Loading...
HomeMy WebLinkAbout20160477 Ver 1_CAMA Permit Application_20160510f Coastal Management ENVIRONMENTAL OLIALITY May 9, 2016 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director Karen Higgins, Compliance and Permitting Unit Supervisor DWR - Water Quality Program Doug Huggett, Major Permits Coordinator Division of Coastal Management n n� CAMA Permit Application Review MA Y1 1 0 Z016 Anthony & Michelle Barber D Q-wAr�, ao agl�:.- Est7urc�� 251 Grassy Point Road in Perquimans County Pier, boathouse, platforms, finger piers, pilings, lifts, retaining wall, fill Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/30/16 to Courtney Spears, Assistant Maior Permits Coordinator, 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE !'Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 1367 US Hwy 17 South I Elizabeth City, NC 27909 252-264-39011252-264-3723 [fax] R DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Anthony and Michelle Barber 2. LOCATION OF PROJECT SITE: 251 Grassy Point Road (Private Road), off of Camp Cale Road (SR #1357), Perquimans County, on the Perquimans River. Photo Index: 2006: 160-6845 E13 & F13 2000: 160-1755 E13 1995: 160-1643 E4 & F4 1989: Not Shown 1984: Not Shown State Plane Coordinates: X: 2746054.809ftUSE Y: 1973654.722ftUSN 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit: April 29, 2016 Was Applicant Present: Yes 5. PROCESSING PROCEDURE: Application Received Complete: May 2, 2016 Office: Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan: Perquimans County LUP Land Classification: Residential (B) AEC(s) Involved: EW, PTW & ES (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing: Septic Planned: None (F) Type of Structures: Existing: Residence and riprap along —358' of shoreline. Planned: Pier, finger piers, platform, boathouse with lift, PWC lift, double kayak lift/elevator, tie pilings, and a retaining wall. (G) Estimated Annual Rate of Erosion: 0' 7. HABITAT DESCRIPTION: DREDGED FILLED SHADING (A) Shallow Water Bottom: EW & PTW 1,991 (B) High Ground: ES 14,692sf (C) Other: N/A (D) Total Area Disturbed: 16,683sf or .38 Acres (E) Primary Nursery Area: No (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: The applicant is proposing to construct a 100' pier with a boathouse, covered platform, uncovered platform, 3 finger piers, 4 tie pilings, a double kayak lift/elevator, a PWC lift, and a 115' long retaining wall. Development will also include adding sand fill to an existing beach from the proposed retaining wall to a point approximately 5' landward of normal water level. Anthony and A. Michelle Barber Field Investigation Report Page 2 Project Setting The applicant's property is located at 251 Grassy Point Road, in Hew Hope Township, Perquimans County, along the Perquimans River. The nearest State Road is Camp Cale Road SR #1357. The property consists of 14.8 acres, with 601' of shoreline, of which —358 has been riprapped. Riprap, placed by the developer, has been displaced by wave action in some areas due to the steep angle of placement. The shoreline along approximately 180' has a bluff 6' to 8' above normal water level along There are no other structures in the water associated with the applicant's property. The shoreline tapers and forms a small sandy beach. The average elevation of the property is approximately 6' above normal water level, with most of the property being outside of a flood zone. Water depths graduate from 0' at the shoreline to -3.5' at a distance 100' offshore. Soil classification of the property is Ro, Roanoke silt loam, which is a level poor draining soil. Grassy Point is a six lot residential subdivision zoned RA (residential agricultural) by the County Planning Department. There are currently three developed lots within the subdivision, one on either side of the applicant. Located to the north of the subdivision is Whitehat Road, which is also developed for residential uses along the water, and to the south is a Baptist summer camp and conference center (Camp Cale). Development on the applicant's property has been limited to a residence and associated infrastructure. There is known submerged aquatic vegetation (SAV) habitat along the shallow waters of the Perquimans