HomeMy WebLinkAboutNCC250891_Site Plan or Location Map_20250327 �s.,n`B �, _ �J _ \ _ \\� \��\� MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION
General-All measures will be inspected and corrections made after runoff producingrainfalls or at least onceper week minimum. The builder will insure that the construction activities on anyparticular lot do not adverselyaffect anyof the installed erosion control
-� -� e R \� P
i i �.' \ measures. If lot construction dictates,measures will be relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control
'�F' _� \ �� manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover.
o��` o j _ -4--
�\ \\_ __ \ Gravel Construction Entrance-The pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it
'b - �_-_ 'j - - ` _ - out as necessary. Immediately remove all objectionable materials spilled,washed,or tracked onto public roadways.
04' r`-'�6 _ �- i- \ c. -cT. Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be
_� �- ``� uM removed and disposed of properly to insure that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations.
o Ex°� - - - _i -'/ ^ Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to
q ¢° _� / / \ - -• close,since this could inhibit adequate growth and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.
TESA
' �- �- �� - Greasing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as en initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are
-- / -- 11I wA E germinating properly. Any bare areas should be repaired, and reseeded as soon as possible. If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of abed i , „-.,.. ounET Permanent gras.
P __ _ _ ,LT
• '' �- 1 \ 1 Wattles Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the
/ I\ vosonrCE E Y, wattles functional freeboard height.Removed sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water.
®; i �- \ t.
^er�SILT
Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it
SITE - - - = /_\\ \\I \Gory G , becomes clogged with sediment.Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized.
\��\\\� , ��`2� \ 2 �\\�
MONTROSE ROAD o - f \ �L:vunnnC ON "R i O I \
SR-1x/5 TQ
, )
�� - VAVA�\ ILT Pf, °
l''‘' li SILT FENCE
/ 1 ��trvP1 EI FORCED / // CONSTRUCTION SCHEDULE DATE: PAGE:
o A� \ \1 7'2'97:1-'''
1 Rs // /// /� -0 1 Obtain ell neeeeeary Permlre and Plan approval E - d 9ed'mmt Convol(E&SG)Permit and a Canlfieate aC Covttage
NFOLISI
S / \u 0 ® TL (COG) be b dbefore anY land denrb g .ADopy of@e E@SC PmniS Me COC and aM1aN copy of the
ry o plan ta b kep preferably m a permits 6 d bl during mspxtion.
A )
�w �o h / 2 1 Wlgm 1 utrancea lim,then sit f f ed ilt£race ^q^ •g• ^C^\ d I .aLty % 3.F h 1 d bb' as the lots as the are slened. ■
b'i a / �
^' 3 1`-n•. g grubbing any necessary are Y r q Y! ✓! 1l 1ti
�. $ o m / d.Begin lot grading®d excavation activities 1' T( Jl tt p
-e THIS PROJECTHASS��SLOPES S.Begin orcoannue with house mviu Shies wties. ¶ €-
\ /'
¢9 THAT ARE 8%OR QREATER /aueflo I I EN " j/ \// / 6 Finish all rough grading and house construction.All areas not disturbed for]days needs to have temporary or Permanent
e TEEP SLOPES EXP099ED DURING G� I.
1 I / / groandcover installed. '� 1/N R
0; 10 // ].Instal driveways,walks and patios. ¶ ff �'1.II, �G HOUSE WC NSTRUCTION MUS BE MATTEp U L+"' / g Begin fine grading of lm areaslA Ja ^ s j�/ / 9 Final grassing mulching and b I' B f I I M TI iwolve the installation of sod on Ne lot The silt fence will yyI .1 - L a , J , fOUS
7 E eE : � ,e / /\ remain pl Tm I ddea gr e bT a stakes hold _ AY -Ru r AY - L.+ IY
M12>�2 SA-1Te I d �� // 10 The con hall d If- p of Me dsedimentation control measures and complete the following C ROADWAY VICINITY MAP' °° a _I CONS _ �/ combinedself-inspectioncod GRe NLET� DF°D"" -HD AY -RG AY -RDAs AY
/ / hnpa//www dal. /bo t/d' / d l d es/ormwamr/swanwater progmMnpdes consmrcnoa progam Notes one
1 Twelve months of complete inspection forme shall be kept on site and available for inspection at all times.It is recommended a 1.If needed,Tree Protection fencing should be installed along the buffer z wetland
\\ N.T.S. \ I ' k� � // copy be kept in epermits box.Ref G.S.113A-54.1 though G.5.113A-57Secrioru lSA NCAC 04A 0101 through lSA LEGEND boundary and/or around protected trees,providing a radius of at least 1.25 feet for each
- \ I \' 4 / / NCAC IME.0504 General Permit MCC 01INI00 NPDES for Construction Activities. inch of trunk diameter.
