Wastewater Monitoring Requirements Outfall No. Date Sample Total Flow Total Suspended Turbidity3 Collected Solids Settleable Solids pH Fecal Coliforms 2,4 mm/dd/yr MG mg/1 NTU mUl Standard coUml MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", `ANO DISCHARGE" & LD41T VIOLATIONS) BY MARCH 1 OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly resp9mible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware tbdjR1Wre,Q�r ignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." /%-yam February 8, 2016 nature of Permittee) (Date) 1/1/2010-12/31/2014 Last Revised 02-02-11 Page 2 of 2