River, as shown on SAV maps. The exact location of vegetation is subject to change season to season, as well as the species. Vegetation found along the applicant's shoreline consists of widgeon grass (Ruppia maritima). Located south of the project area, and not within the proposed work area, is a small non -coastal wetland. There are significantly larger areas of wetlands on the property across Grassy Point Road, well outside of any proposed development. Vegetation on the property includes, but is not limited to, loblolly pine (Pinus taeda), bald cypress (Taxodium distichum), red maple (Acer rubrum), greenbrier (Smilax rotundifolia), groundsel tree (Baccharis halimifolia), caroling jasmine (Gelsemium's&dOervirens), cat brier (Smilax rotundifolia), poison ivy (Toxicodendron radicans), pennywort (Centella asiatica), soft rush (Juncus effuses), arrow arum (Peltandra virginica) duck potato (Sagittaria latifolia), caric sedge (Carex spp.), and a variety of ornamental shrubs and domestic grasses and weeds. There are no known geologic formations or archaeological sites associated with the applicant's property. Development Proposal The applicant's, Anthony and (Ann) Michelle Barber, propose the following development: 1) Pier and docking facility that will include the construction of a pier, platforms (covered and uncovered), a boathouse, three finger piers, a double kayak elevator (photo in application packet), a PWC lift, and four tie pilings, 2) a retaining wall with backfill for erosion control, and, 3) the placement of clean sand fill 5' from normal water level to replenish an existing beach area. r Anthony and Michelle Barber Field Report Page 3 Development proposed by the applicant is as follows: 1) Pier: 6' x 100' over open water 600sf 2) Walkway: 6' x —25' over high ground to the retaining wall 30sf (120sf overlaps fill area noted in 11) below & not added into this total) 3) Covered Boathouse: 14' x 32' over open water - (31sf overlapping pier) 417sf 4) Covered Platform/deck: 12'x 15' over open water + (add 10sf for roof overhang) 190sf 5) Open "L" platform/deck: 11' x 25' Z75sf 5' x 24' 120sf 6) Three finger piers: 2'x 17' 34sf 3'x 20' 60sf 4'x 20' 80sf 7) Kayak elevator lift: 10'x 20' 200ssf 8) PWC Lift: 3'x 5' 15sf 9) Four tie pilings for an open boat slip 10) 115' retaining wall with high ground disturbance 95' x 127.5"' 12,112sf 11) Sand fill along shore to replenish beach area 20' x 127.5' 2,550sf High Ground Fill =—14,692sf Open water Shading = 1,991sf Total = 16,683sf The total area of platforms (including the kayak elevator/ lift) and finger piers will include five separate elements totaling 959sf. The applicants are also proposing to install a —12' x 12' boatlift in the proposed boathouse. No side walls are proposed on the boathouse. The pier and docking facility, if approved, will be for the private use of the Barber family who currently own a 24' tri -tube pontoon boat, a small paddle boat and five ocean kayaks. Anticipated Impacts 1) Project will result in the shading of 1,991 of open water from the pier, boathouse, lifts, finger piers and platforms. 2) High ground fill and grading will total—14,812sf. 3) The proposed development will temporarily disrupt animal populations within adjacent waters and the project area. 4) Installation of pilings for the proposed piers may result in temporally suspending sediments in the water. 5) During the project construction it is anticipated that noise levels may periodically increase above surrounding background (ambient) levels from heavy equipment. 6) Treated wood leaches over time in surrounding waters and sediment. The amount of leaching is dependent on the type of organic material present in the water bottom substrate, oxygen levels and water movement; however, it is estimated that 90% of the leaching will occur within the first 90 days. Submitted By: Lynn Mathis Date: May 5, 2016 A To: NCDENR Field Office Received 0AY From: Anthony and Michelle Barber 251 Grassy Point Road ��AA Hertford, North Carolina 27944 DCM-EG Subject: Application for Major Permit (DCM MP -1, DCM MP -3, DCM MP -4) 1. As required the following project narrative is provided as per 6a, DCM MP -1. Submitting for review and approval of CAMA major permit to authorize the construction of single family pier and boat house consisting of the following: a 6' x 120' main access finger pier, 3' x 20' and 4' x 20' uncovered finger pier to provide access to a four piling boatlift with aluminum platform with a jet ski lift installed on the 3' x 20' finger pier. A 14' x 32' covered boat slip with a 2' x 17' uncovered finger pier. A 12' x 15' covered deck, a 5' x 24' and 11' x 25' uncovered deck and four tie pilings to secure guest boat. Construction material will consist of salt treated lumber for decking and piling with a metal roof. 2. 