777��� I -/ / I 11.Self-inap«[ions for erosion and sedimentation control measures are to be performed at least Dace every seven calendar days and 2.Inatall Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on
\ '\ �1 / / within2A hours of every min event of greater than linch.Any needed repairs shall be made immediateymmainrsin measures as N (= W schematic/diagram and field adjusted,if necessary,for placement at low points.If lots are
\\ I \ -' __
I yao/- / designed.All ESC measures shall be maintained as specified in the construction details on Mis plan.A rain gauge shall be installed contiguous and have different land owners or builders,each lot should have individual Silt
\ ss2i m the project site for...,acceptance
l Fences.
__
/ 12.Inspection and Taal azceptanu levers.When the project is coincide,the permrttees shall contact DEMLR to close old the EffiSC coNSTRUCTION ENTRANCE\ / .,_ Plan.AflttDEMLR informs the p<rmitreeof Lh<proj«tcloae out,via inspection report,the permitter shall visit
3.Install requiretl Silt Fence within l0 feet of property line to ensure there is no conflict with
I`I/ "dlanmager DEMLI"m submit Me permit o the protice jectclos termination out,viNOTI.Anrepoannual geaaalpermit fce will be charged septic system.It is the responsibility of the builder to ensure the installation of sediment
\ ' ' e' \ ( ( \ until the o-NNOT has been filled out. CURB INLET m control measures does not impact the septic system and repair area(s).
\ \ 4.At least one Construction Entrance/Exit is to be installed per lot.
GROUND STABILIZATION \ \ c
5.Waste bins and other areas dedicated or managing building material waste shall be at
\\ \ least 50 feet away from storm drain inlets or drainage ditches unless k can be shown that
SITE AREA STABILIZATION - I o other alternative exists.If this separation cannot be achieved,these areas must be
EXCEPTIONS A•SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS contained behind Silt Fence.
DESCRIPTION TIME FRAME \ \ \ 113A-54.1'IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN 6.Inlets downstream of disturbances should be protectetl;streets should be swept when
PERIMETER DIKES, 7 DAYS NONE \ Amh ALTERNATIVE
SPREADSHEET. sediment from the construction activity is present.
SWALES,DITCHES& \ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND .ANC-Environmental.jpeg 7,Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are
SEDIMENTATION CONTROL PLAN THAT IS KEPT ON
B.
sion and sediment
details are not
MN.„,
HIGH QUALITY 7 DAYS NONE 1 EEACH MEASUIR0131 STATES E C"...DOCUMENTATION SHALL BE OPRAO ICE SHOWN OR BY
A CCOPY THE THAT DATING APPROVEDE D SIGNING OSIIONN ANPECFCOMPLISHED BY INITIALING AND /ONNG provided on add..she..
YP AL LOT LAYOUT WITH CURB AND GUTTER
to stela.
SLOPES
WATER ZONES \ anrelli
1
(HQW) \ J // / REPORT AND LISTSEDIEACH ION CONTROL
OL PRACTICE OR DEVICE SHOWN ON THE APPROVED
SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' \ - � `', EROSION AND SEDIMENTATION CONTROL PLAN:'
THAN 3:1 OR LESS INR LENGTH / / - /
AND ARE NOT 0
STEEPER1THAN 2:1, / / / //
14 DAYS ARE
ALLOWED / \ /
SLOPES 3:1 OR 14 DAYS 7 DAYS FOR \ / ami / SODDING DATE: PAGE:
FLATTER SLOPES GREATER / / \
TIGHTLY AGAINST..OTHER.
THAN 50'IN LENGTH allni
/ALL OTHER AREAS 14 DAYS NONE(F�(CEPT FOR \ \ •„�WITH SLOPES PERIMETERS AND Ma • 'uer'.. • \ M ..• ,^11.°,==r, .
FLATTER THAN 4:1 HQW ZONES) / ENos AND m MM Na PIECES.
