HomeMy WebLinkAboutNCG020159 DMR SW (3)ANNUAL SUMMARY DMR - STOIRMWATER
II SEND TO ' CENTRAL OFFICE * ' , II
STORMWATER DISCHARGE OUTFALLS (SDO)
GENERAL PERMIT NO. NCG020000
*Report ALL STORMWATER,Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH 1 of each
CERTIFICATE OF COVERAGE NO. NG�O20 121
FACILITY NAME: Vulcan Construction Materials, LP/Elkin Ouarry
PERSON COLLECTING SAMPLES: Marty Taylor
CERTIFIED LABORATORY:Research & Analytical Labs Lab #34
Lab #
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015 FEB 2 3 2016
COUNTY Spay
PHONE NO. 336 835-1439 CENT
ADD TO LISTSERVE? YES El NO El EMAIL: n `zt MONS
Outfall
No.
Date Sample
Collected
(mo/dd/ r OR
NO FLOW)1
In Tier 2
Monthly
Monitorin g�
(y/n)
# of Months in
Tier 2 Total Flow
2
Sampling (MG)
Total Suspended
Solids
(mom)
Turbidity
(NTU)
Settleable
Solids (mill)
Total
Rainfall
(in)
Event
Duration
(minutes)
-
-
-
- -
100 '
See Footnote '
0.1
002
02/09/15
0.024
<5.0
3.77
<0.1
0.20
180
003
02/09/15
0.118
<5.0
3.70
<0.1
0.20
180
005
02/09/15
0.019
<5.0
2.96
<0.1
0.20
180
002
07/14/15
0.036
71.0
14.1
<0.1
0.30
240
003
07/14/15
0.178
23.8
19.1
<0.1
0.30
240
005
07/14/15
0.029
54.3
12.4
<0.1
0.30
240
' If "NO FLOW ' or "NO DISCHARGE, Enter "NO FLOW'or or "NO DISCHARGE" for each outfall here and the Date Range.
2 Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range
3 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit.
4 TSS benchmark values are 100 mg/1 except in ORW, HWQ, trout, and PNA waters where they are 50 mg/1.
'The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated
as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO.
Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO.
Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11
Page 1 of 2
Part R: Vehicle Maintenance Activitv Monitoring Reauirementc for facilities using > 55 gal of new motor oil/month on average
Outfall Date Sample In Tier 2
No. Collected Monthly
(mo/dd/yr OR Monitoring?
NO FLOW) (y/n)
# of Months New Motor
in Tier 2 Oil Usage
Sampling2 (al/month)
_
Total Flow TPH using method
(MG) 1664A SGT -HEM
(Ing/1)
Total Suspended pH Total Event
Solids (Standard Rainfall Duration
(1119/1) Units) (in) (minutes)
_ 153
1003' 4 6-93
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES
AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES [-]NO X
HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑
WHO AT THE REGION HAVE YOU SPOKEN WITH?
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE" & LIMIT
VIOLATIONS) BY MARCH 1 OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6300
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. at there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations.
February 8, 2016
(Date)
Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11
Page 2 of 2