14' x 32' covered boat will provide storage to a triple pontoon boat 27.5 feet in length and 9.5 feet wide. The covered area 12' x 15' will provide adequate shelter from the sun for our family members that are prone to melanoma. 3. IRT DCM MP -3 our request to build a retaining wall 115 feet in total length with an overall height of 5 feet with 3 feet below ground level. Retaining wall will provide mitigation of beach shore erosion that occurs during rainfall due to land grade of subject property. Retaining wall construction material will consist of paver block and Balt treated lumber. Dem MP 4 APPLICATION for : I - ; Major Development Permit LOW -EC,- (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1. First Name Anthony MI C Last Name Barber Applicant 2 First Name Michelle MI Last Name Barber If additional applicants, please attach an additional page(s) with names listed. Mailing Address 251 Grassy Point Road PO Box City Hertford State NC ZIP 27944 Country USA Phone No. 757 - 630 - 2695 ext. FAX No. - - Street Address (if different from above) City State ZIP Email tony_michelle2@verizon.net 2. Agent/Contractor Information Business Name Agent/ Contractor 1 First Name MI Last Name Agent/ Contractor 2 First Name MI Last Name Mailing Address PO Box City State ZIP Phone No 1 - - ext Phone No. 2 - - ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> 252-808-2808 :: 1-888-4RCOAST :: www. nccoastaImanagement. not Form DCM MP -1 (Page 2 of 4) Received APPLICATION for Major Development Permit 3. Project Location VC�m�C County (can be multiple) Street Address State Rd. # Perquimans 251 Grassy Point Road d Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip Grassy Point Hertford NC 27944 - Phone No Lot No (s) (if many, attach additional page with list) 757 - 630 - 2695 ext 4, 1 1 , a In which NC river basin is the project located? b. Name of body of water nearest to proposed project Perquimans Perquimans River c Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Albamarle Sound e Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within Perquimans County 4. Site Description a. Total length of shoreline on the tract (ft) b Size of entire tract (sq.ft.) 601.02 645,832 sgft c Size of individual lot(s) d Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 6' ❑NHW or ®NWL e. Vegetation on tract Indigenous grasses, pine and oak trees and ornamental shrubs f. Man-made features and uses now on tract Rip rap and single family home g Identify and describe the existing land uses adiacent to the proposed project site. Rip rap and single family home h How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? RS (Attach zoning compliance certificate, if applicable) ®Yes ❑No [INA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k Hasa professional archaeological assessment been done for the tract? If yes, attach a copy ❑Yes []No ®NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No [INA National Register listed or eligible property? <Form continues on next page> 252-808-2808 :: 1-888.4RCOAST :: www.nccoastaImanagement.net Form DCM MP -1 (Page 3 of 4) Received APPLICATIION for Major Development Permit 1 m (i) Are there wetlands on" the site? UD� 'tf� � E C ❑Yes ®No (n) Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n Describe existing wastewater treatment facilities. Septic on site o Describe existing drinking water supply source. Well Water p Describe existing storm water management or treatment systems. Surface runoff 5. Activities and Impacts a Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b Give a brief description of purpose, use, and daily operations of the project when complete Single Family Boathouse/pier for water access. We own a 27.5 x 9.5 triple pontoon boat and several smaller water craft and would like to construct a covered area for our boats c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored Drive piling and standard construction methods d List all development activities you propose Retaining wall and pier, platform and boathouse e Are the proposed activities maintenance of an existing project, new work, or both? New work f What is the approximate total disturbed land area resulting from the proposed project? 