No preview available
HomeMy WebLinkAboutNCC250876_ESC Approval Submitted_20250326 JOSH STEIN Governor 4Fv4 :M't� may„ 19>; D.REID WILSON � �;: I_ i6 Secretary vol J. ::. WILLIAM E.TOBY VINSON,JR Director NORTH CAROLINA Environmental Quality March 21, 2025 LETTER OF APPROVAL Forestar(USA)Real Estate Group Inc. Attention: Jason Rivenbark, Vice President 2221 East Lamar Blvd., Suite 790 Arlington, TX 76006 RE: Project Name: Bryson Park 4-5 Acres Approved: 55.8 Project ID: DAVID-2020-006 County: Davidson City: Arcadia Address: Hege Rd River Basin: Yadkin Pee-Dee Stream Classification: C Submitted By: Stoltzfus Engineering, Inc. Date Received by LQS: March 21, 2025 Plan Type: Revised Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. _ As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) foim requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 / ^^ ' 336-776-9800 Letter of Approval Forestar (USA)Real Estate Group Inc. March 21, 2025 Page 2 of 2 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Ashley ikara, EI Express Engineer Land Quality Section Enclosures: Certificate of Approval NCGO1 Fact Sheet c: Stoltzfus Engineering, Inc. 683 Gralin Street Kernersville,NC 27284 JOSH STEIN " � ,j( °Governor D.REID WILSON Y � ,,ry' Secretary WILLIAM E.TOBY VINSON,JR. Director NORTH CAROLINA Environmental Quality LETTER OF REGULATORY REQUIREMENTS POST-CONSTRUCTION STORMWATER Dear Financially Responsible Party: This approval is for Erosion and Sediment Control permitting only. If your project is subject to post- construction stormwater permitting requirements, you must have the post-construction stormwater permit approval (State or Local depending on jurisdiction) prior to construction of any impervious surfaces on- site. This is in addition to the NCG010000 General Construction Stormwater Permit. [Ref: § 143-214.7, § 143-215.1, Stormwater runoff rules and programs, 15A NCAC 02H .1000-.1062] Our Division maintains an interactive web-based map to help the public determine whether development activities subject to the post-construction state stormwater permitting requirements are implemented by the state, the local government or in some cases, both. The web-based map is located at the following link: NC DEQ Post-Construction Stormwater Program. If this link is not available,type the following into your browser: https://www.deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stoimwater- program/post-construction-program This map can help guide you and your consultants to determine if the site is subject to state or local post- construction requirements. Additional local city or county ordinances or rules may also apply to this land- disturbing activity. If you have any questions regarding a Post-Construction Permit or its applicability to your project, please contact the Central Office Stormwater Program Department at(919) 707-9200. Your cooperation is appreciated. Sincerely, Tamera Date:Eplin Digitally signe27dbyTamera10:46:58Eplino -05'00' Tamera Eplin, PE Regional Engineer Land Quality Section North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 336-776-9800 not:$ A' n A, A, y Cn • •"= ' o mtz et, C n A, CD - l p AVP n. '� Aa eD a n I"'' 7 sz .p N o � et A: N O -. -. r4.. 1,- l." tz UMW guile = O O v�' cf,' 1 cA til no ft© �' - © A,= ,-.. z•I ©. ';%_ Pt F 4t i_ I ,1 f CID CD •fa : e - Air IJt © �. < � IM = 0.` t- m i,°. n ,-t_ n e#10- V :11: 4 ' AD <S,-':('=..g EAP 4' r 0 0.0 .% (1') 0 : tl., ' '- ' t cilmp g-•-- Ce=mI)- co=n*A% 7t,1g_1:.. *z')i—"'` iii C :P===l I: :?4,,7„ 4t w i et iiiEJ• '' 10 r c , •• d i0,31) 0 0 i p Ait = J J r+ rn can C rt- = n �-+ �- P:i M rr. *I CD (� ram' O• C CM 0-1 A9 ar = A' • — e5 AD = = p CD ► ,• et)