Loading...
HomeMy WebLinkAbout20080067 Ver 1_Application Returned_20080207~OF W ATFR p Michael F. Easley, Governor `~ L!i William G. Ross Jr., Secretary Cq r~'.. North Carolina Department of Environment and Natural Resources ~ ~ p .,~ Coleen H. Sullins, Director Division of Water Quality February 7, 2008 DWQ Project # 08-0067 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Jeffrey Smerko North Broad Street, LLC 14600 Weston Parkway Cary, NC 27513 Subject Property: Alston Pond/North Broad Street Ut to Basal Creek [030403, 27-43-15-3, B, NSW] RETURN OF APPLICATION Dear Mr. Smerko: On January 8, 2008, the Division of Water Quality (DWQ) received your application dated January 8, 2008, to fill or otherwise impact 0.06 acres of 404/wetland, 1961inear feet of perennial stream (1471inear feet permanent impact and 49 linear feet temporary impact), and 8,999 square feet of Zone 1 Neuse River basin protected riparian buffers and 5,210 square feet of Zone 2 Neuse River basin protected riparian buffers to construct the proposed residential development. On February 5, 2008, the DWQ received additional information from you however, the DWQ has determined that your application remains incomplete and/or provided inaccurate information as discussed below. 1. In the January 15, 2008 Request for More Information on this project, the DWQ requested that you, "Please cul-de-sac stub roads or provide plans showing the entire road." All of this requested information was not included in your February 5, 2008, submittal. Additionally, we understand that the Town of Fuquay-Varina will be requesting the road located in the southern portion of the site be expanded to a four-lane road and we therefore please provide details on the proposed road eastward from the intersection with NC Highway 55. Please clearly discuss and provide plans indicating where the road terminates and what type and size of road you are proposing (dimensions, divided, two or four lane, etc.). 2. Please provide the Design Summary portion of the BMP Supplement Sheet for each proposed best management practice that will be used on the site, as well as 1" = 60' scale or larger site plans depicting the proposed footprints of the BMPs. The BMP Supplement Forms are available on the DWQ web site at: http://h2o.enr.state.nc.us/su/bmp forms.htm. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands N °e Cazolina ~tura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper North Broad Street, LLC Page 2 of 2 February 7, 2008 For these reasons your permit application is hereby considered returned. Once you have redesigned your project to address the problems and inadequacies with your application as it was submitted, you will need to reapply for DWQ approval. This includes submitting a complete application package with the appropriate fee. Please be aware that you have no authorization under Section 401 of the Clear Water Act for this activity and any work done within waters of the state would be a violation of North Carolina General Statutes and Administrative Code. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions or concerns. Sinc ly, Cyndi. Karoly, Supervisor 401 Oversight/Express Review Permitting Unit cc: Lauren Witherspoon, DWQ Raleigh Regional Office Jamie Shern, USACE Raleigh Regulatory Field Office File Copy Central Files Luke Tuschak, Withers & Ravenel, 111 MacKenan, Cary, NC 27511 Filename: 080067AIstonPondNorthBroadStreet(W ake)Returned_Application