127.5x115=14,662.5 ®Sq Ft or []Acres _ g Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No [INA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state Surface runoff i Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No [INA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No [INA 1. Is there any mitigation proposed? ❑Yes ®No [INA If yes, attach a mitigation proposal <Form continues on back> 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.not Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below a A project narrative b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Eric and Mary Lou Philips Phone No. 302-540-2234/2235 Address 228 Grassy Point Road Name Robert and Amy Hall Phone No 757-870-3817 Address 259 Grassy Point Road Name Phone No Address g A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Minor Permit # 121913A A"r) t`giwoR rjrrjAr T- Or o�Z22o15� h. Signed consultant or agent authorization form, if applicable i Wetland delineation, if necessary. jv 0_ P E a N L L j. A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner) k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1-10), if necessary If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project I further certify that the information provided in this application is truthful to the best of my knowledge. DateT� Z 6,/ (�_ Print Name Signature(24_�a,Q� Please indicate application attachments pertaining to your proposed project. ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ZDCM MP -3 Upland Development ZDCM MP -4 Structures Information Received Xr'LEG 252-808-2808 :. 1-888-4RCOAST :: www.nccoastaImanagement. not Received Form DCM MP -3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) ���� Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a Type and number of buildings, facilities, units or structures proposed One (1) Retaining wall c Density (give the number of residential units and the units per acre) N/A e If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes []No ®NA (ii) If yes, list the date submitted g Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking N/A i Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. N/A 1 Describe proposed method of sewage disposal. N/A I Describe location and type of proposed discharges to waters of the state (e g , surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). Surface run-off b Number of lots or parcels One (1) d. Size of area to be graded, filled, or disturbed including roads, ditches, etc 127.5 x 115 = 14,662.5 Sq. Ft. f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Salt -treated lumber, paver stone h Projects that require a CAMA Major Development Permit may also require a Stormwater Certification (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes ❑No ®NA (ii) If yes, list the date submitted k. Have the facilities described in Item (i) received state or local approval? ❑Yes ❑No ®NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ❑Yes ❑No ®NA If yes, attach appropriate documentation 252-808-28082 :: 1.888.4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 Form DCM MP -3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e g , well, community, public system, etc.) N/A o. When was the lot(s) platted and recorded? 