HomeMy WebLinkAboutNCG020108 DMR WW (2)ANNUAL SUMMARY DMR - WASTEWATER N
II ' . SEND TO CENTRAL OFFICE* � - . 1 II
PROCESS MINEMEWATERING WASTEWATER
GENERAL. PERMIT NO. NCG020000
* Report All Wastewater discharge monitoring, data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH 1 of each year. ,If
,you have limit violations, you must also have turned in a Limit Violation DMR to your local Regional Office within 30 days of receiving sample results from a lab._
CERTIFICATE OF COVERAGE NO. NCG020108
FACILITY NAME: Vulcan Construction Materials, LP./Gold Hill Quarry
PERSON COLLECTING SAMPLES: Megan Fish
CERTIFIED LABORATORY:Research & Analytical Labs Lab #34
Lab #
LIMIT VIOLATIONS? YES ❑ NO X
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR:
COUNTY: Cabarrus
PHONE NO. 704 279-5566
ADD TO LISTSERVE? YES ❑ NO[
2015
EMAIL:
INDUSTRIAL SAND'? ❑ DISCHARGING TO SA WATERS49 ❑
Outfall No.
Date Sample
Collected)
Total Flow
Total Suspended
Solids'
Turbidity3
Settleable Solids
pH
Fecal Coliforms C`;
-
mm/dd/yr
MG
mg/l '
NTU21'
ml/1
Standard
col/ml '
001
03/02/15
1.222
<5.0
1.72
<0.1
7.0
N/A
002
No flow 01/01115
-03/31/15
001
05/11115
1.228
<5.0
1.02
<0.1
7.4
N/A
001
05/11115
1.228
<5.0
4.0
<0.1
7.3
N/A
002
No flow 04/01/15
-06/30/15
001
07/28/15
1.240
<5.0
1.30
<0.1
6.6
N/A
002
No flow 07/01/15
-09/30/15
001
12/16/15
1.295
<5.0
2.09
<0.1
7.8
N/A
002
12/16/15
1.402
<5.0
1.73
<0.1
7.4
N/A
' All mines must monitor WW discharges for TSS. Only industrial sand mine discharges are subject to TSS limits.
2 If an effluent limit is exceeded, the permittee is required to institute monthly monitoring for that parameter for the remaining permit term.
3 The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs
designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the
Stormwater Discharge Outfall. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the discharge.
4 Only facilities discharging to SA waters are required to monitor for Fecal coliforms.
GW[
EB 2 3 2016
TRA' FILES
'� SEC 11CP,f
Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11
Page 1 of 2
Part A Continued: Wastewater Monitoring Reauirements
e
Outfall No. Date Sample
Collected
Total Flow Total Suspended Turbidity3
Settleable Solids pH Fecal Coliforms
- mm/dd/yr
2,4
MG mg/1 NTU213 MIA2 Standard 2 col/ml
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE" & LIMIT
VIOLATIONS) BY MARCH I OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
Permit Date: 1/1/2010-12/31/2014
February 8, 2016
(Date)
Last Revised 02-02-11
Page 2 of 2