\ \ \ Ina M �oaa i'I
-Epnnaaam. iyi.
DATE: Silt sock/wanly ......... PAGE: \� I I r QJ 1vl wlwl'ISIwI51 ' n
u T t s og.wee s„tsuwrea rot \ o •\ I I \ L Dw� ) \ /�i I �iyiyiyiyiyiyiyi3i►
NOTE:
/,r stakes ea -11.,_._ 11 R_.II, ° I _7!1-r,_ 'I wI wlSl col col col col col col 1 1
21x 21 to Me desired 71 1d the toe of a \ \ � 'F•sisisi sisisi sisi5i
1Y' ''I a 1)M .I Illr \1� \ \� 10
/ eMln_ t 1
SECTION SECTION beyll \ IY, nYi 4 YY IIIg guy
s
should be instal.parallel to
ope.
s
flat a«endand a refl..of 10 feet e o t \ \ ��, A \ V� VA\ it Bill / �li� ,�
e'sock/mn ;o'abe me"silt
uhgyapa�pro p wATFaTn.paPmDF, g�.
'20 4.OF' elks, froms around eerie or e 1 ( corm Txswr Y uiosaouroas TwrAia soo sta nicn lz al cMowea „
slit ameuaace
III „I 4ble hardwood inch x 2 inch cross section 'aM makes
PIM
_ APPEARANCE OF GOOD SOD Construction: Maintenance.
W I, 1.Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-Ot inspect at least once a week and after each 1 inch or
W the
paced at as�a I1I II� I �� j material and properly grade it. greater rainfall:make any requiretl repairs immediately.
CompostTrench into Wood Mulch or ground 4 Min. me ear aop✓weme la p ea�n a 4,ncn / "T I IIaYI Ip^�I Ilppp llrnIlppIlI n IpI1 xa.eaxr_ T' 2.Place the gravel to the sperAfle grade and dimensions shown on the plans,end 2.from Lein the gravel Per In a site. his Prevent mud periodic
merit
maximum Imam / \ 1II{1I/'I�I III lu�l^' smooth IL from leaving the construction site.This may require periodic
To lre Mg.of logs. ble Ile.when J tl IYIp RRR4 „ 3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone.
uNTRENCHEOINsruunory pavement)heavy / / ila� I I I - oor o 4.Use geolexlile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or
on�vem a / / / ssi \\ / / I I - .eauemrzmne subject to seepage or high water table. tacked onto public roadways.
ISOMETRIC ""0°`vv0X1cVX0•.,,`°ern,.•e,.m•:e�w,w...,,:. MAINTENANCE: °B n'npasaethnni mnofievente. / /
y
` roM�T«d Na�Fro s 1. Inspect silt sock...at least weekly and In aftereach 1 inch or greater rainfall.Remove
accumulated s.rnent and any debris as -- _- \ / //\ / / I _ "'az" m r..r CONSTRUCTION ENTRANCE/EXIT
.Gnrrenroeeann Slit sock/Wafflemust be replaced if i 1 NIS
/ / )
I Pie °� °' tam^^' Zit, got.)
trm^^' °'°^' 3 «g r / M o General Erosion Control Notes
ah«tom „rer. \ !� o
warkA �=:'"''''''"nt Braail azeml postal Pre. Ore./ ° -- ,tint/ / ;R 1.Only the areas shown shall be disturbed,
re T,myn cow qi vn m,l p4ri l 1+ 1 vsi nou°m"ml m� ' ...nee
..nemeasure e is permanently binam, __ s / � 2.All dlstu eed areas shall be grassed and
/ // // Z mulched a soon as possible and maintained
a s e'Wi°Bnrees eeop'«ap'sae BdbOwn°i _ / IMMi, / / until pain ant cover is established,
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION J
\ � -� a MI 1 \/ \\ / /� �/
\ \\j,;
PATE: Pon IT Marc Standard Strength fob rare Wire Fence \a�Rlter Fabric PAGE:PAGE:1 \ I 1 ^ ' -- -----/
//\ /
"" sMax.Exnas g nc without wire fence Fence anti Compact \ / /
,, f 50 P4at \_.\maghly Up slope ., - -' - 4 / / _ 4MIN. . FENCE
\ I /� CAi2 / /\ \ DATE: PAGE:
Plastic a24• \ \ I .7.**.