4/26/2013 n. (i) Will water be impounded? ❑Yes []No ®NA (u) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ❑No ®NA ZZ'6 14 Date Received Project Name Applicant Name Applicant Signa re 252-808.2808 :: 1-888.4RCOAST :: www.nccoastaimanaaement.net revised: 12/26/06 Form DCM MP -4 STRUCTURES Received z (Construction within Public Trust Areas) ¢ DOW Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a (i) Is the docking facility/marina ❑Commercial ❑PublictGovernment ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length 120' (iv) Width 6' (v) Floating ❑Yes ®No e (i) Are Platforms included? ®Yes []No If yes. (ii) Number Sections B. D and E (iii) Length t3= (Z r A 1 S f (iv) Width 5' X 2q (v) Floating ❑Yes ®No E= 1 1' A Z S I Note. Roofed areas are calculated from dnphne dimensions. g (i) Number of slips proposed 5- (u) Number of slips existing n/a i Check the proposed type of siting: ❑ Land cut and access channel ❑Open water, dredging for basin and/or channel ®Open water, no dredging required []Other, please describe: k Typical boat length 27.5' m (i) Will the facility have tie pilings? ®Yes []No (n) If yes number of tie pilings? 4 []This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d (i) Are Finger Piers included?. ®Yes []No If yes. (ii) Number 3 (iii) Length 2 0- 20', 1(@_17' (iv) Width 1 A 3', 1 @ 4,1(cD2' (v) Floating ❑Yes ®No f. (i) Are Boatlifts included? ®Yes ❑No If yes: (ii) Number 2 Lifts, one with platform (iii) Length 12-6" 12' 6" (iv) Width 10' 12' 6" h. Check all the types of services to be provided ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ( wet slips") only, number of slips- 4 ❑ Dry storage, number of boats ❑ Boat ramp(s), number of boat ramps ❑ Other, please describe: �. Describe the typical boats to be served (e g , open runabout, charter boats, sail boats, mixed types) Mixed, ie: Pontoon boat, fishing boat, letski's, kayak's I (i) Will the facility be open to the general public? ❑Yes ®No 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimananement.net revised: 12/27/06 Forsit ®C6i MP -4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets El Toilets for patrons, Number: ; Location: Received ❑ Showers M"Lc V; " 29)16 ❑ Boatholding tank pumpout; Give type and location: i P b Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e (i) Give the location and number of "No Sewage Discharge" signs proposed. (n) Give the location and number of "Pumpout Available" signs proposed f Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g Where will residue from vessel maintenance be disposed of? h Give the number of channel markers and "No Wake" signs proposed I Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. l What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No 252-808-2808 :: 1.888-4RCOAS7 :: www-nccoastalmanagement.not revised: 12/27/06 Form DCMI MIP -4 (Structures, Page 3 of 4) v n Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes [_-]No P 9XWEC o Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ❑CW ❑SAV ❑SB ❑WL ❑None p Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) El This section not applicable a (i) Is the boathouse structure(s) ❑Commercial ❑PubliclGovernment ®Private/Community (n) Number 1 (n) Length 14 feet (iv) Width 32 feet Note Roofed areas are calculated from dnpbne dimensions. 4, GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a (i) Number (u) Length (in) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a Length b. Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a Is the structure(s) b Number ❑Commercial ❑Public/Government ❑Private/Community c Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc ) Note This should be measured from marsh edge, if present e Arc of the swing 7. GENERAL 252-808.2808 :: 1-888.4RCOAST :: www.nccoastaimanaaement.net revised: 12/27/06 At F®nii ®CFA IVDP -4 (Structures, IPage'4 of 4) a Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities 240' from Phillips and 260' from the Hall Property lines-..- 1690'& 2208' as the crow flies _ Note For buoy or mooring piling, use arc of swing including length of vessel c Width of water body IM e. e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No [INA (u) If yes, explain what type and how they will be implemented d. Water depth at waterward end of structure at NLW or NWL - 3.5 feet 8. OTHER ®This section not applicable a Give complete description s/z/z01 Date Project Name U dWy Applicant Name Applicant Signature 252-808-2808 :: 1-888-4RC®AST :: wrww.nccoastalmanagem9ent.enet Received revised: 12/27/08 1 J" \\ V:,, f � 4 1 . ��,: y` } �, _�Fi' i i •tip` ��� T ' r: 1 a � jo U c W c 0 W CL If) O V C 0 0 0 ( 0 