Loading...
HomeMy WebLinkAboutNCG020511 - DMR SWANNUAL SUMMARY DMR - STORMWATER SEND TO CENTRAL ' OFFICE STORMWATER DISCHARGE OUTFALLS (SDO) GENERAL PERMIT No. NCG020000 ;Report ALL STORMWATER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH 1 of each year. CERTIFICATE OF COVERAGE NO. C ,2--0. 11V SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Vulcan Construction Materials, LP/Spruce Pine Quarry COUNTY Mitchell PERSON COLLECTING SAMPLES: Gary McMahan PHONE NO. 828 688-4200 CERTIFIED LABORATORY:Research & Analytical Labs Lab #34 ADD TO LISTSERVE? YES ❑ NO ❑ EMAIL: Lab # Part A: Stormwater Monitorine Reauirements 'RECEIVED FEB 2 3 2016 CENTRAL FILES DWR SECTION Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 In Tier 2 Monthly Monitoring? (y/n) # of Months in Total Event Total Suspended Tier 2 z Total Flow Solids Turbidity Settleable Rainfall Duration (NTU) Solids (MIA (in) (minutes) Sampling (MG) (mg/0 - - - - - 100 ' See Footnote3, 0.1 003 No flow for 2015 004 No flow for 2015 005 No flow for 2015 006 No flow for 2015 007 No flow for 2015 'If "NO FLOW' or "NO DISCHARGE, Enter "NO FLOW'or or "NO DISCHARGE" for each outfall here and the Date Range. 2 Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range 3 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. 4 TSS benchmark values are 100 mg/1 except in ORW, HWQ, trout, and PNA waters where they are 50 mg/1. 5 The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11 Page 1 of 2 Part B: Vehicle Maintenance Activitv Monitoriniz Requirements for facilities usinE > 55 Sal of new motor oil/month on average Outfall No. Date Sample Collected (mo/dd/yr OR 1 NO FLOW) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 22 Sampling New Motor OR Usage (al/month) _ Total Flow (MG) TPH using method 1664A SGT -HEM (1119/1) Total Suspended Solids (mg/1) pH (Standard Units) Total Rainfall (in) Event Duration (minutes) _ 153 1003,4 6-93 002 06/02/15 >55 0.003 <5.0 <5.0 6.4 0.16 120 002 12/14/15 >55 0.002 <5.0 <5.0 6.5 0.12 120 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES []NO X HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ WHO AT THE REGION HAVE YOU SPOKEN WITH? MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE' & LIMIT VIOLATIONS) BY MARCH 1 OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6300 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am a ar that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." />/% of Permittee) : 1 / 1 /2010 -12/31 /2014 February 8, 2016 (Date) Last Revised 02-02-11 Page 2 of 2