� \ i \ �j ���
k
r iiiiiiii iiiiiiii iiiiiiii PAGE 1 of 2
1 �ab Manama" I I l J� / / \ // \ TOTAL DISTURBED ACREAGE:2.19 ACRES
1 �\-PH.Pere, �� / /\ /� j \ /i\ /\ •
LOT EROSION CONTROL PLAN
I Construct the 2 Ensure that the height pfthWier sedimentfenedoes oteWap tchesabotvicef the ground.(Higher fencesrer CROSS SECTION YEw ' I \\ 1 \\// / // / \\cture) STEELFE CEPo TEDaTABOVE THE TOP LOTS 26-30
3. :,erafiltery°,� continuous roll p°with4rwtMi avoid wdaPotheneXpas
may impound / i HIDDEN
4.Stipp.Standardstrentthglerfabricbywiremeshfasteneds«arely, .unslnne elan of the sosts.Extena I \ (17 7�\ RARmAREGLGTRI R°rvT IEw VALLEY
memenMenfabaconMeupslope Inspepaedimenttanroamleastonceaweeka.aftereach1 •
BURY WIRE FENCE.
the wire
Me
side of prength. inch or greaterranfal Make any requiredreparsimm.aireely.IheenarFILTER F.RIC.
wfe theg npan n moed°apnapaalaamaximumof8feetapae. ppa uldbean"an 2a'Shouldthefebaaofa'«aimemtencecollapse,tearaecompose Y ng \ \` C \ \ \ wLTER0Er°rvE "I _ cL°,NINrRENGR FOR
AND HARDWARE
dreremfi «uray rep«aeaiLpmmpdy - \ o:+l e•�6 brentheltterfaer'cai with .W spacing c.Iles dheveam supped ea NTGaGLDGRGk/No DREAM FINDERS HOMES LLC
s.noth. fence.Take marey4 inches wise and p a proposed line posh aria rem avoid undermining the fence during I w$,�,• ,sya/ 3 1 I / / \ 8:, i oN OaourvO NOHa aware cloth and gavel shouldoveray the silt fence at least l2 f 7.Excava a trench appro d o^
8.Plae°;ta'nches°o calongthennanmandsideofthetrench. rtheconabiment contributing \ V 'R- • \ o°ono•::I nehea. QUEWHIFFLE TOWNSHIP HOKE COUNTY
s.BecMll the trench with Sall placed over rebnc ana compactor Thorough mmpacbon of the bacxgll is aalnage area has properly Mlaea \ ...^..^ . ^^.... j^7 I 2.Stone outlets should be placed on low elevation areas of silt fence
D.Daaat attach filter 6auLaex g ea. \ I \ 1¢ \ l l ) aNTENAtlon6eldmnaitmna
critical maafeareper marine I\R SCALE:1"=120' MARCH 2025
existing I \ ` MAINTENANCE:
\ BURYWIREFL°T" FluncnrvFUPPEREDGEHF I.Per NCG-01,inspect outlet at lest on.a week and atter each iately inch or GRAPHIC SCALE
..W C-Envin.m,entel.jwe greater rainfall event.Complete any required repairs immediately. 120 0 60 120 240 480
SILT FENCE \ \ \ \ \ \ \ SECTION IDNYIEw 2.Keep Freshe
stone whendebris
sediment vide adequaexceeds6in has.
3.Keep mesh free of tlebris to provide adequate flow. = � 11
\ 4.Remove sediment when half of stone outlet is covered.
1 \�\ \ ) 4*4), 1 5.Replace stone as needed to facilitate tie-watering.
/ -.WC-Envltc nuddel.jpoN ( IN FEET ) 11
SILT FENCE OUTLET 1 inch = 120 ft.
\ N, 1 \ 11 \ \ I I I /// / ' - 4 MOORMAN,KHIZER ONE&9101TZEL,INC.484-191115 FAR F484T 388 LICENSE E4F-1 6 LE, C.28305
( I (910)
LAST SAVED:3/13/2025 3:35 PM LAST PLOTTED:3/13/2025 4:45 PM PLOTTED sl'.Dennis Gilbert FILENAME:O:\CURRENT JOBS\H a H CONSTRUCTORS\24-136]-03HIDDENVALLEY-EC\P1ANS\EC-LOT526-30.Des