C, LO W Nr -M0 r- z a ad22 toa)a)c. m m chi mLu, w W U�Qpo }C6F O a0LUpo No�Waz z CN0QV�� d 0co} 60mzOHCF)m LO W �voO.6C4 00N10C y N M C c Y N m m E q)y y 7 Cp ce > >zv a) a) ama. zZ yQvvQ oma) ate) d Z—c�QQ�d°)m a. a003C0 00 E ti s e s6 dog �a kms egaSi o n 0 rl s c Z � 4 1 . ��,: y` } �, _�Fi' i i •tip` ��� T ' r: 1 a � jo U c W c 0 W CL If) O V C 0 0 0 ( 0 C, LO W Nr -M0 r- z a ad22 toa)a)c. m m chi mLu, w W U�Qpo }C6F O a0LUpo No�Waz z CN0QV�� d 0co} 60mzOHCF)m LO W �voO.6C4 00N10C y N M C c Y N m m E q)y y 7 Cp ce > >zv a) a) ama. zZ yQvvQ oma) ate) d Z—c�QQ�d°)m a. a003C0 00 E s e s6 dog �a kms egaSi o n 0 s c Z �E$p a g o I� IS U Eg=g Z rl Nr i 111 t Z N . ass c Li. a. '. F O9E 9m CL o�a`m3 � a. p Q i 88d w Image of proposed Aluminum Kayak Platform Elevator Anthony & Michelle Barber Received ®fir M"EC lvde L MAJOR PERMIT FEE MATM Applicant: Ajv�yj "icif-r-uh�: ►3m6EW Selection Development Type Fee DCM % DWq % (14300 16014351000931625 6253) (24300 1602 435100095 2341) I. Private, non-commercial E] development that does not involve the filling or $250 100%($250) 0%o ($0) excavation of any wetlands oro en water areas: Il. Public or commercial E] development that does not involve the filling or $400 100%($400) 0% ($0) excavation of any wetlands oro en water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- commercial development, if General Water Quality $250 100%($250) 0%($0) Certification No. 3490 (See attached can be applied: III(B). Public or commercial development, if General Water Quality Certification $400 100%($400) 0% ($0) No. 3490 (See attached) can be applied: III(C). If General Water E] Quality Certification No. 3490 (see attached) could $400 60%($240) 40% ($160) be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water E] Quality Certification No. 3490 (see attached) cannot $400 60%($240) '40%($160) be applied: IV. For development that involves the filling and/or excavation of more than $475 60%($285) 40%($190) one acre of wetlands and/or open water areas: a . Received Ct�S �.1 . iFlE�i .4N Cjj _ ! SAY ly ti '75 off / .,j�' r . laQ _ folie. AEC ---Y=L��tlnvdpr� 0' X 127• S'= (7-, 11 Z- tp) WeTLAMb FETAT(!».J. I - 7�7- � - I t-1 RLL -(APi V rI1NL) - ;1- x 1ti7.'S'= 2�f'iSc 1 u lam% l .- - r r - . �s ' _ _,� � � � . � r , L �•n � V' � � .- - ;i ��. —', ��rr � � � t� -_ i N,4, j i - -- � ,. �� - _ � � i .'� 3' � _ fY� _ r. _ ( - � , - r .� �r��r � � � .. � t'. I.� � 5� c, ,1, - rt� �r > � � � , ti 4 - ' � n e � �l f � .. «�.. ,y ' 1�Z� �I _ . �. i� �� 1 � � � j � �, . _ _ ,-, _, � �- a ,. >_ ,� __ �r o ,a � �� _ _ ''1 _ ` ` , ~ � ,e -�' � }'. � �. • � - r � .. _ _ �'r � -,� ? ,1 -i � � � qtr ' . _ ,,, � �a ;J - � . - ' - . - , � i� . , t � . `� .. � _ �� 'i, , � _ _ t _ `i � � '� ' ' , � � F„ �t �" `, � � <_ ��, . � ', � , Q _ n' _ ` � � , • � ��� r � �r'�. i i -,1`�� - _ � � - . _{; � � • Q . - � � - , r�u � l � J � � I i. f f �r � � _ Water Depth _ @ 120' O O Tie Pilings I I (4) O O II I I II Tx 20' Uncovered II (1) Jetski in Finger Pier 60 Sq Ft Water Depth (43103' ? I I l — 3. 0 — m't_ 1-M71 _�Z� mw� om Water Depth @ 75' -Z.S' Water Depth @ 50' — Io'l , 0 Water Depth @ 20' (shoreline) O LL II F II ll 10'x 20' Boatslip vwth l II Aluminum Kayak Platform II roughly 8'x 18'/ 144 sq. ft l (ELEVATOR) O ll IL ----11- LL H II 4'x 20, Uncovered I I Finger Pier ll 80 Sq Ft I P 6'x 120' Main Pier 720 Sq Ft. 32' - 14' 12 111 l II II III 12 x 17' Uncovered Ill IIO i 011 l l Finger Pier ill I I III I '34S q Ft 14' 32 ill ll Co Bred oathouse ll ( l 12" covered drip -edge. 1I111Ft q q 448 III I III 10 o► II l 5• II II 14 ;IIID 30, . 12, xx 111_ III L -4 uI- Fevered Dec III L II I� 180 Sq Vit; l l l L ill II IN II III L TILL _2IUL - II LPier is 6'x 120'= 720 Sq Ft Uncovered Deck D+E+F=539SgFt L3 Finger Piers G+H+I=174 Sq Ft Anthony & Michelle Barber Scale 1 in. =10 ft Received DMEC M � D 5'x 24' Uncovered Deck 120 Sq. Ft. L A: Boathouse B: Covered Deck 448 Sq. Ft. 180 Sq. Ft. 12" Covered Drip Edge A Covered Boathouse B Covered Deck C Covered Drip -edge D Uncovered Deck E Uncovered Deck F Boatslip lift with Kayak Platform G Finger Pier H Finger Pier I Uncovered Finger Pier J 4 Tie Pilings P Main Pier AF?-tl. zj&j ZF i ry ISE 2 ���(- M� W n �R C N � n 61 CL W